Vert Ramp Time Lapse construction Perth Australia
HTML-код
- Опубликовано: 17 сен 2014
- Time Lapse 1 x 7mp picture every minute. One hour of work on the skate ramp equates to two seconds of footage.
Ramp is 12.5 feet high,
11ft transition,
1.5ft of Vert and 32ft wide.
Step by step construction of a skate ramp.
Grant Huggins Salt Building services Perth Western Australia combined with a dedicated crew of mates built the ramp in under a week.
Builders:
Sam, Brad, Andrew, Shaun, Rocco, Herb, Bucky, Byron, Steve, Brett, Grant E. and Junior.
Location of the ramp will not be provided. - Животные
Won’t ever be a better ramp in Perth. Miss this place
I'm so impressed that they could build this in only 6 minutes
Tottoaly not timeblapse
@@mariuszrzeszutko4908 Yea def not :D
Such an awesome build! You guys are shreddin it too!
Nice ramp--I used to have the ramp above vidlers surf shop on the second floor high street freo in the late 80,s now that was a secret until a board went out the window onto the street cheers KWOKKA
love the jimi hendrix
hendrix =]
I know why you are keeping it a secret, but it's such a bloody shame Perth has to be like that. I miss Vertigo.
Michael Wilson it’s no huge secret mate.
How long did that take to do? And what was the total cost?
IFreakingEatPeople tells u how long in description and cost mite varie on wood prices and exact design 2seconds = 1 hr actual time , all themguys theres some money just in labour let alone price of wood, somewhere to put it,if its public i rec.. doing in steel cuz little twats will burn it
How long is the flat? 10ft? 12ft?
SRVmotoman it’s 12.5ft high.
With all due respect, I know the height is 12.5ft, per the description. But how long is the flat/bottom in between the transitions?
That’s what I was thinking. I hate short flat transaction. Why? 😫
How much did it cost?
Everything.
is that built using about 7-8 ft transition? or bigger ?,working out the correct trans is hard bit for me ,esp if out of more than one piece of wood cheers be nice to see the trannie design played normal speed :)
10.5ft transition 1&3/4 ft Vert. Took about 8 days. All the boys volunteered thier time free. Materials cost about $8000. At trade price.
7.9 days of work if you worked full 24 hour days
thats actually nuts