KONE NanoSpace™elevator replacement process video

Поделиться
HTML-код
  • Опубликовано: 3 авг 2024
  • KONE NanoSpace™ elevator replacement process video demonstrating the main phases during the elevator replacement and installation process when an old elevator is replaced with new KONE NanoSpace elevator.
    At KONE, our mission is to improve the flow of urban life. We provide elevators, escalators and automatic building doors, as well as solutions for maintenance and modernization to add value to buildings throughout their life cycle.
    www.kone.com
    / konecorporation
    / kone
  • НаукаНаука

Комментарии • 197

  • @blackkissi
    @blackkissi 3 года назад +34

    thanks youtube algorithm.

  • @express777100
    @express777100 10 лет назад +13

    first time i have seen a nanospace lift installed. it is a lot easier and less graft than we had to do in the 70s and 80s with high speed passenger lifts.

  • @sautran1841
    @sautran1841 10 месяцев назад +2

    0:00 Introduction
    0:24 Site survey
    0:39 Old elevator disassembly
    1:55 Installation
    2:30 Shaft components
    2:57 Elevator controller
    3:53 Hosting unit
    4:11 Balancing weights
    KONE Nanospace
    More comfort in less time

  • @pekkajahkonen1308
    @pekkajahkonen1308 4 года назад +1

    KONE refuses to pay anything to the inventor of this idea but puts a trademark and is marketing this revolutionary new hoisting concept.

  • @DerSolinski
    @DerSolinski 11 месяцев назад +1

    Ohhhh smart.
    If I interpret this correctly the counterweights are a bit overbalanced to coax a bit more payload from the motor since this seems to be push/pull.
    Elegant system.

  • @alexandrehonorio8580
    @alexandrehonorio8580 5 лет назад +9

    Já fui montador da kone .é já montei ese tipo de elevador. Excelente equipamento.

  • @ZZ9ProductionsOFFICIAL
    @ZZ9ProductionsOFFICIAL 6 лет назад +13

    This does seem like an interesting design of lift. :)

  • @doankara5672
    @doankara5672 2 года назад +1

    Great ideas and great solutions. Congratulations.

  • @vishalyawalkar5304
    @vishalyawalkar5304 6 лет назад +12

    Awesome technology nano space
    First time I saw this unic technology we hv seen monospace then mini space nano space experience of comfort

  • @Tee.NZ.07
    @Tee.NZ.07 5 лет назад +27

    Lol the amount of pits I've seen in water..... 🤔 Looks cool tho

    • @ssaraccoii
      @ssaraccoii 3 года назад

      Exactly what I was thinking.

    • @DJSpinSter2004
      @DJSpinSter2004 Год назад +1

      That’s quite literally why this elevator doesn’t exist in the US and elevator companies stopped making bottom-drive systems. lmao

  • @aegystierone8505
    @aegystierone8505 5 лет назад +13

    Hmm this video makes it look so easy, those who work in the lift industry will know that the installation is far more complicated.....

    • @QNY96
      @QNY96 5 лет назад +1

      Aegys TierOne if you know what you’re doing, nothing is complicated

    • @shiladityaray3137
      @shiladityaray3137 5 лет назад +3

      This is just to give you an overview.....

    • @pissandcornflakes9119
      @pissandcornflakes9119 4 года назад

      the elevator is larger than the doors and smells like 40 year old slim jims

  • @1enterthedragon
    @1enterthedragon 5 лет назад +13

    Depending on how many openings there is in hoist way of the new elevator, determine how long it takes to to build.. Not no 2 weeks from beginning to end.. No way..

  • @matthewminnie4900
    @matthewminnie4900 2 года назад

    Kone makes some nice lifts

  • @Aawsomeguy
    @Aawsomeguy 2 года назад +2

    When I saw the controller on the 1st floor right next to the elevator in a panel I then knew it was a MRL (Machine Room Less) system before the bottom mounted drive machine was even shown. They take much less power then the larger geared and gearless drive machines in a rooftop/basement elevator machine room.

  • @seth8982
    @seth8982 5 лет назад +43

    Then the pit gets water in it and wreck the machine.

    • @Kufikwasf
      @Kufikwasf 4 года назад +1

      Was just about to say the same, Otis did this years ago and it was horrible.

    • @LordVoltRod2c
      @LordVoltRod2c 4 года назад

      That's why you need a FitPit Elevator System.

    • @Hyndaiz
      @Hyndaiz 4 года назад +3

      They say that the machine can survive subwater conditions.

    • @NukeAttackWarnings
      @NukeAttackWarnings 3 года назад +2

      There's pumps for shaft pits that pump out any accumulated water on the shaft floor preventing just that.

    • @DJSpinSter2004
      @DJSpinSter2004 Год назад

      That’s why bottom-drive systems aren’t made anymore in the US as far as I know.

  • @dannybodros5180
    @dannybodros5180 3 месяца назад

    A marvellous piece of engineering, but it's concerning that both the motor and its control unit are located at the bottom of the lift pit. All it takes is one leak/flood and your motor is fried.

  • @matix000
    @matix000 5 лет назад +1

    Amazing!

  • @donalddavis581
    @donalddavis581 4 года назад +5

    Great idea until the pit gets flooded....LOL and I guarantee it will

  • @boeing747_23
    @boeing747_23 Год назад

    Kone elevators are so smart

  • @wizbang68
    @wizbang68 6 лет назад +7

    Wish there was an option to not have the motor in a pit. Live in Florida and our community was built in the early 70's and the elevators need to be replaced. But, one of the issues is they need to get everything out of the pit due to tropical season at least once or twice a year flooding the pit area. As a result they have to shut down the elevators during any high rain periods to prevent the motors from being shorted.

    • @SamSitar
      @SamSitar 6 лет назад +1

      or have a second motor above the hoistway as a part time replacement.

    • @615TNwilson
      @615TNwilson 6 лет назад +2

      They do have alternative options to counter your problem.

    • @hectichorse
      @hectichorse 5 лет назад

      The motor usually isn't stored in the pit

    • @charlesmurphy1510
      @charlesmurphy1510 5 лет назад +2

      wizbang68 what about a sump pump and pit?

  • @elevatorsasansorler
    @elevatorsasansorler 6 лет назад +2

    good job

  • @axexexel2672
    @axexexel2672 3 месяца назад +1

    kone is number 1 in callback rate. next to otis and schindler. based on our building equipped with different elwvator brands😅😅😅😅

  • @uhno123no9
    @uhno123no9 5 лет назад +1

    Well done

  • @kommusaidhu6913
    @kommusaidhu6913 4 года назад

    Nice job

  • @ekoharyanto5041
    @ekoharyanto5041 3 года назад

    Cool KONE

  • @ramsinghshyam7762
    @ramsinghshyam7762 4 года назад

    Very nice 👌

  • @pradipbhosale1007
    @pradipbhosale1007 7 лет назад

    very nice

  • @Yogiblackforest
    @Yogiblackforest 11 месяцев назад

    Nice elevator

  • @vikramsingrathod7134
    @vikramsingrathod7134 6 лет назад

    Very Nice

  • @ZZ9ProductionsOFFICIAL
    @ZZ9ProductionsOFFICIAL 6 лет назад +1

    What types of buildings are these most common in?

  • @anirbanmajumdar3118
    @anirbanmajumdar3118 3 года назад +1

    AS THE MACHINE IS IN THE PIT IT WILL CREATE PROBLEM IN RAINY SEASONS IN PLACES WHERE WATER LOGGING IS AN ISSUE

  • @seanjuth
    @seanjuth 5 лет назад +1

    I ❤️ you Kone!

  • @upanddownadventures
    @upanddownadventures 10 лет назад +2

    Very unique design.

    • @Finntrans
      @Finntrans 10 лет назад +1

      yes, it is. But I don't know if they're available in the US

    • @elevatorsinrussia2597
      @elevatorsinrussia2597 9 лет назад

      Finnish Liftours No they're not available in US.

    • @aaronrennyvargheseOriginal
      @aaronrennyvargheseOriginal 3 года назад

      @@elevatorsinrussia2597 rip, but I'm asian 😀

    • @DJSpinSter2004
      @DJSpinSter2004 Год назад

      @@Finntrans They’re not in the US, and for good reason too.

  • @mikebaranov1835
    @mikebaranov1835 4 года назад +3

    2 weeks of over time and building being shut down , good luck dragging the new rails in the shaft, only 16 foot long oh wait you got 2 counter weight frames ! which require double rails for them too ! wow what a better way to spend tons of money for 5 more square feet

  • @LandNfan
    @LandNfan 3 года назад +1

    I know of cable lift elevators and hydraulic elevator for just a few floors. But I have wondered why elevators did not use a jack screw mechanism. I suppose the flex in the drive screw would be a problem with taller installations. Screw drive would be very smooth and quiet with little car fall risk except for major structural failure.

    • @DerSolinski
      @DerSolinski 11 месяцев назад

      Screw lifts exist but only in very small industrial applications and then only with a very low head.
      They are *very* expensive to build and to maintain.
      Also slow as F.
      They are only one step up from gear lifts, yes with a rack and pinion.

  • @madhabbara8816
    @madhabbara8816 5 лет назад

    Super Lift

  • @TheTheo58
    @TheTheo58 4 года назад +1

    This installation looks similar to an Otis Gen 2 MRL with compensating sheaves top of the shaft guiding the rope from the counterweight of a 2:1 roping normally anchored to the top of the shaft, but over to the opposite (left side) of the cab. Right side ropes upwards to the gear-less machine's driven sheave to the compensating sheave on the counterweight. The elevators were recently modded this year, compensating sheaves were placed top of the cab, one each end. Hoist ropes were anchored on cab side, and counterweight side top of hoist-way.

  • @bakeandWake
    @bakeandWake 3 года назад

    itll take two weeks for the other subs to finish power, fire, phone, masonry and plumbing once the install is complete...then u have to get on the inspectors schedule

  • @wdowa94
    @wdowa94 11 месяцев назад

    I hope that they already do know how often there is water and high humidity in bottom of the shaft?

  • @aquabestindian
    @aquabestindian 3 года назад

    What would be the ball-park figure in INR for a six-story building?

  • @jimmyzhang4854
    @jimmyzhang4854 5 лет назад

    what kind of software is it for design and simulate elevatror?

  • @deborahjohnson4234
    @deborahjohnson4234 6 лет назад +2

    Phoebe Johnson 😎😎😎😙👍👍👍👍👍👍👍👍👍👌👌👌👌👌

  • @systemazsoyus-ng3ue
    @systemazsoyus-ng3ue 4 месяца назад

    well well amazing 😉 I love ihope be for ever

  • @jimmyzhang4854
    @jimmyzhang4854 5 лет назад

    someone please tell me the software to design this stuff and simulation

  • @cryptoreno3282
    @cryptoreno3282 3 года назад +1

    2 weeks? lol. Maybe in the test tower. The other trades have to get fire life safety, power, phone lines, etc. brought in. Plus an entire demo is a weekish. Imagine scheduling inspection before you even man the job.

  • @thatdutchguy2882
    @thatdutchguy2882 6 лет назад +1

    👍-up

  • @freddoflintstono9321
    @freddoflintstono9321 5 лет назад

    So where does the safety break hide in this design (clamps the lift to the rails if it's detected to go too fast)?

  • @_-Tiger-_
    @_-Tiger-_ 4 года назад

    2020 год. Зачем мне это выскочило в рекомендациях, тем более, что этой темой никогда не интересовался???

  • @chris746568462
    @chris746568462 5 лет назад +1

    4:35 Why is the stator of the motor rotating...

  • @hasibularif7715
    @hasibularif7715 5 лет назад

    I work in a Shanghai Mitsubishi company, Bangladesh

  • @maypek4803
    @maypek4803 Год назад +1

    Can the air ventilation of the air flow be control . Example the speed and the qaulity of the AIR circulation from the ceiling at the time length to be control it or just by the setting selected time assess and access temperory or permanent by the controller technician or just by the setting computer machine generate auto only at a selected timing daily or weekly or monthly of the speed air flow circulation inside the lift of any ventilation guidelines to be learn and known and study.

    • @KONECorporation
      @KONECorporation  Год назад +1

      Hi, thanks for reaching out. Please contact your local KONE team and they’ll be happy to help you. You can find contact details for where you are from the local website: kone.com/en/local-website-selector.aspx
      Thank you!

  • @rieon-plumbingfan
    @rieon-plumbingfan 5 лет назад

    Who needs a machine room when you have ECODISC MRL’s?? And 100000x more efficiency with KONE?

  • @Kris-yf7dt
    @Kris-yf7dt Год назад

    I ❤ lifts

  • @AnandYT00
    @AnandYT00 Год назад

    👌👌👌💪

  • @gunplow
    @gunplow 4 года назад +1

    Next generation elevator will be electric magnetic rail

  • @uhno123no9
    @uhno123no9 5 лет назад

    Wow

  • @scottsliftsX1
    @scottsliftsX1 2 года назад

    Who made the ecodisc lift voice

  • @TanweerAhmed
    @TanweerAhmed 5 лет назад

    Very good video
    #tanweerahmed

  • @akaleweledmesfin1049
    @akaleweledmesfin1049 3 года назад

    we have been expected more supportive treating from the company????

  • @bribriexcitementfuels4808
    @bribriexcitementfuels4808 3 года назад

    Beno love you

  • @jessiebrown8843
    @jessiebrown8843 5 лет назад +1

    Since when is the motor room in the pit??

    • @firesurfer
      @firesurfer 3 года назад

      When there is no room anywhere else.

  • @kailashshukla2668
    @kailashshukla2668 2 года назад

    What is in side momin size.

  • @user-df1rv9wq5l
    @user-df1rv9wq5l Год назад

    Өтте сапалы екен

  • @mustafadasgin5765
    @mustafadasgin5765 3 года назад +1

    That lift is now 7 years old 😂😂

  • @ats_arbitr
    @ats_arbitr 4 года назад +1

    Боюсь, что мусор, пыль и вода уничтожит это электродвигатель.

  • @eid-said
    @eid-said 5 лет назад

    جيد

  • @hungrynapps
    @hungrynapps 6 лет назад +6

    2 weeks? 🤔😲

    • @beefflow
      @beefflow 6 лет назад

      hungrynapps no shit...where I work 1 elevator takes 6 months...

  • @KimmyAlburo3287
    @KimmyAlburo3287 5 лет назад +1

    We don't have nanospace here.

  • @valdenirsantos2587
    @valdenirsantos2587 6 лет назад

    Poço encher de água pra kkkk

  • @Maloy7800
    @Maloy7800 4 года назад

    TWO WEEKS!? That's "fast and trouble free"!? From the initial pitch I thought you'd say something like two days. How long does it take when it's "slow and troublesome"?

  • @trainzinnit9232
    @trainzinnit9232 5 лет назад +1

    Is KONE nanospace good for a house??

    • @rosssmith7237
      @rosssmith7237 4 года назад

      Yes

    • @TheDragonFire123
      @TheDragonFire123 3 года назад +1

      Likely not. These are intended for replacement of older lifts, not new installs.

  • @nasimelevatorservice2458
    @nasimelevatorservice2458 2 года назад

    👍

  • @JitendraKumar-lh2uy
    @JitendraKumar-lh2uy 2 года назад

    Kone me complete kaise kar sakte contractor par

  • @seanblacketer
    @seanblacketer 6 лет назад

    Meanwhile mine still leaks

  • @ShubhamKumar-qx7cd
    @ShubhamKumar-qx7cd 5 лет назад

    Sir apply process Bata saktey Ho join karna hai company

  • @ambecement1855
    @ambecement1855 5 лет назад +1

    Price for 400 Kg

  • @elevatorsinrussia2597
    @elevatorsinrussia2597 9 лет назад +1

    We don't have NanoSpace in Russia.

  • @grandelevatoroblox2
    @grandelevatoroblox2 2 месяца назад

    Otis watching this : 💀

  • @abena7590
    @abena7590 Год назад

  • @seanjuth
    @seanjuth 6 лет назад +1

    Why isn't this available in the Americas? Oh I just forgot we are fat

  • @finnishcruises7157
    @finnishcruises7157 4 года назад

    Lol i got stuck in kone elevator Finland Tampere lol

  • @Electricliftvlogs1234
    @Electricliftvlogs1234 3 года назад

    I work in rancon elev

  • @beebee5633
    @beebee5633 9 дней назад

    1:07-1:08

  • @umbertoamico9546
    @umbertoamico9546 5 лет назад

    Meglio un impianto tradizionale troppe pulegge.

  • @annakowalkowski4046
    @annakowalkowski4046 3 года назад

    Chic.

  • @meenamuthukrishnan9488
    @meenamuthukrishnan9488 6 лет назад

    Get full comprehensive or else 💱💱💱💱💱💱💱💱💱💱💱💱💱💱💱........... Suppose any leakage in the pit

  • @SaintSlon
    @SaintSlon 4 года назад

    Ага все так красиво, что придраться не возможно) только в реале все не так как на видео особенно в Израиле! Демонтаж старого лифта идёт абы как! Демонтаж порталов полный ппц, открытые участки шахты не закрываются как следует тип на всю высоту проёма! А всего лишь ставят поддон и все! Так что даже ребенок может туда упасть.

    • @SaintSlon
      @SaintSlon 4 года назад

      А монтаж нового лифта, занимаются хаперы/ про рабы и т.д. выполняю свою работу на отеб.. лиж бы бабки получить! А сколько они косяков оставляют после себя! Потом приходится притягивать болты по всей шахте, и то смотря как еще выставят рельсы) ато еще ловите ли по всей шахте шарманку играть будет₪

  • @bakeandWake
    @bakeandWake 3 года назад +1

    motor in the pit sounds like a recipe for disaster

  • @Hotdoghunter55
    @Hotdoghunter55 8 месяцев назад

    I thought Kone was pronounced as cone not connie

  • @mdikramkhan9412
    @mdikramkhan9412 5 лет назад

    I need job in lift company
    Experience 8 year's

    • @ahmedfekry135
      @ahmedfekry135 5 лет назад

      Ahmed Fekry

    • @bestonweb3990
      @bestonweb3990 4 года назад

      send your cv.are you experience in MRL KONE ELEVATORS.husainmoosa786@hotmail.com

  • @nathan5508
    @nathan5508 5 лет назад +1

    Why is this on my recommended?

    • @metricdeep8856
      @metricdeep8856 5 лет назад +2

      But more importantly......why did I watch it?

  • @kakurerud7516
    @kakurerud7516 4 года назад +1

    i dont trust belts. seems like a system designed to have high maintenance costs.

    • @one_step_sideways
      @one_step_sideways 4 года назад +1

      The motor is placed at the bottom of the pit, where the entire bottom gets flooded, of course it's a system designed to have very high maintenance costs.

    • @SparkWater
      @SparkWater Год назад

      Job security

  • @bablu1437
    @bablu1437 5 лет назад

    Left

  • @zapateena
    @zapateena 2 месяца назад

    Their closed

  • @pilavlabne8921
    @pilavlabne8921 4 года назад

    türkiye 🇹🇷

  • @Happyhayley1982
    @Happyhayley1982 6 лет назад +1

    IT NOT KONNE ITS KONE

    • @fdsman
      @fdsman 6 лет назад +2

      I think their PR and advertising departments have it right.

  • @Lee1591
    @Lee1591 4 года назад +1

    2 WEEKS?!?! Haha

    • @Lee1591
      @Lee1591 4 года назад

      TRG Lifts yea it is not possible without cutting corners and sacrificing some safety smh.

  • @iran.elevatorhydroalic
    @iran.elevatorhydroalic Год назад

    Helo

  • @danielserrano8600
    @danielserrano8600 Год назад

    2 weeks from start to finish 😂😂😂 2 weeks maybe for the inspection

  • @niqxtfn3403
    @niqxtfn3403 4 года назад

    why did i come here you may ask well
    Kone is my name