Sorry to be so offtopic but does anyone know a method to get back into an Instagram account..? I was dumb lost the password. I love any tricks you can give me!
A. M. A. Z. I. N. G ORANG RAMBUT PIRANG ORANG MATA BIRU MEREKA SANGAT JENIUS DAN PANDAI .. MEREKA ADALAH PENEMU DAN PENCIPTA TERIMA-KASIH INOVASI TERIMA-KASIH TEKNOLOGI THE BEST
Sir, Good day, I would like to ask for your help regarding of how can i design bundle pipe pulling of 3x225mm, 2x125mm and 1x32mm total of 6 pipes with a length of 200m in a depth of 20 meters. I am new in this industry and as I study the design in a book of McGraw-Hill it is only single pipe. Sir, what consideration I will do first in order to design 6 pipes in a bundle so that the design is correct and safe. Thank you so much, your help and response is most appreciated. Regards, Rey Bornales
Thanks Rey for your enquiry regarding bundle conduit installation via HDD. This type and size is common place conduit bundle for HV cabling. Considerations as follows. 1. Ground conditions:- A full Geo-Tech investigation of the site will be required. If you’re looking at a maximum depth of 20m, geo-tech bore holes should be undertaken to a depth of at least 10m below bore profile, at multiple points along the alignment, 4-5 boreholes with full report including rock cores for inspection if encountered. 2. Bore Profile:- this will be dependent on a range of factors including; what is the reason for the crossing; Road/Creek, River, services? Also the achievable bend radius in the known ground conditions (Geo-Tech) is a major factor. If hard rock is to be encountered a 200m crossing with a maxim depth of 20m will not be achievable. You will exceed a safe working radius of the drill tooling to be applied in rock ground conditions. The depth and length might need to be considered. 3. Conduit HDPE:- there is no problem installing bundle conduit configuration via a HDD method, however your client might have specific requirements for their cabling. I.e. (1. Bend Radius) (2. total haul ability, of cable into Bored crossing) (3. thermal resistivity) the HDPE conduit will need to be PN16 at minimum, also the 32mm should be upgraded to 90mm at minimum to ensure it can handle the install load.
Watching these machines in action is awesome.
Sorry to be so offtopic but does anyone know a method to get back into an Instagram account..?
I was dumb lost the password. I love any tricks you can give me!
@Conrad Johnathan Instablaster ;)
I really like the work that uses theology.
I will foloow this work about 1 year..so amazing
So nicely made this
A. M. A. Z. I. N. G
ORANG RAMBUT PIRANG
ORANG MATA BIRU
MEREKA SANGAT JENIUS DAN PANDAI .. MEREKA ADALAH PENEMU DAN PENCIPTA
TERIMA-KASIH INOVASI
TERIMA-KASIH TEKNOLOGI
THE BEST
Good the drilling rig. What formation there and did it use the HDD mud motor?
Dear Pipe line Drillers, Is possible the HDD method in gravity line. example 250 m length, 1000mm dia HDPE pipe.
Where do I go to learn how to operate these things
How to copy data from 24*40 Vermeer in USB ? Just like torque , mud pressure, angle etc ?
What's is checklist of drilling ?
Does anybody know the typical drill mud wastage rate? How much bentonite/mud I should need per LF of drilling? or day of operation?
dry mix is ass if im honest man. go with a chemical mix they bond so much better
Sir,
Good day, I would like to ask for your help regarding of how can i design bundle pipe pulling of 3x225mm, 2x125mm and 1x32mm total of 6 pipes with a length of 200m in a depth of 20 meters. I am new in this industry and as I study the design in a book of McGraw-Hill it is only single pipe. Sir, what consideration I will do first in order to design 6 pipes in a bundle so that the design is correct and safe. Thank you so much, your help and response is most appreciated.
Regards,
Rey Bornales
Thanks Rey for your enquiry regarding bundle conduit installation via HDD. This type and size is common place conduit bundle for HV cabling.
Considerations as follows.
1. Ground conditions:- A full Geo-Tech investigation of the site will be required. If you’re looking at a maximum depth of 20m, geo-tech bore holes should be undertaken to a depth of at least 10m below bore profile, at multiple points along the alignment, 4-5 boreholes with full report including rock cores for inspection if encountered.
2. Bore Profile:- this will be dependent on a range of factors including; what is the reason for the crossing; Road/Creek, River, services? Also the achievable bend radius in the known ground conditions (Geo-Tech) is a major factor. If hard rock is to be encountered a 200m crossing with a maxim depth of 20m will not be achievable. You will exceed a safe working radius of the drill tooling to be applied in rock ground conditions. The depth and length might need to be considered.
3. Conduit HDPE:- there is no problem installing bundle conduit configuration via a HDD method, however your client might have specific requirements for their cabling. I.e. (1. Bend Radius) (2. total haul ability, of cable into Bored crossing) (3. thermal resistivity) the HDPE conduit will need to be PN16 at minimum, also the 32mm should be upgraded to 90mm at minimum to ensure it can handle the install load.
Is there a hiring for driller/operator for HDD,i have a experience in drilling exploration,,soil penetration test,,water well.
we are selling HHD 150 mm for fiber optic cable and have interest in above machine for future prospect...with diameter of .500 mm for utility
Contact Gmail id
Super...
Beuteful
Como me gustaría trabajar con estas máquinas grandes yo trabajo pero con drilles pequeños
¿Vives en México?
100PercentOS2 vivo en Virginia Beach, Virginia y trabajamos con dril pequeño una 20 20 de ditch witch
Donde trabajas usted? Jo trabajo com uma jt25
Sir mashin chahiy please no
our content is the same
Hii sir