I know of two Otis Gen 2 MRL's 2:1 roping, steel hoist ropes in a 12 story parking garage were updated last year. Originally two sets of hoist ropes were on both sides of the cab with the compensating sheaves above the hoist way, with a compensating sheave on the counterweight. With the update or modernization, the compensating sheaves were relocated to the top of the cab as in this video. Both ends of the hoist ropes are now anchored, to the hitch plate and machine beam. The counterweight retained the compensating sheave.
Very outstanding video. I have to ask the following questions 1.0 can we make an elevator with the capacity 10 to 15 tons capacity for the goods &other materials transporting 2.0 what is the maximum capacity of the elevators constructions for the goods. 3.0 what is the maximum capacity of the elevators for the people? Can we make with 50 persons at one time with the avarage weight of 100 kg in total 5000 kgs which is equivalent 5 tons at one time
Nice information sir ji. Please also tell which company parts are good in lift and that we should use those parts and get them from local lift manufacturers......
I have a Technical question. We are planning to fix lift in the residential apartment. It is 5 floors, Every Level is 10feet ( you know, ideally in india) , now the lift installation man is teling, only we can achieve lift upto 4 levels, Can you guide me.
Sir please make video on introduction of controller components and controller wiring by the help of electrical drawings. I'm waiting for your reply thank you for make video on elevator mechanical electrical and graphics....
Interesting to watch. Sure wish I’d figured out how to install without the benefit of scaffolding, rigging. And oh for a hoistway that you could just put the entrance in...just like that...don’t even plumb them, no cutting of concrete, no chipping etc. like I said, fun to watch, but not the real world installation.
Sir please correct the way travelling cable is going on car top in your animation, the way you have shown it will immediately brake as the car goes in up or down direction.
Totally true about the traveling cable being behind the combination brackets and also I like the short time frame to install this elevator no time was given for erecting scaffold also they roped the car and platform at ground level or if they hoisted the counterweight or the car up
Landing +9 floor appartment 8 person elevators made by Bharat Bijali Olampious automatic centre open door . Install in 2004 working condition want to sell 6 units
This is helpful and great outstanding fabulous.....
Mesej yang jelas, struktur yang jelas, mudah difahami, terima kasih
very good production and installation
Excellent information... Thank you 👍
Wow I would love to see this in an ideal world like how the guide rails are installed in less then a day maybe for a 2 stop
I know right I was watching this like, yea I know 2 days
Great presentation. Thanks
Very good and helpful,
Thank you very much ji
Very interesting; this is the future of the elevator systems.
I'm working in desire innovator. Your work is great
Well done , go ahead .
The video sound is pretty good, beyond my imagination
very informative, thank you
I know of two Otis Gen 2 MRL's 2:1 roping, steel hoist ropes in a 12 story parking garage were updated last year. Originally two sets of hoist ropes were on both sides of the cab with the compensating sheaves above the hoist way, with a compensating sheave on the counterweight. With the update or modernization, the compensating sheaves were relocated to the top of the cab as in this video. Both ends of the hoist ropes are now anchored, to the hitch plate and machine beam. The counterweight retained the compensating sheave.
Awesome 🇧🇷😉👏👏👏👏👏
very nice, can you do a 3 stops, would like to have minimum measurements
Good job
Very outstanding video. I have to ask the following questions
1.0 can we make an elevator with the capacity 10 to 15 tons capacity for the goods &other materials transporting
2.0 what is the maximum capacity of the elevators constructions for the goods.
3.0 what is the maximum capacity of the elevators for the people? Can we
make with 50 persons at one time with the avarage weight of 100 kg in total 5000 kgs which is equivalent 5 tons at one time
Really curious how the traveler works going through the counterweight rails. The traveler should only be 30 times the diameter
if I may ask, what software did you use for this presentation; Elevator 3d with animation? Thanks in advance.
good working bro
Wait, you go from installing rails right to landing doors?
Good job! Do you have a 3D modle?
Very nice
Nice information sir ji. Please also tell which company parts are good in lift and that we should use those parts and get them from local lift manufacturers......
lol @ that travel cable routing.
Thanks for information
Thanks excelent
Was it made with solidworks?
Do you have lif5s for 2 to 3 floors for a bungalow?
I have a Technical question. We are planning to fix lift in the residential apartment. It is 5 floors, Every Level is 10feet ( you know, ideally in india) , now the lift installation man is teling, only we can achieve lift upto 4 levels, Can you guide me.
Sir please make video on introduction of controller components and controller wiring by the help of electrical drawings. I'm waiting for your reply thank you for make video on elevator mechanical electrical and graphics....
Price? From/to? Have you got customer in Germany, France?
Please you have use which software for realize this animation ?
god Job
Oil pots with shoe rollers??
Show
That's a little too fancy for me. I don't need doors. What else you have?
Featuring. Shanghai STEP buttons
Also, it’s strange that why are car buffers were placed on bottom of car, not in the pit hole?
Earthing pitting wiring ??
Dehli me bhi h koi branch? Adrass
👍
Asi es
Price for one floor
Sir hamko drowning chahiye milega
BUEN DIA. ME PUEDE ENVIAR EL PRECIO DE UN ASCENSOR PARA SIETE NIVELES ?
Can you please tell me the cost of elevator
delhi
A MRL (machine room less) elevator machine system.
What number can I call? I'm from the United States. I call the 800 number and its asking if Im over 50.Why?
Me interesa costos tiempos de envío
So easy told only. Do the work.
Please I want learn how to maintain kone elevator online thanks
Basically 1.5 meters per brackey at 1:57 ?
Interesting to watch. Sure wish I’d figured out how to install without the benefit of scaffolding, rigging. And oh for a hoistway that you could just put the entrance in...just like that...don’t even plumb them, no cutting of concrete, no chipping etc. like I said, fun to watch, but not the real world installation.
Sir, It is an animation Video
@@banerjee1953they state time which is not realistic
Sir please correct the way travelling cable is going on car top in your animation, the way you have shown it will immediately brake as the car goes in up or down direction.
should be secured under the car
@@ironmangetter6938 The problem is that travelling cable is coming from back of combination bracket, so its going to stretch in any case.
Totally true about the traveling cable being behind the combination brackets and also I like the short time frame to install this elevator no time was given for erecting scaffold also they roped the car and platform at ground level or if they hoisted the counterweight or the car up
Costly
JADE BEST SARVISE AND SAPORT MATERIAL QULITEY BE TRUST
Sir hindi me video banae please
i want to buy from lima-., peru-., hpw i do-.,
I think this lift is an otis gen 2 because of the buttons,the cables and motor.
You are correct
And the inspection control aswell gives it away. Otis Gen2 in India and Asia are built better then the ones in the UK.
Full cost details send
Landing +9 floor appartment 8 person elevators made by Bharat Bijali Olampious automatic centre open door . Install in 2004 working condition want to sell 6 units
new MRL machin Base
Pls send me a proposal.
Three floors.
5 meters height per floor
If only 5 stop elevator could be installed as quickly as this video...
If there is urge and proper planning, it Lift can be installed likewise Video.
Cost?? G+4 building for 4 Passenger
Plz contacts 9756696189
Cuanto cuesta para una casa de 3 pisos y si pueden enviar a Perú
I am from 🇮🇳 INDIA.
Could not contact JADE Lift
¿Para cuantos niveles es este elevador?
G+4 level MRL lift....
it help me to install in Ethiopia
Otis.elevatar
where is the people in the elevator!!!!!!!!!
quisiera este video en español
На ОТИС жен 2 похож
Contact for purchase?
0:40
Not in the real world , you must be hovering up and down the lift shaft to fit everything.
I am inllto let to
I am working to elevator
MRL lift
Please sent cost
Please mail details : ashish@jadeelevator.com
Plz contacts 9756696189
I have need an elevator installation
I am from Dhaka Bangladesh
Manik AS mail us : ashish@jadeec.in
ashish suthar
Have you support me
Manik AS mail me your contact details we will contact You sir.
Please contact 92514 28614 for business inquiry
Phono
moor Detall Sohme
hhhhhhhhhhhhhhhhhh
Es la copia de un gen 2
Copying Wittur video
Way too many Bolt Nut Joints
I think Welded joints may be more safe than this....
Mesej yang jelas, struktur yang jelas, mudah difahami, terima kasih
The video sound is pretty good, beyond my imagination
👍
I am working to elevator
Kaha se ho u r no
Call me7004665263