Online Water wash, Offline Waterwash in Gas turbine power plant

Поделиться
HTML-код
  • Опубликовано: 26 дек 2024

Комментарии • 17

  • @osabu9949
    @osabu9949 8 месяцев назад +1

    Very interesting ..plz I have sent you an email to join your weekend classes and yet to receive an email of receipt from you

    • @powerplantguru007
      @powerplantguru007  8 месяцев назад

      Hi Osabu
      We appreciate your interest in joining our classes,. However due to very busy work schedule we are not able to conduct from.last few weeks. We will inform you once we restart the session.
      Thank you for watching my videos.

  • @kanchankumar-pm9ox
    @kanchankumar-pm9ox 5 месяцев назад +1

    Hello Sir, a video on Gas turbine startup sequence would be helpful.

  • @Ankit_Tarpara
    @Ankit_Tarpara 8 месяцев назад +1

    Very good information sir.. like to see ur videos -you shared basic concepts of power plant O&M as well as technical concepts. Thank you sir.

  • @pranavgrish5167
    @pranavgrish5167 6 месяцев назад +1

    I need 600 mw boiler Commissioning procedure and responsibilities

  • @gustavomarcelo7250
    @gustavomarcelo7250 8 месяцев назад +1

    Sir.
    Maybe 'what if' video.
    If this parameter change ( high or low ) what will be the effect.

  • @osabu9949
    @osabu9949 8 месяцев назад +1

    Also can you make a video on steam TSI System ..am a field technician preparing for a control room operator role ..

  • @souvikdey6257
    @souvikdey6257 8 месяцев назад +1

    Nice topic, ❤ love to see ur video's. Can u pls told what is false start drain valve and why it used

  • @ishmealallotey9825
    @ishmealallotey9825 7 месяцев назад +1

    Please I want to join your weekend classes

    • @powerplantguru007
      @powerplantguru007  7 месяцев назад

      Hello thank you for watching my video. Please join membership for our channel to join weekend sessions.
      ruclips.net/channel/UCiLxCcf8GyA_355AFmi1Kcgjoin

  • @pranavgrish5167
    @pranavgrish5167 6 месяцев назад +1