Jack Up Drilling Rig - Jacking System & RPD

Поделиться
HTML-код
  • Опубликовано: 28 дек 2024

Комментарии • 13

  • @hendranizam
    @hendranizam 7 месяцев назад +1

    Macam kenal lah👍👍👍

  • @rulyandreas1360
    @rulyandreas1360 Год назад +1

    Good Performance

  • @freddyliachannel8181
    @freddyliachannel8181 Год назад +1

    steady kih Captain Ryan Cheah.

  • @kesavanthirumani5047
    @kesavanthirumani5047 Год назад +2

    Sir what is the minimum and maximum rpd acceptable

    • @AceRigMove
      @AceRigMove  Год назад +1

      RPD minimum and maximum is depending on the rig design. Some rig minimum RPD is 3.5" and Maximum is 5.0", some measure in metrics, minimum 60mm and maximum 70mm. So it is all depend on what type of rig you are working on. As a rig mover, we will ensure the RPD as minimum as possible prior to commence preloading.

  • @nuub6197
    @nuub6197 Год назад +1

    Can i get this job at lowest position

  • @abhaykrishna4486
    @abhaykrishna4486 Год назад +1

    Which position in the rig that suits for Btech/BE mechanical engineering fresher (recent graduate)?

    • @AceRigMove
      @AceRigMove  Год назад

      Roustabout

    • @abhaykrishna4486
      @abhaykrishna4486 Год назад +1

      ​@@AceRigMoveIs there any course needed to join as a roustabout for Btech graduates?

    • @AceRigMove
      @AceRigMove  Год назад +1

      @@abhaykrishna4486 your qualification is sufficient.

    • @abhaykrishna4486
      @abhaykrishna4486 Год назад

      ​@@AceRigMoveis there any vacancy in your company, or do you know any vacancy for freshers.I will share my cv if you provide your mail id.
      Thankyou sir

    • @kashiftechzonebihar
      @kashiftechzonebihar Год назад

      Have anye requirements abut Roustabout job in your company please help me