Layout testing again, renewed one of the bridges
HTML-код
- Опубликовано: 8 сен 2024
- testing the track work with my 805 and GBRf 66 on a rake of China clay wagons, I’ve strengthened the sagging bridge at the back of the layout with a baton underneath and packed the track with foam board and now trains can run safely over it again