Make an awesome Project Management Dashboard with Excel (Free download ~ Part 1)

Поделиться
HTML-код
  • Опубликовано: 21 авг 2024

Комментарии • 286

  • @chandoo_
    @chandoo_  3 года назад +102

    Hi all... Hope you found the video useful.
    Like this comment if you want to see an "ADVANCED" version of this gantt chart with progress indicator, switch between daily / weekly and option to exclude weekends.

    • @AXNJXN1
      @AXNJXN1 3 года назад

      LOL... 'This' is the simple version?? (great vid, just very complex to the junior user).

    • @franciscojavierrodriguezna6896
      @franciscojavierrodriguezna6896 3 года назад

      Great vid, Could be possible to add actual progress to that Gant chart?

    • @santosjanvictorm.911
      @santosjanvictorm.911 3 года назад

      Lovely Video clip! Sorry for the intrusion, I am interested in your initial thoughts. Have you ever tried - Weydaniel Organized Dominator (do a search on google)? It is a good exclusive guide for getting 7000 plus project management and business templates minus the hard work. Ive heard some amazing things about it and my m8 after a lifetime of fighting got amazing results with it.

  • @chandoo_
    @chandoo_  3 года назад +8

    Hello all... The full series is out now. Watch the next videos here -
    Part 2 - Project progress charts - ruclips.net/video/C0F_VKlTX1c/видео.html
    Part 3 - Preparing the final dashboard - ruclips.net/video/Exlj5qH0rhc/видео.html

  • @GauravShah05
    @GauravShah05 3 года назад +16

    This is fantastic, thanks!
    Features that I'd like to see:
    1. Exclude weekends and holidays
    2. Effort estimation
    3. Fill the activity Gantt chart with planned vs actual progress
    4. Move completed activities to history and always view activities in progress and upcoming activities first
    5. Select the Week for which you want to view the data ( to view past activities)

    • @chandoo_
      @chandoo_  3 года назад +8

      You are welcome Gaurav...
      You can easily customize the file to add these things.
      1. Use workday() instead of +1
      2. Effort = duration x hours per day
      3. This is something I plan to cover in an advanced video
      4. You can use Power Query to remove old & completed activities when they reach pivot table.
      5. Add a form control and link it to either start.date or change the formula logic.
      All the best.

  • @moarabia8586
    @moarabia8586 3 года назад +7

    I must have been living under a stone that I didn't notice your youtube channel before. Your tools and tips on the internet have helped me so many times over the last 2 decades. You are brilliant!

    • @chandoo_
      @chandoo_  3 года назад +1

      Thank you Mo. So good to have you here too.

    • @sowmyagopalan504
      @sowmyagopalan504 11 месяцев назад

      You've been my go to right form 2011 but I used your website alone not your videos.

  • @chandoo_
    @chandoo_  3 года назад

    👉 *Read this If you have trouble with MIN & MAX dates* in Pivot tables:
    This seems to a problem with Excel 2016. You can use Power Pivot measures to get the same result.
    Right click on the table name in pivot table field list and select "add measure" option. Then name the measure as "start of activity" or something and use the =firstdate(activity[start date])
    Do the same for max, but use the DAX formula =LASTDATE()

  • @bfree2read
    @bfree2read 3 года назад +4

    Wonderful. Years ago I used Excel for Projects because it gave me more flexibility that MS Project and was more accessible for others. This is a more robust PM than the ones I created long ago. Thank you!

    • @chandoo_
      @chandoo_  3 года назад +1

      Thank you Elizabeth... Excel offers flexibility and creativity that other tools lack.

  • @PSmith-ie9jx
    @PSmith-ie9jx 8 месяцев назад

    Every time I get stuck, I know you will have great resources to help. You rock!

  • @laididee
    @laididee 3 года назад +1

    The Lego mini-figures absolutely made my day! I just found your channel while looking for info about Power BI and I'm already excited to watch more! Keep up that wonderful sense of humor 😁😁

    • @chandoo_
      @chandoo_  3 года назад

      Thanks DB. I love 😍 LEGO and it was adding a bit of that to this video series. Welcome to my channel btw...

  • @seekerforlife
    @seekerforlife 3 года назад +2

    Chandoo, trust me you are everybody’s friendly bandhu 🙃
    Thanks for making life a lil easy through your informative content.

  • @tanmaypalkar9861
    @tanmaypalkar9861 Год назад

    You're an "excel"lent teacher. Thanks a ton, Chandoo!

  • @fonsverkoelen2734
    @fonsverkoelen2734 3 года назад +2

    Hey @Chandoo. I just came for first time on your channel. I subscribed.
    This is gold !
    Thanks !

  • @wayneedmondson1065
    @wayneedmondson1065 3 года назад +4

    Awesome Chandoo! Lots of great tips and tricks in this video. Thanks for sharing :)) Thumbs up!!

    • @chandoo_
      @chandoo_  3 года назад +1

      My pleasure 😊

  • @jwoodCAD
    @jwoodCAD Год назад

    I'm loving your videos, you keep me entertained long enough to learn things!

  • @chandranisarkar1668
    @chandranisarkar1668 3 года назад +1

    Thank you so much. This tutorial made Gantt chart making a piece of cake. Amazed by the procedure, I visited your website which turned out to be a gold mine. Kudos🤩🤩

    • @chandoo_
      @chandoo_  3 года назад

      Thank you Chandrani. Welcome to my channel and site. 😀

  • @pehchankaun8085
    @pehchankaun8085 3 года назад +4

    Thank you and a bear hug, Poorna.

  • @dharmendrakumarsingh7947
    @dharmendrakumarsingh7947 3 года назад

    Thank you that in the current lock down I happen to visit one of your videos and could connect with you in this life of mine ..... I do work a Lot in excel and I am aware of many short cuts and tricks but you are really amazing ! Thanks for enriching the life of poor souls ! My compliments and prayers for you ! Thanks a ton ! I must have watched many videos of yours by this time and look forward for all new uploads.

    • @chandoo_
      @chandoo_  3 года назад

      Thank you Dharmendra for your love and appreciation. Stay safe.

  • @shoebhakeem3131
    @shoebhakeem3131 Год назад

    Anna.. Baahu and Bhalla made me chuckle .. too much creativity boss!! You can even create an analysis to find why did katappa kill baahubali!! Lol..
    Jokes apart.
    I love the way you deliver your lectures. More power to you, keep going!!

  • @raghvendrasingh9721
    @raghvendrasingh9721 3 года назад +9

    Sir this is simply insane. I'll surely use it to track my own work performance 😀😍😍 blessed that I came to know about you❤❤❤❤

    • @chandoo_
      @chandoo_  3 года назад +2

      Thanks Raghavendra.

    • @arindamdutta9371
      @arindamdutta9371 3 года назад +2

      Chandoo bhai ko mein 10 years sey track kar raha hoon. From his website
      Yes mate, a Chandoo a legend

    • @chandoo_
      @chandoo_  3 года назад

      @@arindamdutta9371 Thanks Arindam for all your love and support :)

  • @velisubuhlebuti9522
    @velisubuhlebuti9522 3 года назад

    Chandoo the man! Our very own Wiz ✌️

  • @rainymayfourth
    @rainymayfourth 3 года назад +1

    Thank you so much, Chandoo! This is very useful for me. Downloaded your templates on your website! Thank you so so much!

    • @chandoo_
      @chandoo_  3 года назад

      You are welcome Rainymay...

  • @pektuspektus612
    @pektuspektus612 3 года назад +2

    This is great. Will definitely use this in future.
    Thanks Purna!!!!!!!

    • @chandoo_
      @chandoo_  3 года назад

      Thank you Pektus...

  • @azharuddinshaik7204
    @azharuddinshaik7204 2 года назад

    Your pronunciation of 'Gantt' and referencing it to Wendy... got me rolling on floor.... overall I enjoyed the tutorial...

  • @Billabong0110
    @Billabong0110 10 месяцев назад

    Excellent tutorial and thanks for the freebies!!!

  • @excelworx8712
    @excelworx8712 3 года назад +1

    This is awesome work, Chandoo. Now I am thinking on how to use PTs from another sheet to do calculations at the next level

    • @chandoo_
      @chandoo_  3 года назад

      Thank you.. Go for it!

  • @exploreandunravel5773
    @exploreandunravel5773 3 года назад

    Hi Chandoo , thanks bro , I came here when I saw your smile on the thumbnail ) ...

  • @forihuel
    @forihuel 3 года назад +1

    Hi Chandoo! this video is gold! I have 2 questions:
    1.- is there a way to get the into the Gantt "in progress" tasks and
    2.- how can we red flag delayed tasks?

  • @pritikane4448
    @pritikane4448 3 года назад

    Liked the episode. Humor is good.. Concept and teaching is amazing.

    • @chandoo_
      @chandoo_  3 года назад

      Thanks Priti. :)

  • @feastnjourney
    @feastnjourney 3 года назад +1

    love this.. very clear explanation

    • @chandoo_
      @chandoo_  3 года назад

      Glad you think so!

  • @kroyle5328
    @kroyle5328 2 года назад

    Awesome video as always Chandoo, this will help be massively. Thanks.

  • @ankitpinara1738
    @ankitpinara1738 3 года назад

    What a trick sir, never thought about using color filter like that.

    • @chandoo_
      @chandoo_  3 года назад

      Glad you liked it

  • @vincentchan7397
    @vincentchan7397 3 года назад

    Awesome. Can't wait for part 2.

    • @chandoo_
      @chandoo_  3 года назад +1

      Thanks Vincent... won't be long.

  • @robiojigolo
    @robiojigolo 2 года назад +1

    Awesome video, great work. You make it look so easy 😃

  • @doshanriches1
    @doshanriches1 3 года назад

    Awesome stuff ...can't wait for your ADVANCED deck :)

  • @rahulmohanty8120
    @rahulmohanty8120 3 года назад +1

    Awesome !!!!

  • @lotter3008
    @lotter3008 2 года назад

    Wholesome and informative

  • @shaikhsalman2134
    @shaikhsalman2134 8 месяцев назад

    Excellant explanation. Thanks a lot sir.

  • @laurailunga7000
    @laurailunga7000 3 года назад

    WOOOOW!! Brilliant!! Thank you

    • @chandoo_
      @chandoo_  3 года назад

      You are welcome Laura...

  • @matoell
    @matoell Год назад +1

    You are amazing

    • @chandoo_
      @chandoo_  Год назад

      Thanks for the love and super Matoell 😍

  • @MrsCathT
    @MrsCathT 2 года назад

    Fabulous! Thank you!

  • @rekhapons3400
    @rekhapons3400 3 года назад

    Thank you much Chandoo , great video as always. Looking forward for your 2nd part of this video 👍🏼⭐️⭐️⭐️🙏⭐️👍🏼

    • @chandoo_
      @chandoo_  3 года назад

      Won't be long Rekha...

  • @rahulshelke7624
    @rahulshelke7624 2 года назад

    Thanks.. pls make video on inventory management dashboard

  • @ApteryxRex
    @ApteryxRex 2 года назад

    A great video Chandoo. Thinking of marketing campaign tracking I would add a days remaining column, highlight weekend and public holidays.

  • @chandraprakashmatam2341
    @chandraprakashmatam2341 3 года назад

    This is awesome my friend !! Liked, commented :) and subscribed!! Cheers

    • @chandoo_
      @chandoo_  3 года назад

      Thanks Chandra and welcome to Chandoo community.

  • @canirmalchoudhary8173
    @canirmalchoudhary8173 3 года назад

    I learned to apply multiple conditional formatting on single cell in which order matters.

  • @amndjoy
    @amndjoy 3 года назад +4

    This is awesome! How would I break up the dates into AM and PM sections?

    • @chandoo_
      @chandoo_  3 года назад +2

      You are welcome.
      Instead of =previous date + 1, try this pattern
      first cell after start.date = previous date + 0.25
      next cell = previous date + 0.75
      now repeat this.

    • @amndjoy
      @amndjoy 3 года назад

      @@chandoo_ Thanks!!

  • @salahuddin502
    @salahuddin502 3 года назад +1

    Bhai, You are awesome!

    • @chandoo_
      @chandoo_  3 года назад

      Thank you Salahuddin... 😊

  • @ashitoshjojare
    @ashitoshjojare 2 года назад +1

    Hi sir I am using Excel 2013 and I am not able to Right click on the table name in pivot table field list , so what should i do now ??

  • @margarettnwankpah927
    @margarettnwankpah927 3 года назад

    Amazing, as usual!

    • @chandoo_
      @chandoo_  3 года назад

      Thank you Margarett.

  • @pgkannan
    @pgkannan 3 года назад

    Excellent one quick and superb fast. Thank you Chandru ❤️

  • @siddharthkumarpathak5341
    @siddharthkumarpathak5341 3 года назад

    This is so good to learn, straight subs to your channel. Thanks a lot for that simple explaination.

    • @chandoo_
      @chandoo_  3 года назад

      Thanks brother...:)

  • @arimenon2039
    @arimenon2039 3 года назад +1

    Chandoo great tips. Thanks for sharing your knowledge. I am looking for a way to stay organized in my day today things to do lists. Any tips on where and how to manage “ things to do” tasks while on a job. I use pen and paper becoz I can be flexible the way I want yo use it. Being an IT consultant I sometimes draw a process a flow diagram to capture my thoughts in things to do list and so on. Any suggestions is welcome. Thanks Chandoo.

    • @chandoo_
      @chandoo_  3 года назад +1

      Thanks Ari... I use notebooks and have built a collection of them over years as I am _kinda_ old school. But for more intense projects, I use One Note and add events to my calendar. These days, for my RUclips videos, I have been making a list of *things to do* on my paper notebook and check them off as I progress. Hope that helps.

  • @ramasubbukamatchi3026
    @ramasubbukamatchi3026 3 года назад

    i like this video, you can add the display week by using scroll bar option , it will easy to display by weekly progress.

    • @chandoo_
      @chandoo_  3 года назад

      Thanks Ramasubbu... Yes, this can be easily enhanced with many other features.

  • @Saveourcountry
    @Saveourcountry 3 года назад

    Amazing, I’m definitely gonna use this bro

    • @chandoo_
      @chandoo_  3 года назад

      Thank you & Let me know how it goes...

  • @frenan82
    @frenan82 3 года назад

    Amazing... a lot of tips ! thanks!

  • @BENBRAYM
    @BENBRAYM 3 года назад

    Thank you man for this great work.

    • @chandoo_
      @chandoo_  3 года назад

      You are welcome Ben

  • @nischaljain3025
    @nischaljain3025 3 года назад +1

    Hi Chandoo, can you add 2 things in the gantt chart as per project requriement.
    1. Plan dates & Actual dates
    2. Critical pathes of the process.
    Please advice

    • @chandoo_
      @chandoo_  3 года назад

      Thanks Nischal for the comments. Adding Plan vs. Actual view is straight forward. You can do it as a challenge.
      Adding Critical path is tricky with Excel formulas alone. I suggest not using Excel for performing CPM / PERT analysis.

  • @babucp3215
    @babucp3215 3 года назад +1

    Really appreciate

  • @aquarius8075
    @aquarius8075 3 года назад +1

    Спасибо, очень полезно.

  • @vreddym
    @vreddym 3 года назад

    Super, Chandoo

    • @chandoo_
      @chandoo_  3 года назад

      Thank you Venkat.

  • @KKB-tt4lj
    @KKB-tt4lj 3 года назад

    You are awssome!

  • @hazemali382
    @hazemali382 3 года назад +1

    💥💯 BoOM

  • @Q8Patriot
    @Q8Patriot 3 года назад

    Great and simple, thanks alot

    • @chandoo_
      @chandoo_  3 года назад

      Glad you liked it!

  • @thyagaraja4796
    @thyagaraja4796 3 месяца назад

    Amazing

  • @babarqureshi5043
    @babarqureshi5043 3 года назад

    Thank you very much. I will share it in my circle.

    • @chandoo_
      @chandoo_  3 года назад

      Thanks for the share.

  • @tharakreddy
    @tharakreddy 3 года назад

    wow you are amazing explain

  • @MohammedSuraif
    @MohammedSuraif 3 года назад

    Great video!

    • @chandoo_
      @chandoo_  3 года назад

      You are welcome Mohammed.

  • @mahansor8295
    @mahansor8295 3 года назад

    Many thanks Chandoo

    • @chandoo_
      @chandoo_  3 года назад

      You are welcome Mehran

  • @swatimundhra4918
    @swatimundhra4918 2 года назад

    You are awesome

  • @krupajoshi6449
    @krupajoshi6449 3 года назад +2

    Hi, can you also include planned start and end dates along with Actual start and end dates. Also if the Gantt chart can show the highlights of the dates or the lag that is caused.

    • @chandoo_
      @chandoo_  3 года назад +1

      Thanks for the suggestions. I will consider these features when making v2.0 of the gantt chart.

  • @virtualdealhunter
    @virtualdealhunter 3 года назад

    I'll have watch from your first video to understand this rocket science

    • @chandoo_
      @chandoo_  3 года назад

      You won't regret the journey. Awesomeness to you.

    • @virtualdealhunter
      @virtualdealhunter 3 года назад

      @@chandoo_ sure
      will go through all relevant latest videos as u’ve been doing this for a really long time
      Great content…
      Satisfying…

  • @taizoondean689
    @taizoondean689 3 года назад

    Thanks Sir really it will helpful to all of us👍

    • @chandoo_
      @chandoo_  3 года назад

      You are welcome Taizoon.

  • @damndirtyape1363
    @damndirtyape1363 3 года назад

    Excellent, thank you for showing more power of excel. +1 sub

    • @chandoo_
      @chandoo_  3 года назад

      Welcome to the club...

  • @greatindia1943
    @greatindia1943 6 месяцев назад

    Sir very informative. Can you help me link to download. Also can we show target vs Actual in Gantt chart ?

  • @Prathamesh__Katira
    @Prathamesh__Katira 3 года назад +1

    Good work

  • @sami_2119
    @sami_2119 3 года назад

    Nice but very fast. Thankyou brother

    • @chandoo_
      @chandoo_  3 года назад +1

      You are welcome Sam.. may be you are on a 1.5 speed setting? Adjust the speed or pause the video at various points to take notes.

  • @alexlyon7895
    @alexlyon7895 3 года назад +2

    Chandoo, Thank you for this video! is it possible to have 3 different teams (in my case architects, engineers and construction teams) then create projects or jobs for those teams as well as a actual team members for each job?

    • @chandoo_
      @chandoo_  3 года назад

      Hi Alex.. you can tweak this file to make such project plans. Alternatively, you can create a base version with all team & people data and then split to three files (and may be use Power Query to bring relevant data to each file) and use that to make the dashboards.

  • @satyamjoshi3224
    @satyamjoshi3224 3 года назад +2

    hello chandoo thanks for the videos and your website is filled with great lessons currently I''m working on excel form for daily production. which is for my manufacturing plant. and i learnt lot from you ... thank you once again . PEACE

  • @Tcb964
    @Tcb964 2 года назад +1

    This is an awesome tutorial. Although, when the start and end dates on the 'people and data' page are empty (before starting a project for me), the pivot table removes the min/max columns. Is there any way I can keep these here even when the date fields are empty on the other table. Thanks!

  • @rakeshpangail9854
    @rakeshpangail9854 3 года назад

    Awesome....

  • @Intaworld
    @Intaworld Месяц назад

    Do your templates provide monitoring for key stages and dependencies?

  • @MrDhunpagla
    @MrDhunpagla 3 года назад

    Brilliant 👍

  • @muhammadsidik4744
    @muhammadsidik4744 3 года назад

    this is awesome thank you

    • @chandoo_
      @chandoo_  3 года назад

      Glad you like it!

    • @muhammadsidik4744
      @muhammadsidik4744 3 года назад

      I can't make column person adn colum % with Xlookup formula. can you help?

  • @AjayPanicker
    @AjayPanicker 3 года назад +1

    Except "Gantt chart" everything else sounded serious ;)
    cheers

    • @chandoo_
      @chandoo_  3 года назад +1

      Thanks Ajay :) I like peppering my videos with a dad jokes 😅

    • @AjayPanicker
      @AjayPanicker 3 года назад

      @@chandoo_ You are really an adorable person. Totally original.

  • @therelaxation-music7106
    @therelaxation-music7106 2 года назад

    plz make a video about Mis Report

  • @arwenisabellavesperng926
    @arwenisabellavesperng926 Год назад

    Hi there Chandoo🌈🌞, I really learned a lot from you videos, and is currently following your Project Management Dashboard Excel Demo. I tried applying IF Formulae to get rid of those Blank Date after the slicer applied, it was not working. I wonder if you could teach me how to do that (About those 0 value in your video shown at 10:40 clips). Thank you very much!🌈🌞

  • @ai651221
    @ai651221 3 года назад

    很清楚的教學,感謝您!!~

  • @sanjeevpareek8861
    @sanjeevpareek8861 3 года назад

    Hi chandoo, awesome video but please explain formulas which you use like xlookup and relationship bcoz I am not able to use this in Excel please...

    • @chandoo_
      @chandoo_  3 года назад

      Hi Sanjeev... please refer to the article here for a detailed tutorial of the dashboard. It has extra links on the individual bits too.
      chandoo.org/wp/interactive-project-dashboard-with-excel/
      Happy learning.

  • @karthikd5427
    @karthikd5427 2 года назад

    Please make this in power BI too ...

  • @sakissalonika
    @sakissalonika 3 года назад

    Thank you for the great video! Can you have in the same progress bar in the Gantt Chart view, but with different color, the Actual Start and Actual End dates of the project?

    • @chandoo_
      @chandoo_  3 года назад +1

      You are welcome. I am hoping to make v2.0 of this template with some additional features. It would be released in future. Stay tuned.

  • @pushkalupadhyay
    @pushkalupadhyay 2 года назад

    Pls explain Composite index

  • @Prathamesh__Katira
    @Prathamesh__Katira 3 года назад +1

    How we can accommodate multiple project in same file or one file?? Also how multiple stakeholders can update their progress??

    • @chandoo_
      @chandoo_  3 года назад

      With Excel 365, you can place the file on onedrive or teams folders and others can update it. As the focus here is on one project, it would be tricky to add multiple in this format. See my other article for a project portfolio dashboard - chandoo.org/wp/design-project-portfolio-dashboard/

    • @Prathamesh__Katira
      @Prathamesh__Katira 3 года назад

      @@chandoo_ is it possible for your to shared actual locked excel template of PM dashboard

  • @JuanPerez-hb5kb
    @JuanPerez-hb5kb 3 года назад +1

    Never mind, I figured it out

  • @kmvit2007
    @kmvit2007 3 года назад

    This is amazing Chandoo!!! I just have a question. I have my Gantt Chart arranged in mmm-yy format, instead of your format. How do I highlight the current month column?

    • @chandoo_
      @chandoo_  3 года назад +1

      Thanks KLrishnan... Instead of =TODAY(), check for =AND(MONTH(date cell) = MONTH(TODAY()), YEAR(date cell) = YEAR(TODAY()))

    • @kmvit2007
      @kmvit2007 3 года назад

      @@chandoo_ Thanks so much Chandoo!! It worked :) but I didn't start my formula like how you showed in the video with =(date cell)= .... it wasnt working when i did that... it worked only when i started the formula with =AND(........) .... I hope that wont cause any issues...

  • @krishnansubramaniam1255
    @krishnansubramaniam1255 2 года назад

    Great share ! thx much ! How would you insert a ◄ at the start and ► at the end of the gannt bar. I can do it comparing the activity start date to the date on top of that col ; ie activity start date = the col date then col = ◄, and similarly for the end of the bar. But since the bar is made of format control it doesnt fit in. The entire bar also has to be made up of shapes like ▇ ; any thoughts ?

  • @richardbowers12
    @richardbowers12 6 месяцев назад

    I cannot get the relationships to work if the cells are blank and also it says there are duplicate values

  • @moutazeldeib9481
    @moutazeldeib9481 Год назад

    What is the benefit in relationship, I do not see that we have used here, am I right? please advice

  • @saurabh17sharma68
    @saurabh17sharma68 3 года назад

    Sir u r gr8

    • @chandoo_
      @chandoo_  3 года назад

      Thank you Saurabh...

  • @09_shadellaparamastri9
    @09_shadellaparamastri9 3 месяца назад +1

    Sapa yang di sini karena tugas manpro cung🤏🏻

  • @ABHIBSD
    @ABHIBSD 2 года назад

    On changing the date to min or max in pivot table it is showing error i.e. Cannot apply formula on text. Why and how to solve it?

  • @bent.6817
    @bent.6817 2 года назад

    Hi, I am having trouble with the AND function - it is not returning an TRUE values. - Mr. B