Dental clinic setup and organization for right- & left-handed dentists - Arabic عربي

Поделиться
HTML-код
  • Опубликовано: 12 июл 2024
  • Dental clinic setup and organization for restorative procedures for Rt- & Lt-handed dentists
    - To learn about restorative dental instruments, watch the video: • Restorative dental ins...
    - To learn about cutting hand instruments, watch the video: • Cutting hand instrumen...
    - To learn about rotary Burs, watch the video: • Operative Rotary Burs ...
    - To learn about the differences between high & low-speed handpieces, burs & eccentric bur, watch the video: • Differences between hi...
    - To learn about composite instruments and tools setup, watch the video: • Resin composite cavity...
    - To learn about amalgam instruments and tools setup, watch the video: • Amalgam cavity prepara...
    Subscribe for more Preclinical Operative Dentistry videos: / @drafnanoalzain
    Music: www.bensound.com
    Introduction headpiece pic: shutterstock.com
    --- Contents of this video ---
    00:00 - Introduction
    00:14 - Title: Dental clinic setup and organization
    00:20 - Dental clinic setup and organization
    01:15 - Sterilized Instruments
    01:17 - Instruments: 1. Handpieces, adapters, suction tips & light-curing unit
    01:20 - Instruments: 2. Rubber dam kit, clamp, & syringe
    01:25 - Instruments: 3. Examination kit & restorative kit
    01:30 - Wrapping the clinic
    01:35 - Sections: 1. Suction & light-curing unit
    01:43 - Sections: 2. Patient rinsing cup
    01:49 - Sections: 3. Surfaces: a. Surface 1 (main/working station)
    01:59 - Sections: 3. Surfaces: b. Surface 2 (auxiliary station)
    02:08 - Sections: 3. Surfaces: c. Surface 3 (clean station)
    02:18 - Sections: 3. Surfaces: Surface 1, 2, & 3
    02:22 - Sections: 3. Surfaces: d. Surface 4 (infected station)
    02:30 - Instruments & Sleeve placement: 1. Suction adapters & tips, & LCU
    03:23 - Instruments & Sleeve placement: 2. Three-way syringe & handpieces
    03:59 - Discard the trash
    04:02 - Surfaces: a. Surface 1: Examination kit, cotton rolls & pellets, gauze, & procedure trash cup
    04:17 - Surfaces: b. Surface 2: Bur holder & syringe
    04:39 - Surfaces: c. Surface 3: Instruments & tools
    04:49 - Surfaces: c. Surface 3: Instruments & tools: 1. Rubber dam kit
    05:18 - Surfaces: c. Surface 3: Instruments & tools: 1. Rubber dam kit. Prepare 3 pieces of dental floss
    05:42 - Surfaces: c. Surface 3: Instruments & tools: 2. Restorative kit
    05:56 - Surfaces: c. Surface 3: Instruments & tools: 3. Excavator
    06:10 - Surfaces: c. Surface 3: Instruments & tools: 4. Calcium hydroxide applicator
    06:17 - Surfaces: c. Surface 3: Instruments & tools: 5. Cement spatula
    06:23 - Surfaces: c. Surface 3: Instruments & tools: 6. Restorative materials & tools
    06:38 - Surfaces: c. Surface 3: Instruments & tools: 7. Bite block
    07:08 - Surfaces: c. Surface 4: Infected instruments
    07:16 - Sections setup
    08:23 - Sections setup: Right-handed dentists
    08:27 - Sections setup: Left-handed dentists
    08:38 - Sections setup: Right- & Left-handed dentists
    08:52 - During: Place the instruments needed on surface 1: 1. Rubber dam instruments
    09:07 - During: Move infected instruments to surface 4
    09:20 - During: Place instruments that you will still need on surface 1 or 3
    09:26 - During: Place the instruments needed on station/surface 1: 2. Cavity preparation instruments & tools: a. Burs in use
    09:38 - During: Place the instruments needed on station/surface 1: 2. Cavity preparation instruments & tools: b. Excavator
    09:49 - During: Move the infected no longer needed instruments to surface 4
    10:00 - During: Place the trash in the procedure trash cup
    10:07 - During: Place the instruments needed on surface 1: 3. Restorative instruments & tools: a. Hand instruments
    10:14 - During: Place the instruments needed on surface 1: 3. Restorative instruments & tools: b. Matrix band & wedge
    10:22 - During: Place the instruments needed on surface 1: 3. Restorative instruments & tools: c. Bonding system & composite materials
    10:39 - During the procedure: Move the infected no longer needed instruments to surface 4
    10:44 - During: Surface 1: 3. Restorative instruments: d. Finishing & polishing tools
    11:13 - During: Surface 1: 3. Restorative instruments: e. Articulating paper
    11:25 - Finishing: Clinic is still organized
    11:51 - Finishing: Infected instruments are on surface 4
    12:01 - After: Remove the needle & carpule
    12:14 - After: Discard the needle
    12:20 - After: Detach the three-way syringe & handpieces
    12:25 - After: Discard the trash
    12:28 - After: Place the infected instruments on surface 4
    12:30 - After: Detach the suction adapters & LCU
    12:31 - After: Place the infected instruments on surface 4
    12:35 - After: Clinic is cleaned up and organized
    12:40 - After: Infected instruments are on surface 4
    13:00 - After: Remove the wrapping
    13:22 - After: Return the instruments for sterilization
    13:24 - After: Disinfect the clinic
    Instagram: @afnanalzain
    Twitter: @afnanalzain
    Telegram Channel: Dr. Afnan O. Al-Zain / t.me/afnanalzain
    Email: info@afnanalzain.com

Комментарии • 25