Layout testing again, renewed one of the bridges

Поделиться
HTML-код
  • Опубликовано: 8 сен 2024
  • testing the track work with my 805 and GBRf 66 on a rake of China clay wagons, I’ve strengthened the sagging bridge at the back of the layout with a baton underneath and packed the track with foam board and now trains can run safely over it again

Комментарии •