CONCRETE ROOF PLASTERING | STEP BY STEP | RCC സ്ലാബിനു മുകളിലെ പ്ലാസ്റ്ററിങ് |

Поделиться
HTML-код
  • Опубликовано: 16 окт 2024
  • BY
    WAYMOR CONSTRUCTIONS 🏡👷🏻‍♂️
    🧱More Ways To Build Your Dreams🧱
    📞 : 9562512391, 7012651860, 7012916124
    ✉️ : waymorconstructions@gmail.com
    🌐 : waymorconstruc...
    📍: RH building, Vellangallur
    Plan | Elevation | Estimation | 3D Designs | Renovation | Building Construction | Supervision | Panchayath Permission | Interior
    Concrete roof plastering :-
    ¶ Clean the surface
    ¶ Chipping
    ¶ Transportation of materials
    ¶ Mix ratio = 1:5 cement:Plasteringsand
    ¶ add required amount of water 💦
    ¶ add acrylic compound Dr.Fixit pidiproof LW+, 101 (200 ml for each bag)
    ¶ Marking Levels
    ¶ Flattening and smoothing plastering in required level
    ¶ RCC slabs are applied with cement mortar so that no water stagnates on the roof top after a shower.
    RCC slabs at times may leak slightly due to oversight or bad workmanship or a defective batch of concrete. If such is the case try to arrest the leakage by grouting cement slurry at those spots. Applying a coat of cement mortar will tackle the leaks but grouting is preferable.

Комментарии • 18