Leadgate (Bradley) opencast. Update April 2021

Поделиться
HTML-код
  • Опубликовано: 4 окт 2024
  • Leadgate (Bradley) opencast coming to a close fairly soon.
    Quite a controversial site since it began
    It's been fascinating to follow how they took the coal from the ground, exposing old underground workings here and there.
    Hard to see how they made a profit with all those huge machine to run and the enormous volume soil/clay/shale/rock that had to be moved.
    Music:
    Checkmate by Nathan Moore.

Комментарии • 4

  • @RODPIKERDRONESUK
    @RODPIKERDRONESUK 3 года назад +1

    Thanks for sharing cheers

  • @junedavison9133
    @junedavison9133 3 года назад +1

    The ratio is 17:1. So 8.5 million tonnes of top soil, sub soil and rock were removed. Banks didn't get the anticipated 5000,000 tonnes of coal Around 400,000 tonnes was excavated. Imagine all that CO2 in the atmosphere when it's burnt.

    • @assessorjohn
      @assessorjohn  3 года назад

      Wow, that's a lot of material. Thanks.