Medavakkam - Sozhinganallur Metro Work ! Full Coverage ! Corridor 5

Поделиться
HTML-код
  • Опубликовано: 18 сен 2024
  • Medavakkam Koot road - Sozhinganallur metro work shared in this video.
    This stretch is part of Chennai Metro Phase 2 Corridor 5 of Madhavaram Milk Colony - Sozhinganallur section. It is elevated section. Contractor : HCC - KEC.
    Medavakkam 1, Medavakkam 2, Perumbakkam, Classical Tamil Institute Metro, Elcot Park Metro & Sozhinganallur are the metro stations will be constructed in this stretch.
    Sozhinganallur will be an interchange station as Corridor 3 metro route of Sozhinganallur metro station will be connected to Corridor 5 too. Also flyover for vehicles too will be constructed at Sozhinganallur junction.

Комментарии • 56

  • @jeganstarkhere
    @jeganstarkhere 7 месяцев назад +3

    Single Sholinganallur Metro Station (corridor 3 & 5) would be easily accessible by people. Nice video brother ❤

  • @sairaghu7903
    @sairaghu7903 7 месяцев назад +4

    Thanks as usual for covering metro progress.

  • @suryabala_005
    @suryabala_005 4 месяца назад +1

    சகோ, இத்தகவலை தமிழ்நாடு அரசிடம் தெரிவியுங்கள்
    👇👇👇
    சோழிங்கநல்லூர் பேருந்து நிலையம் மற்றும் இரயில் நிலையம்
    1) சோழிங்கநல்லூரில் (சாலை சந்திப்பிற்கு அருகில்) பேருந்து நிலையம், பணிமனை மற்றும் இரயில் நிலையம் அமைக்க வேண்டும்
    2) புதிய இரயில் பாதை அமைக்க வேண்டும்
    தாம்பரம் முதல் சோழிங்கநல்லூர் வரை
    வழி: கிழக்கு தாம்பரம் - சேலையூர் - இராஜகீழ்ப்பாக்கம் - கௌரிவாக்கம் - செம்பாக்கம் - மேடவாக்கம் - ஜல்லடியம்பேட்டை - எல்காட் செஸ் (ELCOT SEZ) (அக்கரை, கிழக்கு கடற்கரை சாலை நோக்கி)

  • @jokorah181
    @jokorah181 7 месяцев назад +4

    Thanks for the update. Please add a video of the beach to chintadripet route work position also.

  • @vimalstudio9809
    @vimalstudio9809 7 месяцев назад +2

    Thank you for Metro update.

  • @karagis75
    @karagis75 7 месяцев назад +2

    Thanks 🎉

  • @pg4832
    @pg4832 7 месяцев назад +1

    🎉 Metro Work Update Vera Level 🎉

  • @SamuelAbisheik
    @SamuelAbisheik 7 месяцев назад +1

    Was waiting for your metro videos.. bro pls post more frequently

  • @jelumalatube
    @jelumalatube 7 месяцев назад +6

    Something must be done about the illegal posters on pillars and walls. Looks ugly.

    • @thiyagarajans-w7m
      @thiyagarajans-w7m 7 месяцев назад +1

      Not only that . . One lane close to metro pillar is used only as parking .. even more illegal and dangerous

  • @shobharani1670
    @shobharani1670 7 месяцев назад +2

    Tq for update bro

  • @kusumbhagchandani9820
    @kusumbhagchandani9820 6 месяцев назад

    Good work congratulations

  • @astonishingaparajit6785
    @astonishingaparajit6785 7 месяцев назад +2

    Bro approximately when will phase 2 get completed? Heard corridor 4 partly will be operational by 2026 june. Any news on corridor 3 and 5?

    • @ADeepakKhatri
      @ADeepakKhatri 7 месяцев назад

      Between 2026-2028 phase 2 work will be completed. Poonamallee to Porur will be the first stretch. After that Porur to Power House. Corridor 3 elevated stretch from Nehru Nagar to Siruseri will be the first to start. Corridor 5 Madhavaram to Retteri will be the first stretch to start

  • @MrDuraivenkat
    @MrDuraivenkat 7 месяцев назад +3

    Bro beach to Egmore latest work update please.

  • @ajaditya9976
    @ajaditya9976 7 месяцев назад +2

    Phase 2 Corridor 5 la Kolathur, Srinivasa Nagar, Villivakkam railway station and bus terminus metro update pannunga bro??

    • @NambiValavan
      @NambiValavan  7 месяцев назад +1

      Will try

    • @ajaditya9976
      @ajaditya9976 7 месяцев назад +2

      @@NambiValavan enga veetla irundhu just 300meters la dhan Srinivasa Nagar metro station varudhu. Enga veetu vazhiya tracks tunnels ku mark panni irukanga road la. So far enna panranga nu clear ah therla

  • @AakashYuva-g7o
    @AakashYuva-g7o 7 месяцев назад +2

    Bro lighthouse to poonamallee corridor 4 full video podunga bro pls..

  • @suryadce18
    @suryadce18 7 месяцев назад +2

    Bro kuthambakkam bus terminus present update

  • @astonishingaparajit6785
    @astonishingaparajit6785 7 месяцев назад +2

    Bro metro phase 2 approximatea epa complete agum saw corridor 4 will be partly operational around june 2026. Anything on corridor 3 and 5?

    • @NambiValavan
      @NambiValavan  7 месяцев назад +1

      For full fledged completion it will take around 3 to 4 years. Until then partially few stretches will be open gradually based on completion.
      In Corridor 5 i guess Madhavaram Milk Colony - Retteri strech via Madhavaram Bus Stand will be the first target .Corridor 3 OMR road elevated section will be the target is guess.
      Overall first elevated section will be the first target then underground stretch will be open gradually.

    • @sairaghu7903
      @sairaghu7903 7 месяцев назад +1

      Full ah open aganumna 2030

  • @deepak10a11
    @deepak10a11 7 месяцев назад +1

    Bro kilambakkam kitta or guduvancherry kitta metro varuma bro Nan guduvancherry la dhan irukan kilambakkam vandu la irundu romba traffic.unga opinion

    • @NambiValavan
      @NambiValavan  7 месяцев назад

      Definitely Airport to Kilambakkam Bus Stand metro extension via Tambaram will happen soon.
      In future there are chances it might be extended upto Mahindra City via Guduvanchery & Singaperumalkoil

  • @Fansofcrafting
    @Fansofcrafting 7 месяцев назад +2

    Corridor 3 omr side podunga na

  • @ARUNKUMAR-pp7pg
    @ARUNKUMAR-pp7pg 7 месяцев назад +2

    Pls update porur metro

  • @nixaldginesh674
    @nixaldginesh674 7 месяцев назад

    In morning’s and evening’s crossing this area will at least take 30 mins .

  • @elanchezhiyans2042
    @elanchezhiyans2042 7 месяцев назад +2

    Ranipet new bus stand please update

  • @pavithrar6129
    @pavithrar6129 7 месяцев назад

    Madavaram metro is connected to redhills very past

  • @RohithRohith-de6fw
    @RohithRohith-de6fw 7 месяцев назад +1

    Bro in corridor 3 OMR okkiyampet ku net mela u-girder fix panitangaa for more than 1 km ku.....atha video podungaaa

    • @NambiValavan
      @NambiValavan  7 месяцев назад

      Yes I heard about it. Will try

    • @SamuelAbisheik
      @SamuelAbisheik 7 месяцев назад +1

      Okkiyampet ila, after crossing okkiyam maduvu near Kcg college stop girders are placed

  • @mohamedsiraj3900
    @mohamedsiraj3900 7 месяцев назад

    Semmozhi salai is very narrow, will this road be broaden after the metro work completion

  • @user-yourselves47
    @user-yourselves47 7 месяцев назад

    iam-searching-about-phone-problem

  • @TheFiretiger20
    @TheFiretiger20 7 месяцев назад +1

    postor oti kevalama iruku pillars ellam chi

  • @srinivasanr4491
    @srinivasanr4491 6 месяцев назад

    Ugliest place in Chennai is Medavakkam. 😢

  • @Karalmarks_Pvm
    @Karalmarks_Pvm 7 месяцев назад +1

    Good work congratulations