Whistler Blackcomb, BC: Big Red Express (1997-2022)

Поделиться
HTML-код
  • Опубликовано: 21 дек 2024

Комментарии • 9

  • @idahoskilifts4242
    @idahoskilifts4242 2 года назад

    I never really understood why there's a separate tower at 1:25.

    • @TwinSkiingLiftsRides
      @TwinSkiingLiftsRides  2 года назад

      There is a cliff that the downhill side needs to pass over, but the uphill side doesn’t. That tower was built to give the downhill side enough height to pass over the cliff.

    • @idahoskilifts4242
      @idahoskilifts4242 2 года назад

      @@TwinSkiingLiftsRides Oh that makes sense!

  • @Sterlingclub24
    @Sterlingclub24 8 месяцев назад

    This lift replaced a yan high speed quad in 1997 known as greenline

    • @TwinSkiingLiftsRides
      @TwinSkiingLiftsRides  8 месяцев назад

      Greenline was where the current Emerald 6 runs. This one replaced Redline, and this is now a six-person chairlift.

    • @Sterlingclub24
      @Sterlingclub24 8 месяцев назад

      @@TwinSkiingLiftsRidesno I checked lift blog it says emerald replaced redline but that’s what I remember from lift blog but who knows we may never know unless if we we’re there in person

    • @TwinSkiingLiftsRides
      @TwinSkiingLiftsRides  8 месяцев назад

      @@Sterlingclub24 I checked some old trail maps on Skimap.

    • @Sterlingclub24
      @Sterlingclub24 8 месяцев назад

      @@TwinSkiingLiftsRidesoh ok I guess liftblog is liftWRONG😂😂😂

  • @larstomars8745
    @larstomars8745 2 года назад +1

    9:41