The installation of PVC marble sheet

Поделиться
HTML-код
  • Опубликовано: 9 сен 2024
  • One. Aluminum alloy fixed In this case,
    1, first on the side of the wall covered with grass, commonly used is the 3MM of the plywood, wood, a good point is the fire glass magnesium board, nail them nail on the wall.
    In this case,
    2, and then in the wall nail foot line. With aluminum alloy angle fixed corner, and then fixed aluminum corner of the corner. That is, respectively, the aluminum alloy corners and aluminum alloy tool nails were nailed to the corresponding location on the wall.
    In this case,
    3, and then saw the UV board. The UV board according to the actual requirements of the size of a piece of sawing, and then with a sandpaper edge trim and smooth.
    In this case,
    4, and then embedded in the UV board and the aluminum alloy angle between the toolbar on the line.
    In this case,
    Second, the use of plastic wall to install
    In this case,
    1, first in the wall covered with grass-roots side, commonly used is the 3MM plywood, wood, a good point is the fire glass magnesium board. With nails to nail them on the wall, and sandpaper to clean the board surface.
    In this case,
    2, sawing, the actual requirements of the UV board security saw a piece of.
    In this case,
    3, downside, the UV board will be installed on all sides with inverted side down 45 degrees. According to the actual installation requirements, and some just down the upper and lower sides or three edges.
    In this case,
    4, clean the back of the UV board, with sandpaper and cloth to the back of the UV board clean.
    In this case,
    5, the universal glue or wood glue evenly coated on the back of the UV board, and then flat on the UV board attached to the wall, and then gently beat the UV board, so that the UV board firmly firmly on the wall.
    In this case,
    6, water-based jointing material, and then fill in the gap between the two UV plates 45 degrees at the intersection, the first to fill, and then the vertical angle of wood from the intersection of 45 degrees gently across, so 45 degrees intersect Department looked like.
    In this case,
    7, clean the UV board surface, the extra sealing material clean.
    contact person:
    ●Mr.Ma
    Tel:+86-512-58900469
    Phone:+86-13205130817(what's app)
    Email:sales@anda-china.com
    Skype: hahawker
    QQ:275167584

Комментарии • 20