How to use Victron Energy Meters ET112 and ET340

Поделиться
HTML-код
  • Опубликовано: 23 янв 2025

Комментарии • 13

  • @9111logic
    @9111logic День назад

    🙏Thanks for sharing -

    • @eastrenewables
      @eastrenewables  22 часа назад

      You are welcome thanks for watching I have one coming up about the new Victron meter which will be posted soon.

  • @philc1372
    @philc1372 6 месяцев назад

    Thank you for clarifying. Very helpful 👍

    • @eastrenewables
      @eastrenewables  6 месяцев назад

      Thanks for the feedback. If there anything else you would like me to make video on in more detail let me know 🙏

  • @zjzozn
    @zjzozn 4 месяца назад

    Very nice 👍

  • @martynreed2355
    @martynreed2355 4 месяца назад

    Nice video. Question, can you use the ET340 to measure 2 AC loads (not grid)? eg 2 separate PV systems?

    • @eastrenewables
      @eastrenewables  4 месяца назад

      Thanks 🙏 Great question so I am currently using it to measure separate AC loads such as Hot water and EV Charger. Whilst these don’t appear in the main screen of VRM the data can be shown in the advanced section.
      As regards to measuring 2 PV inverters I haven’t tried it but can’t see why not it would likely combine the data on the VRM dashboard as 1 PV inverter but it would be treating it almost like a 3 phase meter

  • @ProMace
    @ProMace 6 месяцев назад

    Nice video! Is that loud hum coming from the Multiplus? 😮

    • @eastrenewables
      @eastrenewables  6 месяцев назад +1

      Thanks, it is indeed, in fairness it was kicking out some power at the time but the fans in the multiplus do seem to be quite industrial sounding.

    • @UKsystems
      @UKsystems 2 месяца назад +1

      When it’s Saturday high-power it’s important to remember the transformer is also under a load

  • @UKsystems
    @UKsystems 2 месяца назад

    This may have been done before they said so, but I’m pretty sure you’re explicitly banned from installing this equipment under stairs in any new install

    • @eastrenewables
      @eastrenewables  2 месяца назад

      Indeed it has been there for near on 2 years now. The PAS 63100 document that came out recently I think you are referring to does have excellent guidance and I agree should be where practically possible the minimum standard we design and install too now.
      I would prefer to relocate this setup but there isn’t many better options. we have double boarded to provide 1 hr fire protection with interlinked smoke detectors, it is also not adjacent final exit routes and there is alternative means of escape.
      Certainly welcome your comments as I feel we should always be looking to improve standards and safety. hope the video was also in some way useful to you 🙏