Automatic Transfer Switch (ATS) Chargeover Connection / How to Work ATS / ATS for Single Phase

Поделиться
HTML-код
  • Опубликовано: 4 ноя 2024

Комментарии • 13

  • @stephensparrowhawk
    @stephensparrowhawk Год назад +2

    Best video covering this subject I have seen. Have subscribed.

  • @nadr2020
    @nadr2020 2 года назад

    great 👍 video

  • @modifyman6977
    @modifyman6977 Год назад

    Yeah...that hand drawing is....uhm....
    Have you considered using a stamp?

  • @vladyslav-py-js-cs
    @vladyslav-py-js-cs 2 года назад +1

    Why do you connect the line to the switch, etc. from below? In my country there is a special rule that you should always connect the line to the top contact

  • @roshansemasinghe91
    @roshansemasinghe91 2 года назад +1

    👍

  • @teknisiamatir91
    @teknisiamatir91 2 года назад

    please video ATS solar system with contactor,inverter,&auto mnaual...

  • @edwardcerillo365
    @edwardcerillo365 Год назад +2

    How the generator automatically switch on when the power cutt off

  • @afrog3569
    @afrog3569 Год назад

    Can it work with grid, solar, and generator?

  • @brokbtv638
    @brokbtv638 Год назад

    From the poll u didn't connect The n. To the breaker bf the meter why