Or you could wire all those loads on the ac-out2 port (that turns itself off when on a outage) of the Multis and remove all those fail prone parts you added. Could had been interesting if you added the configuration procedure for controlling the multis relay.
Neat setup. I would also like to do this in time I love automation. I also plan to automate my geyserwise controller with a tuya wifi setup!
Or you could wire all those loads on the ac-out2 port (that turns itself off when on a outage) of the Multis and remove all those fail prone parts you added.
Could had been interesting if you added the configuration procedure for controlling the multis relay.
Thanks for this 😀
Hi Alan thanks for this useful video. Any chance you can post more detail on how to set this up please?
Alan why the camera at the prepaid meter ?
Lol good question .... so I can check the balance from a Greek beach