SAWING LINE with scanning, MEBOR, HIGH production, VTZ OF, START-UP

Поделиться
HTML-код
  • Опубликовано: 19 сен 2024
  • This sawmill line includes double chipper canters, quad & double vertical band saws. Production capacities are up
    to 300-500 m3 of logs/8 h shift. Positioning of blades is carried out through scanning of logs and automatic optimization for
    best recovery. Edging is done with the VRA 40 OF optimised edger for edging of up to 40 boards/min. Cants are
    further re-sawn with a double head RS 1300 resawing line, with a full run around system.

Комментарии • 55

  • @СергейСнегов-у2к
    @СергейСнегов-у2к 5 лет назад +5

    Линия, конечно, фантастическая))) Но и такой же переизбыток, как не крути много холостого. А если случится 2 дня простоя или неделька.... Но, в целом, это высочайший уровень.

    • @VaderMi
      @VaderMi 4 года назад +2

      работал на таком, на х.х.затраты конечно есть, но они перекрываются обьёмами распиленной продукции. А про простои , это правильно заметили, стоит сломаться одному вспомогательному конвееру, и останавливается весь завод. А если пилит без остановок, то склад с кругляком не успевает разгружать лес, либо не успевают перерабатывать отходы: опилку-обзол, и опять остановка всего завода. Да и с малыми обьёмами кругляка на нём не выгодно пилить, и людей отправляют нахер.

    • @krewleonardo7116
      @krewleonardo7116 3 года назад

      Instablaster.

  • @asdfg123229
    @asdfg123229 4 года назад +1

    Прокладки вручную укладывают в прокладораздатчик, обалдеть сколько ручного труда.

  • @Altis_play
    @Altis_play 2 года назад +1

    the summary of the video is at 7:10

  • @wandisukpasi9744
    @wandisukpasi9744 6 лет назад +1

    Best sawmill machine i ever seen

    • @joelsanchezfl2012
      @joelsanchezfl2012 6 лет назад

      Yes right on.
      I worked in an big company in Rockledge FL
      Now I'm here in my beautiful country

    • @fortuneshongwe1454
      @fortuneshongwe1454 2 года назад

      @@joelsanchezfl2012 where is your country Sir??

    • @joelsanchezfl2012
      @joelsanchezfl2012 2 года назад +1

      @@fortuneshongwe1454 i I'm from Veracruz Mexico sir...now I came back to usa... greetings sir.

    • @fortuneshongwe1454
      @fortuneshongwe1454 2 года назад

      Am from South Africa 🇿🇦 I want job there, do you have the email

  • @waynedavenport3919
    @waynedavenport3919 3 года назад +1

    Nice setup

  • @BillyReed68
    @BillyReed68 7 месяцев назад

    One thing breaks and the entire process breaks down. I bet they built it like a Swiss watch. 150k bd ft in an 8 hour shift? # 20 double bunk trailers per day? Where do they put the mountain of saw dust and chipping?

  • @MultiBruho
    @MultiBruho 6 лет назад +4

    Хороший заводик, но с такими заводиками ни какого леса не хватит.

    • @enovitskiy
      @enovitskiy 5 лет назад +1

      без этого заводика ты бы сидел жопой на полу

  • @fortuneshongwe1454
    @fortuneshongwe1454 2 года назад

    It's good sawmill machines, location please, in which country??

    • @motherisape
      @motherisape 2 года назад

      Good comment . In which country?

  • @istina1003
    @istina1003 6 лет назад +3

    Where is this company? Which country?

    • @malganis99
      @malganis99 5 лет назад +1

      Železniki, Slovenia

  • @kelz3486
    @kelz3486 3 года назад

    Why does it run so slow?? I worked in a sawmill which did a log every 10sec

    • @coiwe
      @coiwe Год назад

      A sawmill is always dedsigned according to the logs availability. Surely it respond to the log supply they have

  • @fencer39
    @fencer39 3 года назад +1

    400+ dislikes.....obviously they bought a woodmizer !

  • @tango5341
    @tango5341 4 года назад

    how much completed sawing line with scanning ?

  • @trader2473
    @trader2473 2 года назад

    How much cost this complete line?
    And can you make completly automated line for about 50m3/8h?
    Regards from Montenegro!

    • @BillyReed68
      @BillyReed68 7 месяцев назад

      Hmmm, each one of those saw heads is at least $250k. There were 3 gangs of four? Plus the edgers? The building is probably cool million with the pad that is required. I bet you could set that entire operation up for under $10 million, US. And that includes the heavy haulers to feed it.

  • @kasob100
    @kasob100 4 года назад +1

    Impressive

  • @RockAristote
    @RockAristote 3 года назад

    How much PMP by hour?

  • @emmanuelcunha6188
    @emmanuelcunha6188 2 года назад

    Quantos metros cubicos essa serraria produz por hora ?

    • @coiwe
      @coiwe Год назад

      o 300-500 m3 of logs/8 h shift

  • @tune7333
    @tune7333 5 лет назад +1

    can the forests keep up?...wow

    • @conexn
      @conexn 5 лет назад

      For every tree they cut down, they have to plant 5 more. Some of the material/tree's they get are also cut down from fire breaks in forest, that way if there is a fire, it can only burn so much and not an entire forest.
      The days of coming in a cutting down an entire forest like they did back in the 1800 and 1900's is over.

    • @oloansitanggang410
      @oloansitanggang410 4 года назад

      Developing countries forest were.cleaned toward.deserts...n yet they all do not realised

  • @richardmanning8912
    @richardmanning8912 4 месяца назад

    No debarker

  • @DINESHKUMAR-cq6bs
    @DINESHKUMAR-cq6bs 6 лет назад +2

    kahai PR ye company

  • @SuneelKumar-fv5tk
    @SuneelKumar-fv5tk Год назад

    I want cost

  • @chetanJadhav-rl8ss
    @chetanJadhav-rl8ss 5 лет назад +1

    Nice

  • @derekbueckert7428
    @derekbueckert7428 2 года назад

    looks very nice but I can do math and what I see is a operation that requires to much man power and a lot of capital to set up. this set up would have to run smoothly for a really long time before its put the original investment back into your pocket

  • @clementeespinoza4236
    @clementeespinoza4236 6 лет назад +1

    donde lo encuentro

  • @충주공유제재소
    @충주공유제재소 Год назад

    라인 얼마인가요

  • @uabukmega680
    @uabukmega680 3 года назад

    👍

  • @OSCAR201246
    @OSCAR201246 6 лет назад +5

    ESTE ASERRADERO LO DEBE HABER IDEADO EL DUEÑO DEL MISMO PODRIDO DE LOS PAROS...!!!

  • @JemiReinkarnasi
    @JemiReinkarnasi 6 лет назад +1

    Wow

  • @luluhka8
    @luluhka8 5 лет назад +4

    небось сами китайцы лес выращивают у себя)))

  • @michaelwillcutt2619
    @michaelwillcutt2619 2 года назад

    Trees that size is a waste of time cut bigger allowing smaller trees to have a heart of grain .

  • @adrianoaparecido6702
    @adrianoaparecido6702 5 лет назад +1

    Dp

  • @ОмарГусайниев
    @ОмарГусайниев 5 лет назад +1

    Хватит Россию грабить.

  • @matzbjureen5149
    @matzbjureen5149 5 лет назад

    N

  • @ЕвгенийНикишов-ч2и
    @ЕвгенийНикишов-ч2и 5 лет назад +3

    Херня какая-то ... Доски пол часа по цеху катаются и все...

  • @CC-jj7ne
    @CC-jj7ne 9 месяцев назад

    High speed is greater than 60,000 board feet an hour. And that was over 20 years ago. Looks like you doing about 15. Sorry to say it but you ain’t even slow.