😍 Opened ! Mumbai Metro 3: First Day Ride BKC To Aarey JVLR | Full Journey Details
HTML-код
- Опубликовано: 10 окт 2024
- Opened ! Mumbai Metro 3: First Day Ride BKC To Aarey JVLR | Full Journey Details #metro3 #aqualine
The Mumbai Metro-3, also known as the Aqua Line which is the city's first underground Metro service, opened to public on Monday, a day after Prime Minister Narendra Modi flagged off the service between Bandra-Kurla Complex (BKC) and Aarey Colony JVLR.
Mumbai Metro Line 3 spans 33.5 kilometers with only a 12.44-km stretch of it opened for the public so far, came up at a cost exceeding Rs 32,000 crore. There are 10 stations along the route: Aarey, Marol Naka, CSMIA T1 (Terminal 1), MIDC, SEEPZ, Sahar Road, CSMIA T2 (Terminal 2), Vidyanagari, Dharavi, and BKC. Nine stations are underground, while Aarey is the only ground-level station in this stretch
The Mumbai Metro Line 3 will run from 6:30am to 10:30pm on weekdays and from 8:30am to 10:30pm on weekends, with fares ranging from Rs 10 to Rs 50. Commuters can purchase tickets through a dedicated app or at physical counters, and the National Common Mobility Card will be valid across all metro lines by next month. The Metro line is expected to be fully operational by June 2025 and aims to reduce vehicular traffic by approximately 650,000 trips
#metro3
#mumbai
#mumbaimetro
#underground
#aqualine
#integrated
#metroupdate
#bkc
#aarey
#metro3
#mumbaiundergraound
#techno
#bkc
#seepz
#marol
#india
Status of metro 3 in Mumbai is Phase 1 is that its opened and functional.
Stations on the metro 3 route in Mumbai in Phase 1 are Aarey Jvlr, Seepz,MIDC, MAROL, CSMIA T2, Sahar, CSMIA T1, Santacruz Metro, Bandra Colony and BKC
Mumbai Metro Line 3 is fully underground Metro with Aarey as at grade.
Mumbai Metro 3 completion date May 2025
Mumbai Metro Line 3 opening date is 7th October 2024
Mumbai Metro Line 3 stations in Phase 1 are Aarey Jvlr, Seepz,MIDC, MAROL, CSMIA T2, Sahar, CSMIA T1, Santacruz Metro, Bandra Colony and BKC
Mumbai metro 3 app is metroconnect3
Mumbai Metro 3 Phase 1 are Aarey Jvlr, Seepz,MIDC, MAROL, CSMIA T2, Sahar, CSMIA T1, Santacruz Metro, Bandra Colony and BKC
Aarey Metro station Line 3 in Phase 1 are Aarey Jvlr, Seepz,MIDC, MAROL, CSMIA T2, Sahar, CSMIA T1, Santacruz Metro, Bandra Colony and BKC
Mumbai Metro Line 3 Phase 2 is under construction.
Mumbai Airport Terminal 2 to Metro station distance is 100 aprx mtr.
Airport Road Metro station to Terminal 2 Mumbai is 100 mtr away.
Mumbai Metro line 3: Colaba-Bandra-Seepz Metro
Line 4 (Green Line) of the Mumbai Metro is an under-construction - from Wadala (Mumbai) to Kasarvadavali (Ghodbunder road, Thane) via Chembur, Bhandup Mulund and Teen Hath Naka
Line 5 (Orange Line) - will connect Thane with Kalyan via Bhiwandi, with 17 stations. The line will be fully elevated except for a 3 km underground section in Bhiwandi.
Line 6 (Pink Line) - connect Lokhandwala Complex with Vikhroli
Line 7 (Red Line) - will connect Bhayander with the Chhatrapati Shivaji Maharaj International Airport with 24 stations
Gold Line 8 - Airport Express Line part of the metro system for the city of Mumbai & Navi Mumbai, India. It will serve direct connectivity from CSMIA Airport in Mumbai to NMIA Airport in Navi Mumbai
Red Line 9 (extension) -is an extension of the Red Line from Andheri to CSMIA and Dahisar to Mira Road and it will run on a double-decker bridge
Green Line 10 - Extension of Line 4 (Green Line) - Gaimukh-Shivaji Chowk (Mira Road) corridor , Thane Metro
Green Line 11 - Extension of Line 4 (Green Line) - from Wadala-CSMT
etc and other proposes
Mumbai metro
Atal Setu bridge mumbai or
Mumbai Trans Harbour Sea Link or Mumbai Trans-Harbour Sealink (MTHL)
Airoli katai elevated roads or
Airoli-Katai Tunnel Road
Goregaon Mulund Link Road
Navi Mumbai International Airport (NMIA)
Sewri Worli Elevated Corridor or SWEC
Chheda Nagar Flyover
Dombivli Mankoli Flyover or
Motagaon Mankoli Bridge
Dombivli-Thane Link Road
Bullet Train Mumbai to Ahmedabad or
Mumbai-Ahmedabad Bullet Train Corridor
Mumba Delhi Expressway
Navi Mumbai International Airport
Samruddhi Mahamarg
etc
mumbai metro aqua line
mumbai metro line 3 update
mumbai aqua line update
metro 3 update
mumbai aqua line 3 update
Latest update of mumbai aqua line update
Latest update of metro 3 update
mumbai aqua line Latest update of 3 update
mumbai aqua line Latest update
metro 3 Latest update
mumbai aqua line Latest update of 3 update
bkc metro station
mumbai metro line 3 latest update
aqua line metro
mmrda
mumbai metro line 3 trial run
mumbai aqua line metro
mumbai aqua line
mumbai underground metro
mumbai underground metro update
mumbai underground metro station
mumbai underground metro line 3
mumbai underground metro latest update
mumbai underground metro trial
mumbai underground metro colaba to seepz
mumbai underground metro route work
mumbai underground metro work
mumbai mein underground road of metro
underground mumbai metro me safar kab se
mumbai underground metro ka detail