New sewage drains
HTML-код
- Опубликовано: 27 сен 2024
- The final part of the groundworks is to move and establish new drains and sewage lines for the extension. This is a critical part of the work for a number of reasons - we need to have working toilets and grey-water removal, but we also needed a build-over agreement with Thames Water to be able to move the drains into a suitable position.
This build over agreement was slightly different from the norm, because the location of the drains was not exactly known, and because of that, neither they, nor us were sure where they needed to move to.
As a result, I was speaking with Thames during the dig/moving process to assess what was acceptable, regarding the type of materials used (plastic vs. clay) and established what they wanted me to do in order to sign off the build over agreement.
I have now measured and mapped out the location of the new pipework, and ensured the manhole has clear rodding access and is easily accessible from the side of the house.
The ground-workers finished running all the 4 inch pipes and got the ground prepared for the bricklayers to start.
Here is the kit I use:
Bosch Professional Combi Drill and Impact Driver with Two 18V 4.0 Ah Batteries amzn.to/2owE0mK
Bosch Professional 18V Cordless Circular Saw with 2 x 18 V 5.0 Ah Batteries
amzn.to/2IGTwDv
Bosch Professional 18V Cordless Multi-Cutter with 2 x 18 V 5 Ah Batteries and 16 Accessories
amzn.to/2AYPOAM
Bosch Professional 18V Cordless Jigsaw with 2 x 18 V 5.0 Ah Batteries
amzn.to/2IDgTxA
Bosch Professional GAS 35 M AFC Wet/Dry Extractor
amzn.to/2p5iPbj
Bosch Professional GMF 1600 CE Corded 240V Multi-Function Router
amzn.to/35komvb
Occidental Leather 5089 LG Seven Bag Framer Tool Belt
amzn.to/2OAjlc4
Occidental Leather 5355 Stronghold Comfort Package
amzn.to/2VuRF9U
Hikoki Nail Gun
rover.ebay.com...
Bosch Table Saw & leg stand
rover.ebay.com...
Damp Proof Membrane
rover.ebay.com...
18mm Chipboard Flooring
rover.ebay.com...