    @tommywong3147 Год назад +131

    I hope I live long enough to see this complete

    • @Amritwalia12
      @Amritwalia12  Год назад +6

      Haha!

    • @esgee3829
      @esgee3829 Год назад +4

      2031 ffs

    • @AnimeBeefRandoms
      @AnimeBeefRandoms Год назад +10

      @@esgee3829 might get delayed to 2051🤣🤣

    • @esgee3829
      @esgee3829 Год назад

      @@AnimeBeefRandoms très tf

    • @bedinskiboi
      @bedinskiboi Год назад +5

      Hey at least be glad you don’t live in NYC… here, we also have. Subway extension that’s supposed to take that long, but it is like 3 stations

  • @62Cristoforo
    @62Cristoforo 9 месяцев назад +20

    40 years behind schedule.
    Public transit expansion in Toronto stopped in the late 70’s.

    • @tcsnowdream9975
      @tcsnowdream9975 6 месяцев назад +1

      Better late than never, honestly. I’m still bitter the englington isnt a true subway. But whatever.
      I hope we can extend the western portion of the Ontario Line so it goes up to Dufferin and up to line 2. It would be great for that transit desert.

    • @TheSharkasmCrew
      @TheSharkasmCrew 2 месяца назад

      Well technically they expanded line 2 in the early 80s, added the scarborough extension in the mid-late 80s, expanded university line in the 90s, built line 4 in the early 2000s, and expanded the university line again in the late 2010s. But yeah I agree they're remarkable unambitious and seem to always be reactive rather than proactive.

    • @TheSharkasmCrew
      @TheSharkasmCrew 2 месяца назад

      @@tcsnowdream9975 that would be pretty sick. Could go up dufferin after a stop at queen and ossington, and then curve over to the junction 😳 they could also be utilizing the UP way better, if they had a station at liberty village, junction, and maybe mt dennis, and made it cheaper then it would be like a whole 'nother subway line! I don't get why its so pricey, in vancouver you can ride from downtown all the way to the airport for standard skytrain fare.

  • @vuvuzela691
    @vuvuzela691 Год назад +19

    I hope more subway lines in toronto are built above ground with elevated guideways! Lots of streets outside the core are wide enough to accommodate the space, it doesn't have to worry about red traffic lights like lrts and is cheaper than tunneling. the davenport diamond elevated guideway shows it can be done in toronto, quickly and relatively cheaply

    • @JohnFinnigan1
      @JohnFinnigan1 Год назад +3

      Agree. Montreal's REM is an example of how successful elevated rail can be, and it's a nicer experience for riders.

    • @hakohito
      @hakohito 8 месяцев назад +1

      Yeah, idk why they arent doing that in Toronto

    • @steffieboy19
      @steffieboy19 Месяц назад

      Let me tell you guys, that will be very ugly in the longterm. We have it here in Amsterdam in the south east. Its very ugly.

  • @danielinnes8839
    @danielinnes8839 Год назад +25

    I have had the pleasure of working on this subway line for a co-op. It's going to do wonders to open up transit access to so many people east of the Don and up in Thorncliff

    • @Amritwalia12
      @Amritwalia12  Год назад +4

      Great to hear that!

    • @Jay-vr9ir
      @Jay-vr9ir Год назад +1

      It will also give much more access to the homeless , so they can go to many more places to bother people,for money.

    • @picklepoppers8223
      @picklepoppers8223 Год назад +1

      ​@@Jay-vr9ir 😂

  • @team1200
    @team1200 11 месяцев назад +6

    You missed that beyond just getting to the CNE, Exhibition will connect Liberty Village (one of the most dense neighbourhoods in the city) to the rest of downtown! Game changer!

    • @Amritwalia12
      @Amritwalia12  11 месяцев назад +1

      You’re right! Absolute game changer. Much appreciated and thanks for watching!

    • @nimkiitrish
      @nimkiitrish 7 месяцев назад

      if you can afford to live in liberty you aren't taking transit... the old exhibition go station would have made more sense for the poor in parkdale

    • @team1200
      @team1200 7 месяцев назад

      @@nimkiitrish I bought in Liberty and I take transit everyday...I'm guessing you're from the suburbs? Transit is just the quickest way to get around in the downtown core, I don't have time to sit in traffic to drive 3km lol

    • @nimkiitrish
      @nimkiitrish 7 месяцев назад

      I have lived in the area for more than half my life longer than Liberty has been there. The building of that monstrosity, left the poor and elderly a few blocks away in a food desert. They moved transit further towards liberty. As for traffic, it is now a nightmare as well. I curse Liberty!

  • @Natalietrans
    @Natalietrans Год назад +16

    TTC completed the main game and is now doing the side quests like “Lost in LRT land”, and “Elizabeth line was taken”

  • @boomslangCA
    @boomslangCA Год назад +5

    Can't wait until it opens spring of 2051.

    • @mikedarling905
      @mikedarling905 3 месяца назад

      wow pretty generous with the time line, you think 2051 is achievable?

  • @stephen9609
    @stephen9609 7 месяцев назад +1

    Why did you abruptly end the analysis - what about the other stations?

  • @rotimifadiya4276
    @rotimifadiya4276 Год назад +4

    i remember when the Vaughan line was built, super super valuable - excited for this!

    • @Amritwalia12
      @Amritwalia12  Год назад +1

      Yes, it’s going to be a good one!

  • @Ameoba2002
    @Ameoba2002 Год назад +5

    I enjoyed the video, although you failed to discuss the subway stations north of Pape.

  • @northernsurferboy
    @northernsurferboy Год назад +1

    @2:04 street car is about 30-45 minutes from Bathurst, it will also serve Liberty Village

  • @mikelynch-zeroviewz2507
    @mikelynch-zeroviewz2507 8 месяцев назад +1

    Ontario line is awesome... I just wish they would extend it up to Shepherd to Fairview Mall and the Shepherd Line.

  • @andrewwilliams2193
    @andrewwilliams2193 Год назад +1

    And still no plans for Scarborough?

  • @darrenjohntaylor1
    @darrenjohntaylor1 Год назад +1

    I just love Indian people constantly talking for Canada...

  • @highwaywu621
    @highwaywu621 Год назад +3

    See you in 2123.

  • @nevilletaylor9761
    @nevilletaylor9761 8 месяцев назад +2

    Based on Metrolinx’s performance on the Eglinton LRT the Ontario line will be completed sometime after 2040 and will more or less bankrupt the province in the process. A complete disaster.

  • @garthmerkeley
    @garthmerkeley Год назад +1

    That was super helpful! Great video.

  • @viewfromthehighchair9391
    @viewfromthehighchair9391 Год назад +6

    Good video with some great analysis. I will point out one minor factual error (oversight). There is a fourth interchange station at the north terminus of the line at Eglinton and Science Centre on the new Eglinton Crosstown line. Looking forward to new update videos from you.

    • @Amritwalia12
      @Amritwalia12  Год назад +2

      Yes I missed out on that one in the video, sorry about that.
      Thank you for watching :)

  • @tokyogamer5825
    @tokyogamer5825 Год назад +2

    wow i'm surprised you didn't talk about the major interchange on the new eglinton crosstown line 5 that will connect ontario line to midtown Toronto.

  • @thomassmith1922
    @thomassmith1922 11 месяцев назад +1

    I don't think even one person will ever ride on this subway. It will take far too long to complete and some sort of Black Swan Event will occur prior to its completion. Canada will be completely flat by then. Good day

  • @johnedieter739
    @johnedieter739 Год назад +2

    That was nice as far as you went, I was waiting to hear about the remaining stations after Pape... will you be doing them?

  • @andreiter
    @andreiter 4 месяца назад

    a subway line that ends at the Science Centre? The same place that is now moving to the lake??

  • @wjdietrich
    @wjdietrich Месяц назад +1

    The two terminus points, Exhibition Place( where the historic CNE is held ) and Ontario Science Centre, both have doubtful futures currently due to the present conservative Ontario Provincial government!

    • @Amritwalia12
      @Amritwalia12  Месяц назад

      Yes it’ll be interesting to see how it turns out. Thanks you for watching!

  • @TomStorey
    @TomStorey Год назад +7

    Great info. This will be great for the city.

    • @Amritwalia12
      @Amritwalia12  Год назад

      Definitely!

    • @randyscott1496
      @randyscott1496 Год назад

      it's only great for Ford. The kick backs must be huge.

    • @jab2780
      @jab2780 Год назад

      How, the problem south of Bloor was ALWAYS east-west traffic, even with the inception of the subway. And the Eglinton line is suppose to help with east-west traffic north of Bloor. We don't need a line crossing the downtown. What a waste. And seems all Doug Ford has done since being elected was give developers free reign to tear down shopping centers, restaurants entertainment venues, retail, and put up ugly condo and apartment towers. So not only is congestion 10, 100, 1000 fold, we have less and less places to go. Toronto is a very very sick city.

    • @ant8504
      @ant8504 Год назад

      @@jab2780 this line's main goal is to relieve the north-south traffic that exists on the Yonge portion of line 1. It's actually way better planned than previous relief line which would have had little functionality besides the aforementioned goal, at least the Ontario line will provide connections to more communities. Although I do agree with your critisms of Doug Ford. I personally believe that the Ontario line is a much needed project but I feel his motivations for greenlighting it is to take the attention off of his concessions to his developer buddies.

    • @jab2780
      @jab2780 Год назад

      @@ant8504 If they had more reliable southern east-west line (Queen St/King) and northern east-west line, it would be fine. But Exhibition north-east to whatever. OMG.

  • @viewfromthehighchair9391
    @viewfromthehighchair9391 3 месяца назад

    I just rewatched some of the video (because RUclips likes to bring back the classics - 🤨) and I decided to retract your "thumbs up" because you didn't mention the Argos at BMO when you talked about "all the events" at the Exhibition stop. Sorry but, if you forget the Argos, I forget to be nice to you. LOL

  • @hdlim8753
    @hdlim8753 Год назад +2

    2023 to 2031? 8 years to build a subway line? Contact the chinese contractor. they can build it in 4 years time plus 2/3 of the cost!!!

  • @dentrobate54
    @dentrobate54 Год назад +5

    3 potential infill stations that could and should be added in: Liberty Village (Strachan/East Liberty), Distillery District (Cherry/LSE corridor) and Mortimer (Pape/Mortimer).

    • @Amritwalia12
      @Amritwalia12  Год назад +3

      Agree! :)

    • @davidbrowne5792
      @davidbrowne5792 Год назад +2

      I think Lakeshore/Bathurst where the loblaws is would be a great stop as there are a lot of condos/population there

    • @crhayes
      @crhayes Год назад +1

      Strachan and East Liberty, although close to Exhibition, is a missed opportunity IMO.

  • @michaeljamesstewart1000
    @michaeljamesstewart1000 7 месяцев назад

    What about the remainder of the line......up to the Science Centre? Chimo

  • @nriq90
    @nriq90 Год назад +2

    Do people really need another subway line in the DT? Guess we’ll see in 2050!

    • @TheSharkasmCrew
      @TheSharkasmCrew 2 месяца назад

      Can't tell if this is serious doubt or just a segue into the 2050 joke but yes the downtown area is so brutally desperate for another subway line or two

  • @rotatorcuffs8140
    @rotatorcuffs8140 9 месяцев назад

    Why does it curve to bypass Union? Why not just keep the line straight and increase speeds that way?

  • @jimhuynh9135
    @jimhuynh9135 8 месяцев назад +2

    Finish in 2050 🤞

  • @KD-mz5xv
    @KD-mz5xv 11 месяцев назад +1

    very informitive
    thanks for the info

  • @VAPOURIZE100
    @VAPOURIZE100 Год назад

    Brooo good video but how did u not show the stations near eglinton line which is being finished this year its gonna be a huge change to the city it's like a mini subway

  • @bryanz5904
    @bryanz5904 Год назад

    Thanks!
    And do you think working in the TTC design apartment is a good choice for engineers? For the project Ontario Line South.

  • @andymod
    @andymod Год назад +1

    I'm very excited about this project! Hope it will be done on time :)

    • @Amritwalia12
      @Amritwalia12  Год назад

      Same and hope for the best!
      Thank you for watching.

    • @BmanTheChamp
      @BmanTheChamp Год назад

      Well if the Eglinton LRT is any indication...

    • @andymod
      @andymod Год назад

      @B-man The Champ Still we want to believe :)

    • @PWingert1966
      @PWingert1966 Год назад

      No major TTC line in Toronto has ever come to fruition on time and on or under budget/ I expect it won't be done till 2035 and at least a billion dollars over budget.

  • @mikedarling905
    @mikedarling905 3 месяца назад +1

    i will probably die from old age by the time they finish it.

  • @pat4455
    @pat4455 2 месяца назад

    Undeserved waste of resources, but hey downtown will benifit. Its amazing how quickly that happened, unlike Scarborough that waited 40 years

  • @MarcinMoka1
    @MarcinMoka1 Год назад +6

    Well done. Too bad I had to leave Toronto for a more affordable place….like the ☀️ Sunny French Riviera….

  • @masteronionnorth2341
    @masteronionnorth2341 Год назад +1

    Wasn't construction actually started in 2022? 🤔

    • @mega6076
      @mega6076 11 месяцев назад

      I think 2020 or 2021

  • @pammiwalia7593
    @pammiwalia7593 Год назад +1

    Amrit ur all VDOS r so informative !

  • @ribasenric
    @ribasenric 3 месяца назад

    Curious why Ford would want to sell Ontario Science Centre to developer friends now that the land will be on a subway line and worth a ton more. :)

  • @SteveKarrasch
    @SteveKarrasch Год назад +1

    Great info Amrit!

  • @xixi560
    @xixi560 Год назад +2

    Lmao I'm Aussie but had to look up that McDonald's, holy. I've been to a similar one plenty of times but the Queen/Spadina McD definitely takes the cake

    • @Amritwalia12
      @Amritwalia12  Год назад +1

      Haha yea the one on queen & Spadina is an interesting one!

  • @PWingert1966
    @PWingert1966 Год назад +2

    As for the tree replanting, if you read the site report that was prepared for Osgood Hall station replanting the tree will not be possible because there will not be enough soil due to the underground construction around the station. Once these trees are gone that's it.

  • @ryleighloughty3307
    @ryleighloughty3307 Год назад +1

    Why does the line not continue to Sheppard Avenue?

    • @Amritwalia12
      @Amritwalia12  Год назад +1

      Sorry for late response.
      You mean sheppard ave east ? They are going to extend the line 2 from Kennedy station to Sheppard ave east ( Sheppard & McCowan).

    • @ryleighloughty3307
      @ryleighloughty3307 Год назад +1

      @@Amritwalia12 Thank you for responding. Why does the Ontario Line not continue north under Don Mills and then intersect with the Sheppard East Subway?
      And that it continues north to Finch East to service the Seneca College Campus.
      It seems odd that this is outside the plan.

    • @tasneemfatema7346
      @tasneemfatema7346 Год назад

      @@ryleighloughty3307 once the line gets built there's always possibility for future extensions

    • @ryleighloughty3307
      @ryleighloughty3307 Год назад

      @@tasneemfatema7346 Yes, but it seems logical that it continues to Sheppard to intersect with the Sheppard line. Odd.

  • @playbak
    @playbak Год назад

    Queen & Spadina McDicks… if you know, you know haha well said

  • @aknightstale2248
    @aknightstale2248 10 месяцев назад

    Clearly you live in the west side of Yonge...breeze right though the east side

  • @TagusMan
    @TagusMan 10 месяцев назад

    The line, as first conceived 100 years ago, connected with either Dufferin or Dundas West, and therefore properly served the West End. As it is now, it serves only Liberty Village. Another wasted opportunity that we're going to have to fix and pay for with lots more money decades from now.

  • @xxhshrebyba
    @xxhshrebyba Год назад

    finch and eglinton lrt isn’t even done yet -_- toronto works on way too many projects at one time and it causes so much traffic

  • @Ankit-kq7wx
    @Ankit-kq7wx Год назад

    More videos like this, 🤠

    • @Amritwalia12
      @Amritwalia12  Год назад

      Sure, will try my best! Thanks for watching.

  • @pizzamizza2375
    @pizzamizza2375 Год назад

    bro im finna be on my death bed and then someones gonna tell me they just finished the line 😭

  • @jaygatz4335
    @jaygatz4335 Год назад

    Whatever happened to John Tory's Smart Track project?

  • @kilowagmagnusson4590
    @kilowagmagnusson4590 Год назад

    It's going to cost 5 times more than stated, and be delayed by 2-3 years, you'll see.

  • @diariesofsureka8877
    @diariesofsureka8877 Год назад

    4 with the line 5 eglinton crosstown

  • @squadron5678
    @squadron5678 Год назад +1

    Great information

  • @BoBandits
    @BoBandits Год назад

    For some reason, I thought the Ontario Line was using the GO corridor in the Don Valley..

    • @Amritwalia12
      @Amritwalia12  Год назад +1

      The joint corridor (GO transit and Ontario line ) will be between the station East Harbour and Gerrard station.
      Thank you for watching!

    • @BoBandits
      @BoBandits Год назад

      @@Amritwalia12 thanks. I was dreaming of SmartTrack

  • @spectrumofreality
    @spectrumofreality Год назад +2

    Toronto also needs an east west line in north part of the city from Scarborough to Etobicoke and to woodbine area and the Airport somewhere in and along the 401. It makes about zero sense not to have the airport serviced by the subway system.

  • @wjkwjk3484
    @wjkwjk3484 Год назад +1

    Metrolink will finish this construction project in 5x5 years?5×7 ??? 🤪🤪🤪🤪

  • @ronaldchow551
    @ronaldchow551 Год назад

    How can you say if it only involves Toronto representing Ontario?
    What about other area around you?
    Toronto, Ontario, Canada ?
    It is only you little house in your border?

    • @TheRandCrews
      @TheRandCrews Год назад +1

      Probably because the terminus station is at Ontario Science Centre in Toronto? Like every TTC Line have a locality area name and number for the line. (1 Yonge-University, 2 Bloor-Danforth, 3 Scarborough, 4 Shepard etc). Better than it being called the Downtown Relief Line where it was based on off.

  • @Popsmoke116
    @Popsmoke116 Год назад +2

    Tim Hortons

  • @konstantinshapiro4968
    @konstantinshapiro4968 Год назад +1

    if crosstown takes 15 years then 15 subway stops will take at least 30 years

  • @RedroomStudios
    @RedroomStudios Год назад

    its useless. it needs to curve up on the west side of the city as well... my thought was Weston Road.

  • @Yuvraj.
    @Yuvraj. Год назад

    Woah bro are we related 😂😂 another Walia in Toronto

  • @stevenrussell1114
    @stevenrussell1114 Год назад +3

    Enjoyed the video until it starting celebrating the gentrification of Moss Park without mentioning how it will displace all of the residents that currently live there, and what their fate will be.

    • @porkypig1772
      @porkypig1772 Год назад +1

      Yeah that is pretty sad, but by the time the line is finished gentrification will have probably been in full swing for a while. Accidentally walked through it at night not too long ago, I hope all the people struggling there make out okay.

    • @Thorscauldron
      @Thorscauldron Год назад +1

      Wonder if AI will end up displacing many financial district jobs by the time project is finally done?

  • @Tee123tee
    @Tee123tee Год назад +1

    What's the point of making another subway line? You already have GO trains and street cars that can reach those destinations.

    • @AuntieVenom2
      @AuntieVenom2 Год назад +5

      Initial idea is to provide relief for the Yonge-University-Spadina line (#1) which is at or over capacity and the Bloor-Danforth line(#2) which is nearing capacity during rush hour...

    • @Tee123tee
      @Tee123tee Год назад

      ​@@AuntieVenom2 True. But can't wait for the number of disruptions and shuttle buses for this to be completed.

    • @AuntieVenom2
      @AuntieVenom2 Год назад

      @@Tee123tee Yea😬. There's that...

    • @edwardmiessner6502
      @edwardmiessner6502 Год назад +2

      One of the reasons is to relieve the subway passenger crush on the platforms at the Bloor-Yonge station particularly during rush hours.

    • @jaygatz4335
      @jaygatz4335 Год назад

      @@edwardmiessner6502 The TTC should revive the "wye" interchange and lower Bay station, to relieve congestion at Bloor/Yonge.

  • @goldenretriever6261
    @goldenretriever6261 Год назад +2

    Do Canadians have Indian accents now?

    • @jjjiljjjj
      @jjjiljjjj Год назад +9

      If you're not First Nations then you're an immigrant. Canada is one of the world's most diverse countries, and in Toronto more than half of the population are born outside of Canada.
      Get with the times old man.

    • @jab2780
      @jab2780 Год назад +3

      NO. Canada was founded by very specific people, just as every "indian" tribe was on the continent. "Indians" fought for land just as every other peoples on the planet. Canada is NOT a nation of immigrants. It was founded by Europeans for Europeans. I'm not against immigration, but I am against this idea Canada, USA, and increasingly, UK and Europe are for everyone and anyone, but outside the West is okay for certain peoples and that land belongs to those peoples. The land under EVERYONES' feet was fought/taken by someone. Europeans founded Canada and USA. Period.

    • @jjjiljjjj
      @jjjiljjjj Год назад +1

      @@jab2780 Canada and USA were built already by the First Nations. The illegal European immigrants came, committed genocide, stole land, pillaged and destroyed villages and towns, committed mass rape, and then distributed the land to other illegal European immigrants. Since then, so much of what was built in Canada, from the railroad to the ports, to the factories, towers, highways and cities were built by immigrants, from European to African, Asian, and Latin American. Even today, the food you eat that's "grown in Canada" is likely done by farm workers from non-European countries. The banks, tech, stores, consumer products, cars, everything made in Canada or imported to Canada is made by people from every corner of the world. I don't know what kind of programming you've been a victim to for you to think "Canada was built by Europeans for Europeans". We're all human, and we all want peace, shelter, belonging, self-fulfillment, progress, and prosperity. Unlike the rest of the world, Canadian society has managed to bring the entire world together and show that we can coexist without any issues, and that our safest and best economically performing regions are our most diverse as proof.

  • @mdtorres_76
    @mdtorres_76 Год назад +1

    To complete in 2031??? I thought it is 2029.

    • @Amritwalia12
      @Amritwalia12  Год назад

      Yes as per metrolinx estimated completion timeline is 2031 🤞

  • @walterkeating6262
    @walterkeating6262 5 месяцев назад

    Choo choo! This thing will rocket at literally tens of kilometers per hour! Hurray, we are so great! Eight years of construction for fifteen kilometer spur off an existing subway! Aren't we just the best, a real world class city?! Meanwhile in China, they have twenty thousand miles of high speed rail, all of it constructed since the year 2000. Of course, they didn't spend the last twenty years invading Iraq, Afghanistan, haven't brought peace and democracy to other countries in the form of military occupation and humanitarian bombing. This pathetic excuse for a transit system is the very best the ruling class of this city is prepared to allow. The best. If this "modern" piece of crap gets built by 2050, it'll be miraculous.

  • @fungjeff1013
    @fungjeff1013 Год назад +1

    2031 😂😂😂

  • @DragonNo1
    @DragonNo1 Год назад +1

    Amrit: thank you for your video! If I may, I'd suggest to make it better, please, avoid the "OK?" after each statement. Or just edit them out. It sounds as if you were extremely anxious or in a rush to finish your video. Thank you again.

    • @Amritwalia12
      @Amritwalia12  Год назад

      Appreciate the feedback, will take care next time :)

    • @jaygatz4335
      @jaygatz4335 Год назад

      @@Amritwalia12 O.K.

  • @pacman3556
    @pacman3556 Год назад +2

    "To be completed in 2031" ahahahahahahahahahahahahahahahahahaha
    When this was first announced in 2019 I believe they said 2029 or 2030 at a cost of $10.9 billion. It is now into 2023 and cost is now at $17 to $19B and we are saying 2031. We haven't even broken ground yet and we are already $7 to $9B over budget and a year behind schedule.
    We will be lucky is we see this before 2100 and only God can guess what the cost will be ahahahahahahahahahahahahahahah