Just want to thank you for your amazing tutorials. They’re short and on point. Thanks also for putting a smile on my face with your funny way to teach! I wish I could get a compilation of your Revit tips. I’ll buy it!
At 16.05 floor plan show the new wall.,new window and existing plan which phase filter u apply here.. Previous + new or previous +demo I think previous + new...if previous + new u apply then why it did not show me the existing wall that u demolish ...i know that the demolish wall.will shownin demo plan ..but actually it's existing.....i think u got it what i want to say...thanku sir
The problem I run into today is linked existing model in the new construction model does not want to show demo dash line work that I spend hours on in the existing model. I have already checked the phase filter + phase in the new construction model a hundred times. Phase Filter = Previous + Demo Phase = New Construction What am I missing here? One suggestion: I usually link Existing to New Construction + New Construction to Existing on 2 open Revit at the same time, on 2 screens, So I can jump back and forth, instead of using the measureing method, which is too tedious for the complicated model.
Just want to thank you for your amazing tutorials. They’re short and on point. Thanks also for putting a smile on my face with your funny way to teach! I wish I could get a compilation of your Revit tips. I’ll buy it!
Thank you Mike for your very interesting revit topic and a very funny way of singing too.
These vids always help. Thanks!
Hey thanks for this great video, you are awsome man!
Thank you and keep it up
Plz continue update on phasing.. thanku sir
At 16.05 floor plan show the new wall.,new window and existing plan which phase filter u apply here..
Previous + new or previous +demo
I think previous + new...if previous + new u apply then why it did not show me the existing wall that u demolish ...i know that the demolish wall.will shownin demo plan ..but actually it's existing.....i think u got it what i want to say...thanku sir
Brilliant
The man!
The problem I run into today is linked existing model in the new construction model does not want to show demo dash line work that I spend hours on in the existing model.
I have already checked the phase filter + phase in the new construction model a hundred times.
Phase Filter = Previous + Demo
Phase = New Construction
What am I missing here?
One suggestion: I usually link Existing to New Construction + New Construction to Existing on 2 open Revit at the same time, on 2 screens, So I can jump back and forth, instead of using the measureing method, which is too tedious for the complicated model.
I took a look into this issue.. and decided to make a new Revit Tip video... kinda like 'DEMO ITEMS IN A LINKED FILE - PART 2'
Can we get something on facia+material? And perhaps some structural wood framing stuff Please 😃 you are again.... the best revit man on the internet!!
Hi sir how r u ...plz continue video on phasing it's my request sir...thanku God bless