Ringaskiddy Motorway Project - November 2024

Поделиться
HTML-код
  • Опубликовано: 10 янв 2025

Комментарии • 34

  • @KathrynGrace-t5v
    @KathrynGrace-t5v Месяц назад +1

    Very good footage thanks for sharing.❤

  • @stuartlast8156
    @stuartlast8156 Месяц назад +5

    Once again excellent video, thank you 👏👏

  • @Oluinneachain
    @Oluinneachain Месяц назад +3

    My boyhood hinterland. Good to see it from the air but sad to see so much swept away.

  • @johndoughnut8617
    @johndoughnut8617 Месяц назад +2

    Sorrenson done the new stretches of road past Kildorrerry too

  • @donstravelsandrants.
    @donstravelsandrants. Месяц назад +3

    Excellent drone footage. Well done, and thanks for the information. 👍😊

  • @farmerjimmy7453
    @farmerjimmy7453 Месяц назад

    Some great shots 👌unreal how long there messing around with this road instead of just getting on with it as its badly neeeded.soresens seem to be the new road bridge getting all fhe big contracts now .

  • @dazzer273
    @dazzer273 Месяц назад

    These videos are great for highlighting the variety of infrastructure projects around the country try.
    Will this new motorway join the N28?

    • @dronehawk
      @dronehawk  Месяц назад

      It will rejoin and replace the N28 at Carrs hill near mount Oval

  • @kiohaha
    @kiohaha Месяц назад +6

    Ah now, who let the planning through for houses to be built that close to a proposed motorway. 0:49 lol kids don’t kick the ball too high as it might gover over the back garden fence onto the motorway. Sorry but there is some clowns in public office but worse some clowns as architects and greedy developers 😂 that’s crazy move the motorway another 500meters east of this view and it’s empty with no houses. You still buying up farmland it’s just abit further away from houses haha
    Just found your channel starting to like it. It’s shows clearly as you are flying from above how stupid planning is in Ireland. You wouldn’t notice this from ground level. Keep it up 👍 0:49

    • @tombarry2523
      @tombarry2523 Месяц назад +1

      Meanwhile the old IFI plant in Cobh lies idle which could have been a much easier location to develop for a container terminal. We can’t seem to plan properly in this country.

    • @FgGh-hl8mc
      @FgGh-hl8mc Месяц назад +1

      we will never plan properly until people need start electing new people into councils dail and do what's best for local areas get rid old parties and pretend independents ex FF FF SF Labour and retire from politics after 10 years

    • @liamhartnett4117
      @liamhartnett4117 Месяц назад +2

      The road won’t be a “Motorway” at this location. It will be a single carriageway from the Barnahely roundabout as far as the port of cork. You should do some research before you post giving out about planners as it’s obvious you don’t know what you are talking about.

    • @tombarry2523
      @tombarry2523 Месяц назад

      @ A massive road infrastructure going from Ringaskiddy up to the cork tunnel does not make sense considering that easier options existed. Typical Ireland, all we are good at is building roads.

    • @dronehawk
      @dronehawk  Месяц назад +2

      ​@tombarry2523 IFI site will never be developed. Passage all ready complaining about noise from generators on the MV Mathew tied up at Marino. Imagine what they'd do if there was a container facility trundling away all night offloading steel containers.

  • @liamkeane9159
    @liamkeane9159 Месяц назад +4

    Who is doing this project, why aren't they advertising for construction workers

    • @dronehawk
      @dronehawk  Месяц назад +3

      This initial section is being done by Sorensen . It's only 1.5km of single carriageway road , and they've 20 months to do it , so a small crew will suffice for now. The main contract for the motorway hasn't been greenlit yet .

    • @robertomeara3469
      @robertomeara3469 Месяц назад +1

      Theyve a ready supply from the Ipas centres

    • @MrRebelbell
      @MrRebelbell Месяц назад

      Thank duck, cut my commute times

    • @rival7005
      @rival7005 Месяц назад +1

      As usual with every big road project in ireland the Italians are more than likely building it

  • @dermotbrosnan7417
    @dermotbrosnan7417 Месяц назад +1

    Yes, building a raised motorway so that the traffic noise will be easily heard by all the houses who live nearby. Progress at the loss of quality of life for all who live in its path. As they say in the Star Trek song, 'it's life Jim but not as we know it'.!!!

  • @tomfitzpatrick7335
    @tomfitzpatrick7335 Месяц назад +2

    Where is that & what is even happening?

    • @dronehawk
      @dronehawk  Месяц назад +2

      New Cork to Ringaskiddy port motorway, might start proper next year

    • @tomfitzpatrick7335
      @tomfitzpatrick7335 Месяц назад +1

      @dronehawk and they're thinking about roads again instead of railways (sigh) 😔

    • @07claas1
      @07claas1 Месяц назад

      Who is doing the muckshifting?

    • @dronehawk
      @dronehawk  Месяц назад

      @@07claas1 This initial section - Sorensen . For the main contract it will probably be Sisk and Soresen JV

    • @07claas1
      @07claas1 Месяц назад

      @dronehawk They are doing the adare bypass too?

  • @brianoregan3227
    @brianoregan3227 Месяц назад

    Great footage-badly needed road

  • @shanef8728
    @shanef8728 Месяц назад

    sisk and Sorensen? Arent they doing the adare by pass as well? Get that done first ffs