Metro Manila Skyway Stage 3 update as of December 2017

Поделиться
HTML-код
  • Опубликовано: 19 ноя 2024

Комментарии • 87

  • @tifofh
    @tifofh 7 лет назад +4

    There seems to be a major change in the specs of Section 4 A Bonifacio. The original plan was it was supposed to be 2x2 carriageway - like what Skyway did in Stage 2 from Sucat to Alabang elevated toll plaza. But it looks like it will be 3x3 and BRAVO is what I can say to that.

    • @dmitrivalencia
      @dmitrivalencia  7 лет назад

      finally 3x3 then i hate 2x2 it is scary especially drivers do not know how to be in the center of the lane while driving.

    • @silentbutdeadly1925
      @silentbutdeadly1925 7 лет назад +1

      Nice observation. The addendum in the contract for extended Skyway stage 3 is still on process and it might take awhile or its depend on the government if they let Citra build it and add it to the PPP contract or they will just shoulder the construction.
      Also, did you know that the plan of NAIAex entry/exit ramp in tambo area is ONLY on Macapagal blvd. Megaworld shoulder the cost and construction of the extension to benefit their casino business in the area, on the other hand SMC the prime contractor of NAIAex don't mind the changes as long as it wont cost them. :)

    • @tifofh
      @tifofh 7 лет назад +1

      Interesting point Ian. I think what you pointed out as revisions/addendum/expansion of the original PPP contract also covers what RSA recently proposed 1. extension of NAIAx to Buendia - which I suppose is Buendia/Roxas Blvd. 2. extension of NAIAx to BGC - from the the spaghetti junction of NAIAx with Skyway Stage 1 elevated and at grade - extending NAIAx to BGC cannot impede or conflict with the C-5 extension currently being built to connect C-5 to Merville and CAVITEx beyond. This is a MetroPac Tollways franchise. The only elevated Skyway link that I can imagine is from elevated to the ARCO South Ayala former FTI development spur/ramp/expressway from elevated Skyway. This is easily covered by Citra Metro Manila Skyway's approved franchise for the C-6 or so called Metro Manila Expressway from Bicutan-Cainta-Rodriguez-Batasan-Marilao NLEx. This will mean a junction will be constructed just south of the C-5 connector being built right now. From what I remember, NAIAx is already covered by the Ramos era franchise given to Citra Skyway in 1996. DoJ Secy. de Lima and DPWH Babes Singson already respected Citra's ownership of NAIAx skyway, but for some strange reason, Citra's new partner - SMC - thru RSA said yes to a PPP bidding, despite the extortionate franchise fee that DoF supremo Ces Pursima was charging, which costs more than the actual cost of construction! Metro Pac's counterbid seemed like a feeble attempt to just give the PPP bid the semblance of competition. With the franchise fee, which DoF Secy Dominguez already junked on his first day as PRRD Secy of Finance, costs went up so high that San Miguel nearly maxed its credit ceiling, causing problems for the flow of cash to Skyway Stage 3. When it asked Citra to come up with their cash partnership, Citra baulked, resulting in an unresolved spat between the partners to this day. Speaking of linkages, Skyway Stage 3 can link with the NLEx Connector and NLEx Harbor link if the design team of Citra can come up with an expressway link from Stage 3 Section 3/4 A Bonifacio to C-3 NLEx Harbor link. But funds are tight right now.

    • @silentbutdeadly1925
      @silentbutdeadly1925 7 лет назад +1

      @Hernando the proposal for NAIAx extension to BGC is buyable idea for the government, but not for MetroPac, because it will have a great effect on their projected income for C5 Link project. You might confuse the proposed NAIAx extension connecting to C5 link expressway (via SM area) from NAIAx to Buendia because I havent heard about this proposal yet. If ever this will be first.
      Connecting C5 to skyway is part of the bulk propose project of SMC to the government however NEDA is still studying other proposed project for C5 to skyway connectivity via ARCA South (Metro Manila Expressway). If this proposal will push through SMC will join as one of the bidder for the hybrid PPP.
      You're right about the proposed NAIAx during Ramos presidency, due to Asian Crisis in 97 this project was put on the back burner. I must say I'm not savvy on the case file by SMC to Citra regarding extortion of their executives and all I know is that they are still on going legal battle.
      In regards with the linking of NLEX-SLEX Connector to Skyway Stage 3, the main issue on this project is the right of way, Metro Pacific Tollways Corp have all the funding they need to implement this project, but DPWH cant give them the RAW requirement for now.

    • @tifofh
      @tifofh 7 лет назад +1

      I only read an announcement by RSA about Buendia, and you are probably right. Extending NAIAx to Buendia need not take Roxas Blvd and use Macapagal instead - as Metro Pac has an unsolicited proposal to connect Harbor Link expressway from R-1 to CAVITEx via Roxas Blvd and parts of Macapagal. But this is an unsolicited proposal which needs a NEDA Swiss Challenge. RSA's Buendia NAIAx extension - I am not sure if that is part of the NAIAx franchise but if it isn't - it doesn't take much to approve it. As for the ARCA access road - Skyway Stage 1 has always had an approved franchise to do an access road to FTI , which can be extended to connect to C-5 - maybe this is the NAIAx to Skyway to BGC connection that RSA is talking about. I think Ayala will partly fund the ARCA access road and off ramp and from there, an access expressway to C-5. Also RSA proposed to extend NAIAx from NAIA terminal 1 all the way to SM near Sucat-Dr. Santos Ave. If you travel Makati bound on Skyway elevated, there are zones on the shoulder where you will notice that the parapets are not planted on the pavement - which are preparatory for an off ramp.. I think there are 2 - one is an off ramp for the Bicutan end of C-6 or the Metro Manila expwy from Bicutan to Rodriguez - Batasan - La Mesa parkway - then Marilao NLEx. The other prepared cut off may well be the ARCA south access ramp which can easily accomodate traffic to BGC from elevated Skyway, though a long way from NAIAx. So far, the C-5-Merville-CAVITEx connector has no opposition. Its the Skyway end of NAIAx that may need an elevated connector to reach Lawton as the off/on ramp into BGC. As for the connector - Secy Villar's frustration is the RROW acquisition. Metro Pacific has completed 50% of Harbor Link and Harbor Link, connects to the connector. So far these links and extensions we discussed are still part of the original franchise of both NLEx [Metro-Pac] and SLEx [San Miguel-Citra] so there will be no need for competitive bidding. As for Skyway stage 3, right now, what is on the drawing board is a simple off ramp exit to C-3. What will make sense is for Stage 3 to extend over C-3 - elevated of course - then connect to NLEx Harbor Link which links to Skyway Stage 3 at the PUP common alignment of Section 2. The case of SMC vs. Citra is that San Miguel is accusing 2 high ranking Indonesian - Manila based - officers of Citra for misusing the 50M advance of San Miguel Infra to capitalize a Citra company in charge of Stage 3. It has become so toxic that the 2 Indonesians -long time and comfortable living in the PHL - had to go back to Jakarta to avoid being arrested as criminals. RSA claims that Citra was dragging its feet at the scheduled increase in capital of Citra Skyway Stage 3. RSA accused the 2 officers of using his 50m to be the Citra increase in capital. The trouble began when SMC was aggressive and bidding high for the tollway projects. SMC has no problem as it has access to their many "Top Frontier" funds. And yet, SMC had to slow down disbursement because lenders were afraid SMC might "hollow out" taking on too much debt. SMC need not bid for the La Mesa parkway because we as far as it is concerned, SMC is the only one interested in making this garden parkway and is also the approved bidder - sometime in November. Both SLEx and NLEx are using existing franchises to generate expressways though!

  • @petergo4782
    @petergo4782 7 лет назад +1

    A. Bonifacio road was repaired already, I hope they do some road repair at Araneta ave specially the stretch from puregold qi central to sm centerpoint

  • @babesocampo717
    @babesocampo717 7 лет назад +1

    PINOY JOYRIDE SALAMAT SA UPDATE NG SKYWAY STAGE 3 SKYWAY STAGE 3 UPDATE JAN 2018 AT LRT 2 JAN 2018

  • @razorback9999able
    @razorback9999able 7 лет назад +3

    Section 1 has to open in 2018, to minimize heavy traffic for a while. It would cut the excessive travel time by portions.

  • @bonyuri5211
    @bonyuri5211 7 лет назад

    I can see the double deck process of the skyway! That is my favorite section in skyway!

  • @litsmean
    @litsmean 7 лет назад +1

    Dimitrivalencia, nice video and music :) Thanks for the update in Skyway Segment 3. Hope the constructions are 24 hours to lessen the traffic in EDSA...it is really urgent this skyway Mr. Tugade you have to wake up and fast track this project.

  • @verfeb12
    @verfeb12 7 лет назад +1

    Huge improvement! Thanks Dmitri for sharing to us again.

  • @christophers.o622
    @christophers.o622 7 лет назад

    Great update sa Ang Skyway 3 sa Section 1, 3 & 4 sa A. Bonafacio.

  • @wavemaker2077
    @wavemaker2077 7 лет назад +4

    A map at the start of the video can help us better understand where the development is going on and how big/long the project is. Thanks for the vid, btw.

    • @dmitrivalencia
      @dmitrivalencia  7 лет назад +3

      the pip map will return next update, removed it since i just wanted it to be simple in this update. thank you for watching! :-)

  • @femalumongo361
    @femalumongo361 7 лет назад +2

    Wooww ang ganda na ang manila ngaun sana sa pag uwe ko sa pinas lalo pang mapa unlad ng ating Pangulo. Ang buong Pinas sa taon 2020.Inshallah. Yarab.

  • @oherman
    @oherman 6 лет назад

    Is there a technical reason bukod sa power lines kung bakit N spans ang ginamit instead of T spans sa araneta avenue area from aurora to e rodriguez?

  • @annarodriguez4275
    @annarodriguez4275 7 лет назад +5

    salamat sa update, december na mukhang malabo magbukas ang section 1 sa 1Q quarter ng 2018, sablay na sablay ang target completion ng dpwh for sec 1 mas kapanipaniwala kung 1Q ng 2019 matapos ang section 1, yun sec 2 ganon pa rin natutulog sa pansitan :)

    • @jhems2222
      @jhems2222 7 лет назад

      Joseph Rodriguez atat mo naman alam mo ba ang pinaka tagal sa construction ay foundation kasi may curing period.... pinakamadali ang platform.... otot mong blue...

    • @joelgarven1989
      @joelgarven1989 7 лет назад

      agree ako.. hindi basta basta ang foundation nun.. kalimitan umaabot tlga ng ilang buwan. madali na tlga kapag ginawa ay ang flatform, kabit lang ng kabit sa flatform niya

    • @annarodriguez4275
      @annarodriguez4275 7 лет назад +1

      sir paano po ako naging atat sinabi ko nga na imposible madiliver ng dpwh yun 1Q completion date? si sec villar po sabihan ninyo ng atat dahil siya nag announce ng 2018 opening.

    • @albertohusay3002
      @albertohusay3002 7 лет назад

      hindi lang foundation ang nagpapa bagal dyan. yung NAIA express di naman ganyan ka bagal.

    • @ivancas9556
      @ivancas9556 7 лет назад

      Masmhaba kc ung skyway 3 sir kesa sa naiax

  • @chester197
    @chester197 7 лет назад +2

    ganda ng background music
    mo Mr. Dmitrivalencia... pang-epic... shadow of the colossus theme song...

    • @dmitrivalencia
      @dmitrivalencia  7 лет назад

      Chester Bob Visperas aahhh! you are familiar with this? 🤣🤣🤣!!!

    • @chester197
      @chester197 7 лет назад +1

      medyo po... yan po kasi yung theme song ng upcoming ps4 game na shadow of the colossus... kung tutuusin eh remastered version po yan ng naunang laro d
      sa ps2 na same name din... at saka po exclusive ps4 lang po yung upcoming na game na yan... sa 2018 pa po ang release...

    • @dmitrivalencia
      @dmitrivalencia  7 лет назад

      Chester Bob Visperas i used to play this sa ps 😁 lumilipad ang controller hehehehehe!!!

    • @chester197
      @chester197 7 лет назад +1

      hehe!!! ako nga po hanggang nood lang po sa YT ng gameplay ganda kasi ng graphics... 😀😀😀

  • @rosemarie400
    @rosemarie400 7 лет назад +3

    ISA LANG MASASABI KO iba talaga ang admenistration ngayon. kumikilos nagtrabaho na hindi katulad ng mga liberal ginagawa nila sa bayan magpayaman lang... PROTECT OUR BELOVED PANGULONG DUTERTE Mabuhay ang pilipino....

  • @gabrieldominic2381
    @gabrieldominic2381 7 лет назад +1

    Sana naman gawan na ng contractor ng paraan kung paano nila maikakabit yung yung nawawalang girder at yung paglipat nung dambuhalang poste sa 13:02. Hehe. Pero wow, much improvement sa buong project, and kudos to Section 2 dahil gumagalaw-galaw na nang konti. Hehe.

    • @dmitrivalencia
      @dmitrivalencia  7 лет назад

      sana puwede manuod at kailan gagawin no? hehehe

    • @rubybinas4522
      @rubybinas4522 7 лет назад +2

      nice video.last time po may drone video kayo nyan maganda rin ang pagkavideo mo sir.

    • @dmitrivalencia
      @dmitrivalencia  7 лет назад

      thank you for watching po :-)

  • @CraigRodmellMusic
    @CraigRodmellMusic 7 лет назад +2

    Thanks for filming and posting. That was quick!

  • @paulocuento9949
    @paulocuento9949 7 лет назад

    sir, please make a video on the part of sampaloc manila section of this project... thanks in advance

  • @yerinjungyeringfriend8987
    @yerinjungyeringfriend8987 6 лет назад

    Kaya nagkakatrapik sa skyway mula alabang hanggang Buendia Exit kasi dahil sa construction zone pero matatapos din yan ung sa tollgate tapos na ung sa banda ng may c5 exit

  • @lucraniaultra4488
    @lucraniaultra4488 7 лет назад +2

    Sa 0:38 may steel girders para sa flyover

  • @berry1306
    @berry1306 7 лет назад

    Dmitri bakit po antagal po matapos sa section 2

  • @ricardocapre4667
    @ricardocapre4667 7 лет назад

    as i watch the video i noticed that there are portions of the road that are bumpy, that is dangerous when the vehicle is running at 100 kph much more when the road is slippery during wet season....i suggest that a professional driver test at 180 kph be conducted before it is turned to public use

  • @princerobert2525
    @princerobert2525 7 лет назад

    Pinaka mahirap gawin yung section 2 maraming kabahayan matatamaan’ yan ba yung double deck.

  • @nurhancosain5878
    @nurhancosain5878 7 лет назад

    Makaka less po ba yan ng traffic sa edsa? From mindanao.(question lang po)

  • @cheesy_mokyu
    @cheesy_mokyu 7 лет назад

    THANK YOU SA PAG RECOMEND SAKIN

  • @kiane9465
    @kiane9465 7 лет назад

    Avenida Rizal naman po next 😊

  • @AlexandPedro
    @AlexandPedro 7 лет назад +5

    Do you think the project will be done by 2018?

    • @annarodriguez4275
      @annarodriguez4275 7 лет назад +3

      target completion for Section 1 is 1Q of 2018 which is impossible, but its possible by Dec 2018 they can finish Section 1.

    • @dmitrivalencia
      @dmitrivalencia  7 лет назад +1

      i guess section 1 next year? wishful hehehehe!

    • @oherman
      @oherman 6 лет назад

      In the araneta area where I live, the girders aren't up yet and the spans aren't even built yet for the most part.
      And then we have the high-tension power lines to contend with. That one is a real pain because some of them requires a total relocation.
      So yeah, the optimistic ETA would be 2 years from now. But if they crack their whips, the earliest done would be the one from Buendia to Quirino Avenue.

  • @1966bluemax
    @1966bluemax 7 лет назад +3

    Section one is almost done

  • @babesocampo717
    @babesocampo717 6 лет назад

    PINOY JOYRIDE HAPPY NEW YEAR PO

  • @babesocampo717
    @babesocampo717 6 лет назад

    PINOY JOYRIDE NAKITA KO PO SA GOGOLE STREET VIEW SA AP NG GOGLE MAP SA SKYWAY STAGE 3 SA G ARANETA

  • @babesocampo717
    @babesocampo717 6 лет назад

    PINOY JOYRIDE NAKITA KO PO SA GOGOLE STREET VIEW SA AP NG GOGLE MAP

  • @raulmonderojr6965
    @raulmonderojr6965 7 лет назад

    Saan po Ang exit?

  • @DeaconG1959
    @DeaconG1959 7 лет назад +1

    Oh jeez, Dmitri, WHAT. A. MESS. I don't think the driver's holidays are going to be merry and bright, ya think? Maybe your drive should be imported into Need For Speed:Payback! XD
    On the one hand, you can see that progress is being made; on the other hand, the places where nothing's happening (or even started) is maddening. The next eighteen months are probably going to be excruciating, hopefully they'll open the Skyway in stages to keep someone from going postal with an AK.
    Have a Merry Christmas and a prosperous, safe New Year! And no bumwine! Drink the good stuff as you throw your keys somewhere where you can't find them and do bad things with your SO!

    • @dmitrivalencia
      @dmitrivalencia  7 лет назад +1

      i am waiting for the installation of the girders along Buendia flyover p14 to p20 that should really excite me hehehehe! thank you for watching!

  • @babesocampo717
    @babesocampo717 6 лет назад

    PINOY JOYRIDE MAYNAKITA AKONG PAGBABAGO SA SECTION 4 SECTION 3 SECTION 2 SECTION 1 NG SKYWAY STAGE 3

  • @ontheground4592
    @ontheground4592 7 лет назад

    Dang it! It might finish in 2020 if this will continue like this.

    • @dmitrivalencia
      @dmitrivalencia  7 лет назад

      i have high hopes that we would be seeing section 1 next year .. hopefully....

    • @Liamsales2008
      @Liamsales2008 3 года назад

      Hello im from 2021 the skyway stage 3 has open at dec 2020 but other ramps are underconstruction to complete in next year

  • @babesocampo717
    @babesocampo717 7 лет назад

    PINOY JOYRIDE MAY NAKITA AKONG PAGBABAGO NG SKYWAY STAGE 3 SA A BONIFACIO SA SECTION 4

  • @mariac.amante529
    @mariac.amante529 7 лет назад

    Can the skyway end?

    • @babesocampo717
      @babesocampo717 6 лет назад

      Maria C. Amante HINDI PA PO TAPOS ANG SKYWAY STAGE 3 GOD BLESS YOU

    • @Liamsales2008
      @Liamsales2008 3 года назад

      Hello im from 2021 the skyway stage 3 has open at dec 2020
      But other ramps are under construction to complete in next year

  • @arielalvinabordo2228
    @arielalvinabordo2228 6 лет назад

    it is good

  • @lorencesorilta5880
    @lorencesorilta5880 2 года назад

    Monday 5:27pm
    Tuesday 5:46pm

  • @everettedualino5074
    @everettedualino5074 7 лет назад

    Hindi nagdagdag ng tao at equipment, yung sa section 1 lumipat lang ng section 2, 2014- 2018 (?)= 4(?) , 2018 (?) +4 (?)=2022 (?). Mas mahirap ang section 2 double deck. mga right of way , mga ilog, at pasikip ng pasikip hirapan ang operator ng mga equipment.Maaring hirap sila sa materyales kaya mabagal.

    • @silentbutdeadly1925
      @silentbutdeadly1925 7 лет назад +2

      The real reason why Skyway Stage 3 section 2 suffer massive delay is because of final design of NLEX-SLEX connector project linking to skyway stage 3 and final design/costing of PNR South project. You have to consider that Section 2 will run along PNR track which will be elevated if the PNR South project push through.Materials and manpower have nothing to do with the delays.

    • @gelatinocyte6270
      @gelatinocyte6270 7 лет назад

      ian
      Is the NLEx-SLEx link an elevated highway as well?

    • @silentbutdeadly1925
      @silentbutdeadly1925 7 лет назад

      The NLEX-SLEX Connector Project is an elevated 6 lane expressway. If youre wondering why it havent started yet, is because of the ROW issue. You see if the original plan for this project will be follow DPWH need to remove houses, school, chapel, market places, warehouse and factories along PNR track. (Antipolo street in manila, some near C3 area and PUP area).
      DPWH is weighing the idea of double deck expressway instead of 6 lane all level elevated expressway to avoid buying those properties and will be build within PNR Track, Since PNR North Project and PNR South Project are both elevated in the metro manila area, Metro Pacific the contractor for the NLEX-SLEX Connector project is trying to come up with the new design or new layout for the expressway just to have an option.

    • @babesocampo717
      @babesocampo717 6 лет назад

      Everett Edualino SECTION 1 PO THIS YEAR AYON PO SA DPWH GOD BLESS SIR AND GOD IS WATCHING YOU

  • @newmsioworld3525
    @newmsioworld3525 7 лет назад

    THIS WILL COMPLETE IN 2020.

    • @Liamsales2008
      @Liamsales2008 3 года назад

      Hello im from 2021 the skyway stage 3 has open at dec
      2020

    • @Liamsales2008
      @Liamsales2008 3 года назад

      The mmss3 is complete in 2021 but other ramps are still under construction to complete next year

  • @princerobert2525
    @princerobert2525 7 лет назад

    Pinaka mahirap gawin yung section 2 maraming kabahayan matatamaan’ yan ba yung double deck.

  • @arielalvinabordo2228
    @arielalvinabordo2228 6 лет назад

    it is good