Net Metering on Single Phase Meter - Complete Process & Details
HTML-код
- Опубликовано: 8 фев 2025
- @netmetering @singlephasenetmetering @greenmeter @lesco @nepra @aedb @bestsolarcompany @sunsolar @smartsolar @ongrid @hybrid @residentialsolar @solarsystem @solarlahore @
This video is containing all the required information for a solar installer/ consumer desirous of getting a net metering connection who is having a single phase meter at his residence/ commercial premises.
Answered Your All Questions Here:
ruclips.net/video/RyREUTC-Y5A/видео.html
Ap ki service Multan main hy
Ji main 10 kw lahwana cha raha hoo
Itni detail say kisi nay bhi nai samjhaya RUclips pay thanks
Good communication well explained
Very informative video.
میں واپڈا ملازم ہوں اور جناب آپ کی تمام باتیں درست ہیں ❤
میرا کزن واپڈا میں ہے ہیڈ آفس
Very nice sir , i think clear and compleet information
Very informative vdo thanks
Masha Allah good effort
Very informative video jazaak ALLAH
Thank you. Aap nay single face ka concept acha bataya hai. Es se solor installer kay farad se bachnaye myn madad milay ge.
ماشاء اللہ بہت خوب جناب اللہ تعالیٰ آپ کو لمبی برکت والی زندگی عطا فرمائے آمین ثم آمین
very well informed video. Thank you
Very welcome
Thanks for positive and good information.
Very good way of communication!
You are welcome
🌴"رب ذوالجلال"ا
🌹 آپ کو کامیاب کریں تاحیات
تندرست، سلامت
اور شادوآباد رکهے.🌴
🌹آمين يارب العالمين🌹
The most beautiful comment /Dua I received on social media. Jazakallah Khair
Thanks for sharing your knowledge ❤
Thanks brother, aap ne boht sada our clearly informed kiya he, good ❤
Nice
Good information
Jazzak Allah
Very well briefing
Good information for net metering
Thanks for your comments
great information 👍🏻👍🏻👍🏻
Thanks
Very Good Information
Good job
excellent
Very simple way to cumunicate. ❤
SUNSOLAR is thankful for your feedback
Mashaa Allah. ❤
Three phase green meter par 3 phase Inverter lagana zaroor hai ya single phase hybrid lagaya ja sakta hai qanooni tor par?
جزاک اللّٰه شکریہ
جزاک اللہ
آپ کا شکریہ
I have 3 single phase meters installed at my home. If I have to increase load like said in video, will they take these meters and install only green meter? What will be the process then?
Sir agr agy ghr ka load single phase rkh dain to ,I means agr inverter single phase ho ga hybrid , us surat mein to green meter sy agy 2 wires hi used hon gi
Sir agr wapda single phase ho matlab agr tower pr 2 wires ho tu kya net metring ho sakti hy
Best Video
Thanks
❤
Sir g ager service lines srif 3 hon 1-ve and two live tub kiya kiya gy plz answer it throughly thanks
Does it take 3 months to start export?
Thank you sirr
Sir
I am just curious I ask beyond solar for solar system 10Kv complete package they are asking Rs.1,20,000
For green meter or net metering
And Rs.11,40,000
In Karachi
Is it best deal ?
If there is 5kw load 3phase .
7.5kw solar installed for netmetering .
We can install 7.5kw solar plate exact .
Or its vary
Inverter kis company k allowed han? Mery pass deluxe volPeo 3.2 ha
Net metering k lye 3 phase invertor ka hina zarori.ha
Assalm o elikum sir
Kia ap log Karachi main installation karsaktay Hain 6kw solar with net metering if yes your charges please
Nice & informative. In which city your head office sir?
Zabardast video hai, shukria guide karnay k liye. Please yeh bhi bata den k iskay liye inverter ka 3 three phase hona zaruri hai ya single phase inferior per bhi bidirectional meter lag sakta hai.
It varies from DISCO to DISCO. FESCO does not allow net metering on Single Phase Inverters; All other discos in Punjab allow net metering on single phase inverters. KESC also allows net metering on 3-Phase inverter only.
@SUNSOLAR thank you very much for replying
@@sunsolarllp Fesco also doesn't allow net metering on hybrid inverters.
Bi directional meter can be installed on single phase inverter. KE (Karachi Electric) and FESCO (Faisalabad) require 3 phase inverter
@@ZoxtorPK YES, FESCO doesn't allow net metering on Hybrid Inverters
what if our inverter is singal phase?
I want to know too!
Format kya ho ga file ka or kitny vala stamp paper lgy gq
Please inform people's through any source that there is a solar installation Co. name Sunsolar.
Assalamualaikum, very informative video, I'll follow the procedure in shaa Allah, there are different videos about earthing and I am confused, if possible any information about that when you are free, jzak Allah khaira.
We will try to upload informative videos on other related subject in near future ان شاءاللہ
how much total cost on net metering , cable etc
Great brother you gave me a very positive answer of a question what other people asked me to replace single to three phase. If sunsolar can provide services in peshawar let me know it's mob no.
03-111-666-677
Inverter bhi 3 phase hona chahye ya nitrox 8kw single phase pr bhi net metering hosakti hai
I have the same question….
Can you help me get a green meter in Hyderabad.
sir total cost kinti nhi aye gaye net metering pa?
Is it mandatory to process green meter application through aedb approved comany? I have installed my solar setup 6kw by myself. With complete protection and earth. Its working fine. Now I have to install green meter. This video helped me but why its mandatory to process green meter request through aedb approved company??
F
Hyderabad may koi office hay ap ka
Net metering ke liye kam se kam kitna kw ka system hona chahiye?
5kW
Is NTN necessary for Net Metering?
Only CNIC required for individual
kya wapda sy 8 kilowaat k load sanction krwa kr 5 kw ka solar systam lgwaya ja skta ha ??
Yes, you may install any capacity solar system on 8 kW sanctioned load starting from 5 kW Upto 12 kW.
@@sunsolarllp 5 kw ka tarif or 8 kw watt ka tarif same he hota ha ya wo be alg alg hota ha Bill k andr dono k unit k rate same hota ha ya alg alg ??
@@starseven7792 same tariff for 5 kW and 8 kW
Sr rahim yar khan mean ho gaa hamea inverx veron 3.2 inverter hy is pay ho Jaye gaa
5kW minimum inverter required
سر میرا بیکری کا کارخانہ ہے۔۔وہاں 6kw کا سیٹ اپ لگا ہوا ہے۔۔
میری مشینوں کی موٹریں سنگل فیز والی لگی ہوئی ہیں۔۔کیا نیٹ میٹرنگ کروا کر میرے پاس سنگل فیز والی بجلی آئے گی یا تھری فیز والی۔۔۔
کیونکہ ہماری جو سنگل فیز والی موٹر ہوتی ہے وہ تھری فیز پر نہیں چلتی
Single phase meter pr net metering krwatay hain to peak hours ka unit increase hoga ?
Uncle ko bhe nahi pata
السلام علیکم
بھائی میں نے نیٹ میٹرنگ کروانی ہے کیا اپ کروا دیں گے
I hv a question. on Single phase Solar invertor can I apply net metering connection.
Yes, you can apply
Salam o Alaikum brother mere pass split phase SRNE ka 10kw ka inverter Hai Kaya iske sath bhi net metering ho sakti Hai?
Don’t know about this inverter but all 10 kW inverters imported into pakistan have net metering generally
Janab Veyron 3.2 or 4 pannel lgy hain 540 k es system pr net metering ho jaey gi Rawalpindi me kion k Etna load nai hai hmary Ghar ka or kitna kharcha ho jaey ga
Normally net metering enabled inverters are 5 kW and above.
@@sunsolarllp But Sir, my Nitrox 3 kw, sp 24v inverter is a hybrid inverter with net metering enabled.
@@kookicck As per regulations, net metering is available for minimum 5 kW system. Please contact your vendor/AEDB approved company, they will advise you solution
@@sunsolarllp Can your rep at Islamabad visit me for getting a better understanding of the situation and suggest a way forward. Do send their contact numbers. Thanks.
@@kookicck Yes sure
0310-7771838
Sir kindly mujhe bataye humara single phase meter hai to Kia humara greek meter lag Jaye ga
Yes
لگ جائے گا
Net meter ko chlany k liy 3no fhase chlana zrori hen k ni. Mtlb ak e phase se import or export ho skti hy k ni. Kindly guide
All 3 passes should be in place and operational. If any phase is missing, net metering will not work. Even the 3-phase inverter will go to "fault" position and solar system will not remain operational.
جس سایڈ پر واپڈا کے پول پے سنگل فیس ہو پول پے دو تاریں موجود وہاں پے گرین میٹر انسٹال ہو گا یا نہیں ۔ اس بات کو کنفریں کریں۔ ۔
If wapda pole have only one phase..??.
Availability of 3 phase on wapda pole is their responsibility and these are always available
1 got my net metering work done through a solar company...pehlay single phase laga tha...but ab jo green meter laga ha uskay 2 terminal khali hain...mean 6 out of 8 terminals ma wire lagi ha...is it alright ???
Ya tou single phase wala connection nahi ha ?
Meter is always 3 phase. There is no problem
AoA, mohtrim aap sahu keh rhy hongy, but reality yeh hy ky as per NEPRA instructions Jb Change of Load 5Kw ya iss sy uper hoga tu Tariff A1(01) sy A1(3 TOD) pr bh shift hoga jis k lye wapda/ disco demand notice he 2 issue krti hy 1 security deposit jama hoga @ Rs 620 per KW. 2nd demand notice Capital cost (including TOD meter charges) ka jama krwana hota hy jo area wise (urban/rural/town) vary krta hy. To jab demand notice me meter charges shamil hyn tu pichy bacha kiya?
آپ کی ساری بات بالکل صحیح ہے صرف تھری فیز ریگولر میٹر کا ڈیمانڈ نوٹ نہیں لینا ۔
Our company has installed numerous meters and regular meter charges have not been paid in any case. We'll try to make videos of our client's experiences in this regard from various DISCOS country wide.
Mohtrm leny wali baat he nhi hy. 2 system generated demand notice issue he iss lye hoty hyn. Aur jama krwany ki timeline 1week. Aur jab iss pr behs ki jay tu NEPRA ordinance/ consumer service manual ka reference dya jta hy
آپ جیسے پڑھے لکھے لوگ بہت کم ھیں یہاں جن لوگوں نے کمپنیاں بناٸ ھیں انہیں تو خود پتہ نہیں ھوتا کہ کیا کرنا ھے
very good and well explained video 👍. How we contact you for solar system installation
03-111-666-677
@@sunsolarllp Inverex Veryon 3.2kw lgaa hy mere paas..Inverter m bhi option hy..kia m kr skta hn?
@@moaz5652 yes
Mery single phase ka load 3 hy aor tarif A-1a(01) hy. Kia mai 5 kva ka lgwa skta isi single phase pe net metering. Secondly kia agricultural tube well k 3 phase pe net metering ho skti thanks
Yes, you can install 5kW net metering system. You have to do change of load first if all as per guidelines given in video.
For your second question, yes you may obtain net metering connection in your agricultural meter.
@@sunsolarllp many thanks for your prompt reply sir . Ap ne video me bola hy k load agr 1 ya 2 ho tb us ko 5 tk increase krna hy . Mery bill k upper load 3 hy jo k 2 se ziada hy
@@sunsolarllp kia non custom solar plates jin ki back side pe koi barcode ya sticker nai hota un pe net metering ka license mil hata
@@yasirsaleem9143 There is no such category of "non custom" solar plates because every solar plates imported into Pakistan is non custom. There are no duties, taxes and custom duties on solar panels. However, net metering license may be obtained on all solar panels.
@@yasirsaleem9143 چونکہ بالعموم سنگل فیز میٹر کا لوڈ ایک یا دو کلو واٹ ہوتا ہے اس لئے ایسا کہہ دیا گیا باقی جو بھی لوڈ ہو اصل چیز billing tariff ہے اور tariff کو تھری فیز کروانے کے لئے لوڈ کم از کم 5 کلو واٹ کروانا پڑتا ہے
آپ کے سوال کا شکریہ
Salam sir 3kw per allowed hi
No net metering allowed in less than 5 kW
Salam sir g agar single phase py haam net metering krty hy to meter ky input ko 3phase supply denye hy out put py single phase agr lagye to kaam kry gaa
Yes
السلام علیکم۔۔۔۔۔۔محترم کیا پول سے ups تک کی net metering کی ڈایا گرام مل سکتی ہے۔یا آپ کوئی وڈیو میٹر انسٹال کرنے کی بتا سکتے ہیں۔۔۔
We will make it shortly
سر میرا سنگل فیز ہے جب کے میں نے انگرڈ انورٹر لینا ہے زیرو ایکسپورٹ والا ۔۔گرین میٹر ابھی نہیں لگوا سکتا ۔۔کیا گرین کے بغیر میرے گھر کا لوڈ چلتا رہے گا ۔۔
میرے گھر میں سنگل فیز انورٹر لگا ہوا ہے، کیا وہ بھی تبدیل کرنا ہوگا۔ کسی تھری فیز انورٹر سے۔
اگر آپ فیسکو یا کے الیکٹرک میں نہیں ہیں تو سنگل فیز انورٹر پر نیٹ میٹرنگ ہو جائے گی
@@sunsolarllp بہترین۔ میرا انورٹر 3 کلو واٹ کا Nitrox Hybrid ہے۔ کیا میں لوڈ بڑھانے والا سلسلہ شروع کر دوں۔
Labore ma bhi single phase pr net metering ni ho rhi@@sunsolarllp
Net Metering k liya hm SE rbta kren
اچھا جی
@@sunsolarllp yes sir
Sir Karachi k leye bataye Please
For Karachi, 3-Phase inverter is must
Assalamu alaikum
Tere naam per bhi koi metar nahi hai
Agar single phase metar lagwane se behtar hai ke mein 3 phase metre lagwa Lun
Kya yah behtar rahega
اگر آپ نیا میٹر لگوانے جا رہے ہیں تو تھری فیز میٹر ہی لگوائین تا کہ نیٹ میٹرنگ میں آسانی رہے
2024 mein single phase py nhi ho gaa kindly update kryn logon ko yeah b
Brother yeh 1 sal Purani video ha
Now a days its legal or not
This is the proper way which is very much legal
Its not allowed in Karachi
sir apki location
Karachi k lye Single meter pr nhi hoti
For KE and FESCO, three phase inverter is essential
Sir aap link de sakty hain jis web se change of load karna hai our uska tarika
Your DISCO? City?
AoA
جب تین فیس کی تار لگانی ہے تو پھر میٹر تین فیز ہو جاے گا سنگل فیز نییں رہے گا سنگل فیز پر میٹرنگ نی ہوگی
Salam sir ap ka mobile number aur Kya 3kw per inverx nitrox 3kw netmeetring how sakti hi