कुछ contractor with material काम में आप के साथ ऐसे game खेलते हैं |foolish suggestion by Contractor

Поделиться
HTML-код
  • Опубликовано: 1 окт 2024
  • #civilengineering #buildingconstructionmaterial #constructiontips
    Hello दोस्तों मेरे नाम अमन सिंह है ,मैं एक आर्किटेक्ट हूँ। यदि आप को किसी भी तरह का Architectural work या interior work करना है तो मुझे इस NO- 8595033590 पर Whatsapp या Call भी कर सकते हैं..
    Hello friends, my name is Aman Singh, I am an architect. If you want to do any kind of architectural work or interior work, you can also Whatsapp or call me on this NO- 8595033590

Комментарии • 9

  • @sumilonghosh5226
    @sumilonghosh5226 3 дня назад

    Are you a civil engineer? Why minimum dia of bar in foundation should be 12 mm.? Please justify all yor comments in terms of BIS 456 2000. Contractor should strictly follow the reinforcement drawing prepare ed by civil engineer. All stages are to be inspected by a civil engineer.

  • @SRICHARANSANAPATHI
    @SRICHARANSANAPATHI 2 месяца назад

    Sir can we change our elevation our slab is ready but it's just a normal slab ..can we make elevations which require additional extension of already prepared slab ??? Please answer my question I want to talk to you please give me your contact details....

  • @Invincible1332
    @Invincible1332 6 месяцев назад

    Wrong practices highlighted 👍 keep it up

  • @loksapps5455
    @loksapps5455 6 месяцев назад

    Sir eccentric footing par video banaye

  • @feedmyego8874
    @feedmyego8874 4 месяца назад

    hi sir, what is the procedure to make BOX design in front elevation if block work or slab is not extended during civil work?

  • @DrAbhilashSharma
    @DrAbhilashSharma 6 месяцев назад

    Kya sunken slab banwani chahiye?

  • @Shriniwas333
    @Shriniwas333 6 месяцев назад

    hame PCC nahi malum, PCC yani samosa😊👍👌

  • @gauravbhardwaj7186
    @gauravbhardwaj7186 7 месяцев назад

    Plaster mein ratio ka rakhyein

  • @hellboy6167
    @hellboy6167 7 месяцев назад

    Nicely explained