    CHAPTERS:
    0:00 Introduction
    0:37 What is an FMEA?
    1:42 "Failure mode", "Cause" and "Effect"
    2:46 Types of FMEA
    3:44 Stages of FMEA documentation
    5:22 FMEA Document
    9:28 Ranking the severity of the failure
    10:34 Ranking the occurrence of the failure
    11:43 Ranking the detection ability of the failure
    12:39 FMEA Example
    #fmea #riskmanagement #qualitymanagement #quality #leansixsigma #projectmanagement
    #riskanalysis #failure #failuremode #effect #analysis
    FAILURE MODE AND EFFECT ANALYSIS (FMEA)
    Failure Mode and Effect Analysis (FMEA) is an analytical technique (a paper test) that combines the technology and experience of people in identifying foreseeable failure modes of a product or process and planning for its elimination. FMEA is a "before-the-event" action requiring a team effort to easily and inexpensively alleviate changes in design and production.
    FMEA is used for risk management under lean six sigma, project management, total quality management, production planning and control, service quality, and financial planning in the automobile industry, aviation industry, banking, hotel, and many more areas where the risk is very high.
    OBJECTIVES OF FMEA
    • Recognize and evaluate the potential failure of a product or process and its effects.
    • Identify actions that could eliminate or reduce the chance of potential failures.
    • Document the process.
    TYPES OF FMEA
    There are several types of FMEA: design FMEA, process FMEA, equipment FMEA, maintenance FMEA, concept FMEA, service FMEA, system FMEA, environmental FMEA, and others.
    However, for all intents and purposes, all can be broadly categorized under either design FMEA or process FMEA. For instance, equipment, service, and environmental FMEA are just slightly modified versions of the process FMEA, and system FMEA is a combination of design and process FMEA.
    DESIGN FMEA
    Design FMEA aids in the design process by identifying known and foreseeable failure modes and then ranking failures according to their relative impact on the product.
    PROCESS FMEA
    Process FMEA is used to identify potential process failure modes by ranking failures and helping to establish priorities according to the relative impact on the internal or external customer.
    STAGES OF FMEA
    There are four stages of FMEA
    1) Specifying Possibilities
    a. Functions
    b. Possible Failure Modes
    c. Root Causes
    d. Effects
    e. Detection/Prevention
    2) Quantifying Risk
    a. Probability of Cause
    b. Severity of Effect
    c. Effectiveness of Control to Prevent Cause
    d. Risk Priority Number
    3) Correcting High-Risk Causes
    a. Prioritizing Work
    b. Detailing Action
    c. Assigning Action Responsibility
    d. Check Points on Completion
    4) Re-evaluation of Risk
    a. Recalculation of Risk Priority Number
    Related Videos and Playlists:-
    • FMEA in Hindi • Failure Mode and Effec...
    • Lean vs Six Sigma • Lean and Six Sigma Dif...
    • 8 Deadly Wastes TIMWOODS • 8 Wastes of Lean Manuf...
    • Why-Why Analysis in Hindi • WHY WHY Analysis in Hi...
    • What is Benchmarking? • Benchmarking Defined |...
    • Corrective Actions and Preventive Actions (CAPA) • Corrective Action and ...
    • Quality Function Deployment • Quality Function Deplo...
    • 8D Problem Solving • 8D Problem-Solving in ...
    • Total Productive Maintenance • Total Productive Maint...
    • 7 QC Tools English Tutorials: • PROCESS FLOW CHART | 7...
    • New 7 QC Tools English Lectures: • Affinity Diagram | New...
    Subscribe for the latest videos @ShakehandwithLife
    Website shakehandwithlife.in
    PDF Notes and eBooks shakehandwithlife.myinstamojo...

Комментарии • 92

  • @satyanarayana8676
    @satyanarayana8676 5 лет назад +2

    Good information abt fmea, useful video thanks.

  • @amittivari1062
    @amittivari1062 6 лет назад +3

    Nice video & your technic for teaching is great sir. Thank you so much

  • @SarathKumar-mo8kg
    @SarathKumar-mo8kg 4 года назад

    super sir, very informative with examples

  • @ajaybabufarm7892
    @ajaybabufarm7892 5 лет назад +1

    Very nice information brother
    Thanks a lot for such information

  • @rajeshsalunkevlogs5007
    @rajeshsalunkevlogs5007 3 года назад

    Simple nice explained

  • @sreepranavam
    @sreepranavam 4 года назад +1

    thank you for the video.. sir, u explained very well

  • @user-pg7tw8sj8c
    @user-pg7tw8sj8c Год назад

    nice explanations

  • @sunillalwani9646
    @sunillalwani9646 2 года назад

    Very nice.. FMEA was not clear for me but you have explained very nicely .. thanks a lot.

  • @nagendrarajput8236
    @nagendrarajput8236 5 лет назад +2

    I enjoyed a lot ur video.its very helpfull........thanks......

  • @benoevabeta8878
    @benoevabeta8878 3 года назад +1

    Good video, was easy to understand, even though I am new to PM. Thanks for sharing this.

  • @sabaripandian116
    @sabaripandian116 3 года назад

    Very good techniques

  • @yamahashimi1864
    @yamahashimi1864 4 года назад

    Thank you very much (From Afghanistan)

  • @yuvaraj1824
    @yuvaraj1824 3 года назад

    Nice sir

  • @vijayvaghasiya
    @vijayvaghasiya 4 года назад +1

    I am from automotive industry, however I was still able to easily connect with the example you chose.
    Loved the way contents were organised and delivery of the same.
    Please keep posting such generic videos.
    Question : Do you have any videos on FTA (Fault Tree Analysis) ?

  • @ezhilarasansathiyamoorthi4731
    @ezhilarasansathiyamoorthi4731 6 лет назад

    Thanks bro

  • @drbalarajujakkula2360
    @drbalarajujakkula2360 5 лет назад +3

    Thank you sir for uploading the video. In the video at last RPN value was reduced value, in that how can we select manually S O D factors? Just prior to selection of S O D factors in second time you have mentioned the remedial action to improve. Action not at implemented, if suppose implemented again we need to conduct the re-examination. I didn't get clarity.

    • @ShakehandwithLife
      @ShakehandwithLife  5 лет назад

      Once you have calculated the RPN value, you need to prepare a corrective or preventive action plan, after implementation of the corrective and preventive action you need to again check whether the RPN is reduced or not. What remains for the clarification?

  • @ngocdhbk123
    @ngocdhbk123 3 года назад

    It is very easy to understand when compare with reading docs. Thanks you so much. Could you please make video to present about FMEDA for VLSI ?

  • @H2O1167
    @H2O1167 3 года назад

    Thank you for this video. Do you have any presentation for Asset Risk Ranking?

  • @sivakumar-ul9kb
    @sivakumar-ul9kb 4 года назад +2

    Really good. 4th edition when u make a vedio sir?

  • @MI-gr6lg
    @MI-gr6lg 2 года назад

    Very nice explanation. But if you could zoom into sections you are referring to at different times, it would help.

  • @sanjeevkumarbathe
    @sanjeevkumarbathe 6 лет назад +2

    can AIAG sev,occ,det rating guidlines can be used for HR,PURCHASE AND STORE IF not then what to do

    • @ShakehandwithLife
      @ShakehandwithLife  6 лет назад

      Take the example of Absenteeism in HR function, prepare the severity, occurrence, and detection table for the HR functions related to the absenteeism, find the severity of absence of the person, occurrence ( how often it is happening or what is the cause of absenteeism) and detection ( what are the current control for the absenteeism). Calculate the RPN value for absenteeism, take necessary corrective action and find the new value of RPN. Check whether it reduced substantially? Severity may vary according to the department.

    • @sanjeevkumarbathe
      @sanjeevkumarbathe 6 лет назад +1

      DOES WE HAVE TO MAKE SEPARATE TABLE FOR EACH FUNCTION , IS THERE ANY TABLE WHICH CAN BE USED FOR ALL FUNCTION

    • @ShakehandwithLife
      @ShakehandwithLife  6 лет назад

      For severity, occurrence, and detection, there is the requirement of a separate table for each, but according to function it depends upon the severity of the functional loss in the process due to any kind of failure

  • @ashishkumbhar6667
    @ashishkumbhar6667 6 лет назад +2

    Please make a video on control plan

  • @hemantpatil5337
    @hemantpatil5337 4 года назад +1

    Sir, What is the acceptance value ( In-between failure mode and Action taken ) of RPN OR Through hold RPM -? Can you pls confirm.

    • @ShakehandwithLife
      @ShakehandwithLife  4 года назад +1

      Watch this video on fmea in hindi ruclips.net/video/OUKIZng1U2g/видео.html

  • @uub249
    @uub249 4 года назад +1

    what are mandatory input documents for process FMEA??

    • @ShakehandwithLife
      @ShakehandwithLife  4 года назад

      Design or process diagram, severity ranking table, occurrence ranking table, detection ranking table, cause and effect diagram, test methods, CAPA

  • @AhmedKhan-jf4wg
    @AhmedKhan-jf4wg 6 лет назад +2

    Is there any method to identify failure except fmea???

    • @ShakehandwithLife
      @ShakehandwithLife  5 лет назад

      You may use corrective action, fault tree analysis, but fmra is good one.

  • @chetanpatil5875
    @chetanpatil5875 3 года назад

    Where is the example of equipment FMEA?

  • @akashrai1156
    @akashrai1156 4 года назад +1

    Sir please provide full lecture of FMEA and ppap

  • @vishwasjadhav5134
    @vishwasjadhav5134 5 лет назад +3

    As per standard RPN values in between or acceptance value of RPN

  • @tanuingle6857
    @tanuingle6857 3 года назад

    Sir can u pls explain the potential failure for lathe machine? CNC and drilling machine

  • @yogeshsapkale3594
    @yogeshsapkale3594 3 года назад +1

    Sir can u share a ppt

  • @rajpandey1008
    @rajpandey1008 4 года назад +5

    Am I not wrong 3 types of FMEA
    01) system FMEA
    02) Design FMEA
    03) Process FMEA

    • @ShakehandwithLife
      @ShakehandwithLife  4 года назад +2

      Of course u r right, system FMEA study the failure of a process under the multiple process in a system

  • @krishnasiddhartha9474
    @krishnasiddhartha9474 6 лет назад +4

    how to decide S,O,D values after recommending actions

    • @ShakehandwithLife
      @ShakehandwithLife  6 лет назад +1

      Same way you can calculate the S, O, D values based on the table you prepared for the severity, occurrence, and detection of a failure,

    • @singlewindow7515
      @singlewindow7515 4 года назад

      See my videos u will get correct answer

  • @ishantguleria870
    @ishantguleria870 4 года назад

    do u have any institute where u teach quality documentation ???

    • @ShakehandwithLife
      @ShakehandwithLife  4 года назад

      Providing in-house at company sites and open house training when scheduled u may check www.shakehandwithlife.in

  • @manideepkulukuri2496
    @manideepkulukuri2496 3 года назад +1

    sir everything is good but why didn't your fill class column

  • @prabhatthakur7513
    @prabhatthakur7513 4 года назад +1

    sir is it necessary that recalculation of RPN should be under 100?

  • @ezhilarasansathiyamoorthi4731
    @ezhilarasansathiyamoorthi4731 6 лет назад +1

    Update six sigma green, block,yellow,blue belt video

  • @RaviKumar-rt5qr
    @RaviKumar-rt5qr 3 года назад

    Vell explained

  • @haripradeepr429
    @haripradeepr429 4 года назад

    more than add ..... more than 10 add *****of

  • @waysthe9661
    @waysthe9661 4 года назад

    Hết hồn với bọn Ấn độ nói tiếng anh

  • @sajeevmangat
    @sajeevmangat 5 лет назад +1

    bad pronouncing