Technip - Marathon Oil Westbrae Extension

Поделиться
HTML-код
  • Опубликовано: 22 окт 2015
  • AVC Immedia worked closely with Technip to create bespoke video and animation content for the Marathon Oil, West Brae Subsea Well Extension Project.
    The video showcases the side-track drilling at the West Brae Subsea Well followed by drilling and completion of a new well at the West Brae manifold. With minimal space for a new well at West Brae, installation of a new subsea manifold was required to improve long-term reliability and provide opportunity to debottleneck, whilst optimising production.
  • КиноКино

Комментарии • 2

  • @nickcresswell249
    @nickcresswell249 4 года назад +4

    I watched this with some pride having been the EPC contractor's Project Manger for the original West Brae development back in 1996!

  • @pemudaakhirzaman999
    @pemudaakhirzaman999 4 года назад

    some unsafety act... he did'nt use the gloves when working