Scaffoldless Rail Installation Part 3 | Installation and Alignment | Wurtec

Поделиться
HTML-код
  • Опубликовано: 20 авг 2024
  • Wurtec’s Plumb Line Drop Tool and Rail Alignment
    Starter Kit are used to determine where the first pair of main elevator rails should be installed. The worker will position the preset Wurtec Drop Line Tool at the top of the hoist way. He will then drop two weighted Music Wires from the ends of the Drop Line Tool down the hoistway. He will then check the position of the music wire against the hoistway wall at each of the landings.
  • ХоббиХобби

Комментарии • 16

  • @manikantakoruprolu
    @manikantakoruprolu 7 лет назад +1

    super

  • @widetechservicesalgerie1105
    @widetechservicesalgerie1105 6 лет назад +1

    Safe and easy way ,but unvailable in our country , Algeria.

  • @jayrajladani7049
    @jayrajladani7049 5 лет назад +2

    I want this tools of rail alingment in india how to i get them

    • @WurtecInc
      @WurtecInc  5 лет назад

      Thanks for inquiring! Please send an email to sales@wurtec.com and we will help you get the products.

    • @caroleast9636
      @caroleast9636 16 дней назад

      The tools are simple. You can make them yourself easily and if you are capable of installing a lift then making these tools shouldn’t be a problem.
      The difficult part is understanding how to go through this process and then having the right skills to do it. The tools are just an aid to those skills. They won’t do it for you.

  • @akshaythakare6464
    @akshaythakare6464 6 лет назад

    good job

  • @classiq876
    @classiq876 5 лет назад

    What about a windy pit? The plumb ball will be all over the place.

    • @danielquezada3058
      @danielquezada3058 5 лет назад

      classiq876 put the weight or the plumb bob in a bucket of water

    • @pgk1940
      @pgk1940 4 года назад +2

      I am now retired after 40 years in the elevator industry, 22 of them in installations. During that time, I hung a lot of plumb lines, and because even with small diameter plumb wires and 50 lbs. line weights, it takes very little wind to cause the lines to move, not to mention lines having a habit of being accidentially moved while being worked around, once the lines had settled into place in the pit during the initial hanging, they were then fastened on to the face of a board that was in line with the face of the rails in the pit.
      Maybe on a 2 or 3 landing install, a bucket of water might suffice to steady a line, but on a high rise, there'd be more time spent on waiting for the lines to settle than actually working on aligning the rails.

    • @chriscarr6016
      @chriscarr6016 4 года назад

      How about hire a real elevator mechanic before someone dies

    • @claytonno2571
      @claytonno2571 7 месяцев назад

      @@pgk1940 good explanation

  • @ImronHakam
    @ImronHakam 7 лет назад +1

    whats brand ?

  • @caroleast9636
    @caroleast9636 16 дней назад

    Fancy graphics. Sounds like they’ve heard about it being done, but spoken by someone who has no experience of actually doing it. I’ve done

  • @user-rn7nr9cw8y
    @user-rn7nr9cw8y 8 лет назад

    مرحبا بكم ممكن سعر

  • @asbaslam8260
    @asbaslam8260 Год назад

    Asb aslam

  • @billbokaro3494
    @billbokaro3494 3 года назад +1

    Who entertaying this "device", don't has a little imagine about real work ,out of screen & table. Sitting on a fifth point and talking some stupid ideas.