How to Trace Logic Through Activity Network PERT | Primavera P6 | 19.12 | Beginners Tutorial

Поделиться
HTML-код
  • Опубликовано: 5 окт 2024
  • SoftEdemy is latest academy for learning all software’s up to professional level
    #PrimaveraP6, #TraceLogic, #ActivityNetwork
    In this video we have discussed about
    activity network (activity graph) A graphical method for showing dependencies between tasks (activities) in a project. The network consists of nodes connected by arcs. Nodes denote events and represent the culmination of one or more activities. Arcs represent activities and are labeled with the name of the activity and have an estimated time to complete the activity. Dummy unlabeled arcs with zero completion time are used to fan out from one event to other dependent events. Before progress can be made from one event to another, all activities leading to that event must have been completed. The longest path through the activity network gives the completion time for the project represented by the network. See also critical path method, PERT chart.
    Previous Videos
    How to Download and Install Primavera P6 |19.12 | 18.8 | Latest Version| Oracle | Free Download
    • Video
    Introduction of Interface | Primavera P6 | 19.12 | 18.8 | Latest 2020
    • Introduction of Interf...
    How to Create Organizational Breakdown Structure | Primavera P6 |19.12 | 18.8 | Latest Version 2020
    • How to Create Organiza...
    How to Create Enterprise Project Structure | Primavera P6 |19.12 | 18.8 | Latest Version 2020
    • How to Create Enterpri...
    Create a Project | Primavera P6 |19.12 | 18.8 | Latest Version 2020
    • How to Create a Projec...
    How to Create and Assign Project Codes| Primavera P6 |19.12 | 18.8 | Latest Version 2020
    • How to Create and Assi...
    How to Create Work Breakdown Structure | Primavera P6 | 19.12 | 18.8 | Latest 2020
    • How to Create Work Bre...
    How to Create Calendar | Primavera P6 | 19.12 | 18.8 | Latest 2020
    • How to Create Calendar...
    How to Create Activity | Primavera P6 | 19.12 | 18.8 | Latest 2020
    • How to Create Activity...
    How to Create and Assign Activity Codes to Activities | Primavera P6 | 19.12 | 18.8 | Latest 2020
    • How to Create and Assi...
    How to Assign Relationships to Activities | Primavera P6 | 19.12 | 18.8 | Latest 2020
    • How to Assign Relation...

Комментарии • 8

  • @ManekiKidsFamily
    @ManekiKidsFamily 4 года назад

    Very Great effort Thank u sir

  • @canbolkan
    @canbolkan 9 месяцев назад

    thank you

  • @asifali-hg3lk
    @asifali-hg3lk 6 месяцев назад

    Can we assign two different colours of boxes in the chart?

  • @SoftEdemy
    @SoftEdemy  3 года назад

    For any query contact us on our email : info@softedemy.com