Rigid Pavement/ PQC National Highways construction
HTML-код
- Опубликовано: 11 окт 2018
- Dear friends,
This video is regarding activities in Rigid Pavement (PQC- Pavement Quality Concrete). Very helpful to construction field personals like Engineering student's, professional, teachers, contractors, supervisors etc. Please like, Share and Subscribe for more videos (Subscription is free of cost). And don't forget to Comment. Stay blessed Stay happy.
Visit more construction videos here....
Expansion joint on Major Bridges
• Expansion joint on Maj...
(RMC)Concrete Batching Plant in construction industry
• (RMC)Concrete Batching...
Vertical Pile load test by Static Method
• Vertical Pile load tes...
Piling in Engineering Construction of Bridges
• Piling in Engineering ...
RE Wall Re-Construction
• Damage RE wall ko ES t...
For latest crazy tech and trending news
thecrazeclub.com/how-to-root-...
Highway engineering ka aisa vidio banaye ki koi fresar candidate ko lage ki mere pass experience h. Sadak ke starting point se last tk. Thanks sir
Exactly bri
Yes you are right
This is amazing. Earlier this was done manually and used to take so many days. But now 500-600m happens in few hours
Nice video Sir ...plz upload more like Practical videos on Roads ,Rly & Bridges and Building with full Engg. facts
Apka samkhane ka tarika bahut shaandaar hai very nice
thank u sir...samjane ka tareqa accha ha
Very good explanation and detailed video 👍 Keep uploading new videos like this 😁
Very good description for beginners.
Best video about PQC on youtube...
Thanks
Very good information sir please make this type of video in weekly because I am civil engineer but I am not in practical field that's why I want that type of video thank you for making the type of amazing video
Wow awesome very good information sir keep it up you have been super liked by Civil Engg testing walk
Man power ka Liya call ki jiya 9735523229
Most important information thanks
Nice sir ji bahut acche se bataya hai
Very good video! do keep posting !! good explanation too!
Thank you dear
Good information about NH way
Thanks bhai
Very good information to
Nice info sir...
Very nice information sir
But some mistakes correction's is
Like, dowel bar dia- 32mm n length - 450mm n inserted to width distance is 300mm
In total 10width of road 34 rod's r inserted
In this video r not told about groove cutting length n widht
So, as per center line parallel cutting 3.5m left n right side
As per center line perpendicular cutting 4.5m total length of raod
N groove cutting depth is 100mm
N then immediately sealant r filling's in this cutting.
N only "3 TAI ROD" r inserted in total 10m width
GSB(Granular Sub- Base):- 200mm width
DLC(Dry Lean Concrete) :- 150mm
PQC(Pavement Quality Concrete) :- 300mm
Dear Omkar..as per design nos and all things may be change ...and sealant and filled immediately...please check once Thanks
@@DEofficial88 As Per IRC 015;2011 Table 12 Recommended Dimensions of Dowel Bars for Rigid
Pavements for an Axle Load of 10.2 T
Slab thickness,
Diameter, mm Length, mm Spacing, mm
200 25 450 300
250 32 450 300
300 38 500 300
350 38 500 300
Initial & final cutting in pqc kitna hota h ?
amazing video sir...
nice informative video
Tq for making this video
Good.. video..
Wah lajwab
Best video for freshers
very nice vedio
nice information sir...🙏❤
Very good information
And please do a videos on DLC and which type of density test will do on the PQC and total information of the PQC Thank you sir..
Nice video sar want more information
ACCHA VIDEO LOVE FROM KARNATAKA
Thanks
Beautiful
Nice
Osm videos
Very Good
Thanks brother
Thank s
NYC video good
Nice video
Nice video sbbir sir
Best video
Very nice vedio & explanation
Glad you liked it
Wow ❤
Thanks
Good
Sir aapne PQC KA VIDEO BADIYA BANAYA H
Pqc road me pqc ke thickness se 1/3 bhag cutting kiya jata h or celaynt filling hota hain
v good
Nice 👍 sir g 🙏🙏🙏🙏🙏🙏
Name of curing compound and it's composition used in PQC curing
Please make a video on How to establish a center line of highway ?
what is the difference between fixed form paver and slip form paver ?
Sir. Painnel concreting road ke baare me sikhna hai, please give video
Pl making RE blocks (small blocks)video with specifications
Aise hi video bnao bhaiya
Good video.But I want to seeing full PQC complete video
Bhai subgrade main rad soil hain ?
CBR Kitna aaya red soil ka ? As per IRC & MORTH ?
As Per IRC 015;2011 Table 12 Recommended Dimensions of Dowel Bars for Rigid
Pavements for an Axle Load of 10.2 T
Slab thickness,
Diameter, mm Length, mm Spacing, mm
200 25 450 300
250 32 450 300
300 38 500 300
350 38 500 300
Nice video sir
Thanks
Is it possible that direct final layer of concrete on subgrade
Ji Ha Bhai p. Q. C. Contraction line par cutting करता हूं कि pqc ग्रुप कटिंग
Nice Explain 👌
#AspirantCivilEngineers
What is difference between PQC CURING COMPOUNDS AND curing compound used in kerb making
Types of Concrete Curing Compounds Synthetic resin compound Acrylic compound Wax compound Chlorinated rubber compound Synthetic Resin Concrete Curing Compound
Why Slump was brought by Highwaya....it was supposed to be brought by concrete mixer from Batch mix plant
Sir 1 km RIGID PAVEMENT bnane k liye kitna cost lagta hai including all layer
Learn more from this video.
thanks for information I too have videoas
Sir par squire meter me quring compound kitna liter hona chahiye ? Eska bhi bataiyega
Sir pannels ki information as like LTD STD LTC ETC... KO KAISE PAHCHANE SBHI PANNELS KE LIYE EK VIDEO BANAO
expansion joint ke liye groove cut or filling nahi kiya kya ????
This construction is in Yadgir rayachur road i think.
Kiya PQC ke upar se second layear kr sakte hai
How to decide how many dowel bar and tie bar is required in PQC LAYING ?
Dowel bars are provided depending upon their spacing provision (eg. at 300mm c/c spacing)hence- (pavement width divided by spacing) plus 1= no. Of dowel bars
Sir pls explain.... how many different types of layer of which thickness provided in road construction...?
Only four layer's...
Subgrade :- as per design (filling or cutting)
GSB(Granular Sub- Base):- 200mm width
DLC(Dry Lean Concrete) :- 150mm
PQC(Pavement Quality Concrete) :- 300mm
@@omkarVedpathak. dlc- base layer
pqc- surface layer
where is binding layer?
Marvellous video sir
Sir ye kon si company ka work h or kahan kaam ho rha h
Plz tell me details of mdd means what is mdd of pqc
Sir could please tell me the name of the curing compound.pls mention the brand name.
9340203576
It's our rkjl project.katni section PQC paver
Company kaun Si hai
How camber and super-elevation is maintained while casting?
Sensor laga h na automatically Mantained
Is this delhi mumbai expressway?
Where is expansion joint
Good information sir but fresher ke liye koi job hi nhi dene ke liye taiyar h to students kya kre koi upay h
Sir pqc machine par kitne lavar lagti hai
Sir millinge machine ke bare me बताओ
Yeh kis jagah pay Road hai
very good explanation. but sir, where are the tie bars, how they are inserted by the machine. like dowel bars
Check in video....
Sir bituminous rod work can I see please
Pannel cutting kese kiya jata hai aur kitne step me kiya jata hai
I want to full dtails of how to construct of rod in pqc ,,,,,how to know about double bar and tie beam,,,, simple,,,
Its dowel bar not double bar
Hello sir kon shi company se ho
Or double waire to 30centi may 1 lagaya jata hai vi
Kon si company ka hi
For how many width of PQC 23 dowel bar used IN THIS VIDEO
300 mm centre to centre spacing
For 7m road 23 rod's r use as per 300mm spacing
कौन सा ग्रैड यूज़ कर रहे हैं
Make more videos dude
Sir slope cutting formula btaye
Ye kaun Si company hai Jo road ka kam kar Rahi hai
Taksering machine concrete laying kitna time k bat use karte he..
After 10 mint you can start
Ye to concrete ke set hone ke time pr depend hoto hai agr slamp Jada hoga to jada time rukana pdta hai
Job milegi sir civil engineer freshers ko
Kitna miter me kitna mal lagers kase nikale
Sir road machinry ke name batao one video me pls sir
Sir calculation batao maan liye lab mae hamara omc 12.40 hai or mdd 1.826 hai or hame site par 100 mtr. length hai or width 25 mtr. Hai tho hamara site par kitna water lage gaa OGL kae bed par.....plz...ogl ki bed ka jankari de ....
1.826 g/cc* 1000= 1826 kg/cm3
100*25*.15= 375 m3
1826*375= 684750 kg
684750*12.4%= 84909 kg
1 tanker = 12000 kg
5 % moisture generally borrow area Ki soil me Present rhta h than 12.4-5 = 7.4 % moisture
Ans is 4 tanker
Ye badal skta h depend krta h soil me phle se moisture Kitna present h
@@Afunfact thank u for reply mae
Es road kaha par
Pqc slump at site 25 to 45