El Diablo (Looping Dragon)

Поделиться
HTML-код
  • Опубликовано: 14 янв 2025

Комментарии • 2

  • @zeppone4045
    @zeppone4045  9 лет назад

    They couldn't start building this during the winter because of the freezing temps. Can't pour concrete during freezing temps, so they had to wait till weather warmed up.

  • @dizzybone2000
    @dizzybone2000 9 лет назад

    lol were they sleeping the whole winter? I feel like this could be built in less than 2 weeks honestly.