Thanks for the feedback. I typically make over heads but for this one I already knew what we needed. Next video breakdown I do i'll be sure to include an overhead of the setup.
I had a 1st AC and a Gaffer along with a PA. Other than that while I was out with the director and producer grabbing b-roll shots I had my gaffer and AC help setup the frames so they would be ready to go by the time we got back. Usually something like this with only two people setting things up would take around 45 minutes give or take.
That was really intreresting, nice Shot. I wish you had a bts shot or lightplan to make it even better to understand. Thanks
Thanks for the feedback. I typically make over heads but for this one I already knew what we needed. Next video breakdown I do i'll be sure to include an overhead of the setup.
@@atdavidlee thanks, much appreciated
What was the crew size and how long did it take yall to set all of this up?
I had a 1st AC and a Gaffer along with a PA. Other than that while I was out with the director and producer grabbing b-roll shots I had my gaffer and AC help setup the frames so they would be ready to go by the time we got back. Usually something like this with only two people setting things up would take around 45 minutes give or take.