Hauling Track Ballast

Поделиться
HTML-код
  • Опубликовано: 22 авг 2024
  • A short video shot while loading and moving ballast at Mini Acres Railroad. Today we used the Galloping Goose to move gravel over the bridge to the car shed for some new switch tracks that were recently installed. A few rain showers had us retreating to the car shed for temporary shelter throughout the day.

Комментарии • 1