Tilt-Up Construction: Lifting Concrete Panels @ Flemington Junction

Поделиться
HTML-код
  • Опубликовано: 22 авг 2024
  • The Bedrock guys lift the concrete panels of Building D at Flemington Junction in just a few short days out in Flemington, NJ. See how they get it done with this process video!
    Lifting took place 1/3/23 - 1/9/23

Комментарии • 2

  • @frankortolano5886
    @frankortolano5886 Год назад

    Looks kinda flimsy

    • @BedrockConcreteCorp
      @BedrockConcreteCorp  Год назад

      Hi Frank! After the concrete panels are lifted and braced down, but before the structural steel is installed, it might look a little flimsy from a distance. Rest assured, the braces holding the panels in place are more than strong enough to keep them upright until the structural steel is installed. They can withstand heavy winds in this state, not to mention, the panels themselves are reinforced with rebar too! If you want to see what the next step looks like, watch this video from our channel: ruclips.net/video/UCKduxewP6Q/видео.html