20240427JA5105

Поделиться
HTML-код
  • Опубликовано: 27 апр 2024
  • Sewerscope video inspection of the buried sewer lateral from the clean out plug in the basement utility room at the main sewer stack. The sewer lateral was PVC plastic the entire length. There were no solid accumulations and no tree root inteusions. Flow was acceptable the entire length. No further action is necessary.

Комментарии •