I hope there is a structural engineer here who can verify it this practice of half beam pouring is safe. I heard one engineer who said that it is ok to cut pouring along the centroid of the beam cross section because transverse stress is zero in that location. He added, the compression area is calculated above the centroid area and the concrete below the centroid is assumed useless (if we take the midspan) as it is under tension and the bottom steel takes care of the stress.
CE student here ✋ coreect me if i'm wrong. pag ganyan ang methodology ng concrete casting on beam mababago ang design analysis ng beam. Example ang depth ng beam mo is 400mm, then ang design ng SE sa beam is DRB, pag binuhosan mo ang 300mm lang at iniwan mo ang 100mm, hindi na siya DRB, magiging SRB na design niyan. At mag babago din ang effective depth mo, imbes from centroid of bottom bar to the outermost fiber layer ng beam, hindi na. Kasi hanggang 300mm lang ang monolithic na buhos mo.
yes. concerning ang mga gumagawa ng ganyang method sa pag buhos. Unless naka design talaga na two part ang buhos nya at masigurado nya na yung bonding ng 1st at 2nd pouring eh maganda. mag aaway talaga kayo ng structural engr. pag ganyan ang methodology at hindi na consider sa design.
I hope there is a structural engineer here who can verify it this practice of half beam pouring is safe. I heard one engineer who said that it is ok to cut pouring along the centroid of the beam cross section because transverse stress is zero in that location. He added, the compression area is calculated above the centroid area and the concrete below the centroid is assumed useless (if we take the midspan) as it is under tension and the bottom steel takes care of the stress.
@@buildpodd369 pinaka sagot ata dyan sa effective depth of the beam. yung design kasi dyan is kunwari ay 300mm ang depth and it is doubly reinforced beam. ngayon sa construction method ni kuya, the depth was decreased by 50mm then the design strength of the beam will also decrease. tsaka magiging singly reinforced beam na lng yan.
Eto yung hinahanap ko n explanation sa pag slab .. thank you .. new subscriber here sir.. pashout out na rin sir 😊. Sir next video mo nga yung pag lalagay ng dowels sa ftb , column and beam at pano hulugan ang porma ng column ..
Ask ko lang po pano kung may existing cemented beam na tapos ipa slab pede ba yung barenahan yung slab then lagyan ng injectables hilti chemical para ma rebar ang gagawing slab?
Sir very informative po ung video ninyo.. tanong ko lng po ano po ba ang tamang kapal ng steel deck sa 3m na pagitan ng beam po?ok lng po ba ung 0.8? Slamat po sa pagsagot at Godbless po.
Sir pwede po ba gawaan n ng beam ang buong area pero 3/4 lng ng height ng beam ang bubuhusan tapos after a year na ulet ang kasunod isasabay n ang slab.?.ideal po ba pinturahan nlng ung natirang bakal sa beam..wla po ksi kkyanan mgmonolitic eh..slamat po
Parang napanood ko na ito ginawan ng correction at reaction video ng isang Vloger na Engr. Hahaha sinabi mo pa naman sa video mo na matino na tutorial 😁
Hello po ask ko lang po kung ano pong ginagawa sa butas na nakaawang sa pinacut ng steel deck yung sa mismong pinagpatungan sa ibabaw ng biga, hindi po ba lulusot ang halo ng semento doon pagnagbuhos o may ginagawa po tungkol don?
Sir ayus lng po b nlgay n bakal? ng ptau ako ng smpleng bhay 12mm bakal n gnmit ng 6 n column? 9meters lenght x 4.5mtres widht ang floor area ng bhay 40sqm. My tie beam bakal dn sa ilalim 12mm din paikot my abang second floor? Ano po n basic taas ng second floor? Tnx very usefull ung mga blogs mo sir..
Balak ko dn po mag partial pour lang ng beam, pati slab. Say may dlwang beam or slab na magkasunod, ndi ko mabubuhusan ng sabay. Pano ko ggwin ung formworks nun? Sa vertical level madali mag partial pouring, pero sideways pano ko gagawin?
Kulang din kasi pang formworks ko. Say meron akong multiple span ng beams. Eh ang balak ko kasi 1 by 1 kong buhusan. So like sa end ng beams kelangan ko saraduhan. Kso di ko lam kung pano
Kung nagtitipid po kayo ng husto, puede naman po mag sideways partial pouring, wag nyo na lang po saraduhan ung dulo, Pag nagbuhos makesure hindi malabnaw at ang ending mo sa dulo ay diagonal mas malapad ung ilalin sa ibabaw, _______ \ \ ___________\ Ganyan po para mas malawag ang surface area ng kapit ng cold joint, makesure lang po buhusan ng binder (grout) bago dugtungan ng susunod na buhos
sir pag binuhusan ng buo yung biga at hindi partial beam. pero gagamit ng steel deck. okay lang po ba yun? parang ipapatong lang yung steel deck sa beam at iwewelding nalang sya sa may bakal. salamat sir.
very informative. ask ko lang engr. pwede ba isagad yung baba ng mga steel forms sa steel deck or may mababaw na grove na klase ng steel deck para hindi makapal ang semento. thanks.
Dapat po bago mag Steel deck may at least 1 inch na concrete cover, bago mag steel matting (rebar), Then may minimum po sa slab na 5 inches or 12.5 cm thick pero puede nyo na isama ung mula sa baba ng steel deck sa sulat na 5 inches, ang matitipid na part nyo po sa semento ay yung Grove ng steel deck halos 2 inches rin po yong mababawas sa 5 inches everytime na aakyat yung grove
Yes boss, laging dun sa maigsing pagitan para mas kayanin ng steel decking, example: ang floor is 4m x 6m, ang size lengthwise ng steeldecking ay anim na 4meters ang haba
@@newjourney2027 slmat po engr. Sir sna magkaroon kayo nang video kng ano gagawin kng isang side nang house ko Na may biga ay biga rin nang kapitbahay ko. Kng pano malalagyan nang steel deck. May nankapatong n kasing 5 layers n hollow blocks salamt sir
sir pwede po ba pagkabuhos sa mga biga partially, at ilatag ang mga steeldeck ay gumamit ng 2 inch concrete nail para maikabit sa mga biga at hindi gumalaw ang mga steeldeck saka lalatagan ng steel matting, wala po kasi kuryente sa area
papaano po yung sa part ng mataas, kasi po diba may ribs ang steel deck, paano po yun bukas na parte ng steel deck pagbinuhusan na? hindi po ba tutulo ang halo doon?
@JOSMAR define muna natin ano ung simpleng bahay, Based sa sinabi mo, 40m² GF then iiwanan mong nakabuka ung rebar mo sa taas para sa 2F, Kung MARINE PLYWOOD naman ang 2F mo, Ubra uang plan mo na 12mm lang ang poste, Kung SLAB ang 2F na target mo I suggest magdagdag ka na lang ng konting pera P100.00 per bakal magiging 16mm na ung 4 rebar ng poste mo from 12mm, then lagyan mo ng 2x12mm sa pagitan O O o o O O Dun naman sa tanong mo na ano ang standard height ng 2F: Mula sa Finished Floor line ng GF to Finished Floor line ng 2F is 10 Feet, Mula sa Finished GF papuntang kisame ng GF is 9 Feet, So mula kisame ng GF papuntang Finished floor ng 2F is 1 Foot (30cm) nandun mo na pagkakasyahin lahat ng electrical at plumbing
Sir gud eve npakaganda ng inyong explanation marami ako natutunan may tanong lg ako sir pag 3 storeys ung patayo qng bahay ilang bakal gagamit ko at anong size ng bakal.salamat po.god bless!!
My first time to use steel deck. Just like sa video nakapatong yung steel deck sa beam. Paano matatakpan yung dulo opening ng stee deckl para hindi doon tatagas ang buhos? Your reply will be greatly appreciated. Thanks
Sir,good day po!pahabol na question lang po.advisable po ba na hindi kailangang haluan ng water proofing mixture ang buhos na concrete sa steel deck?may nakita po kasi akong steel deck na kinalawang sa ilalim na gilid na part sir.Maraming Salamat po sa tugon Sir!God Bless po!
Pag GF 12mm 25cm x 25cm both ways Pag 2nd Floor 12mm 20cm x 20cm both ways Yung GF puede mo tipirin like gawin mong 10mm 30cm x 30cm both ways pero siguraduhin mong sobrang ganda ng papatungan or natamper/siksik mo ng maige ung lupa, Yung 2F I don't suggest to go below standard
Nasa gitna ng beams na pahiga ang tamang pagputol ng buhos kong kailangan pero mahirap na linisin ang mga concreto sa bakal ay kailangan din mag tanggal o mag sinsil ng mga plastic na concreto sa lahat na lumang concreto para kakapit ang bagong buhos...
Kung ang ibig sabihin nyo po ay PARTIAL BEAM yan po mismo ung ginawa namin nagbuhos muna ng ⅔ ng biga then pinatong ung steel matting saka winelding, Kung ang tinutukoy nyo po ay buuhin lahat ng biga/beam bago magpatong ng steel Matting puede naman po pero bihira ang gumagawa non dahil: 1.) Need mo pa maglagay ng dowels para sa kakapitan ng steel matting kaya mas magastos sa bakal 2.) Mas magastos sa semento dahil hindi nyo binaon ung slab sa beam
New subscriber po ako.. ask ko po Kung Pano ko ilalatag ang steel deck SA bahay ko na buo na ang biga,,bale paikot palang po Yung biga at wala pang biga SA gitna
Hindi kakapit ang bagong concreto sa lumang semento na kumakapit sa bakal kaya walang silbi ang top bars at mga anelyo. Kapag niyanig ng lindol ay mag crack ang beams.. Dapat linisin muna ang naka kapit na lumang semento sa bakal at mag sinsil sa mga lumang concreto para kakapit ang bagong semento...
Pwede pala hatiin ang buhos nang beam? Is this legit.. Mas importante buhos lahat ang beam if possible tsaka nalang ang slab ipatong mismk sa beam.. Curing mo nga malimali.. Its 14,21,28...
Sa tantya ko sir nasa 70sqm po yan, then sa estimate ko ung slab and beam labor materyals is approximately 120K, Pero laya po mura yan dahil wala po akong foreman at skilled puro labor lang tapos tinuturuan ko lang sila ng diskarte para eventually maging skilled na sila
New sub po, thanks sa video. Engr magpapatayo po kasi ako ng bahay 6x7 at umorder na ako ng web deck 1mm na 12pcs na 7m ang haba. Engr pwede po ba nilang ilatag yung 7m na haba at ipatong nlng sa beam na wala na pong putol?Kumbaga 7m straight nalang, pero sa tapat ng cross beam sa gitna magbubutas sila sa steel deck ng lulusutan ng dowel. Sana po mapansin niyo.
Puede po, yan po ang pinakapraktikal na gawin 😊👍 Binasa ko po ng maige, muntik na ko tumangi kase hinihintay ko ung dowels, Pero sa dulo ng message nyo nandun ung paglusot ng dowels sa cross beam kaya OK po yan 👍👍👍
Its not advisable na mag wweld ka sa main bars mo, dapat nag lagay ka dowels sa beam mo. Dapat maglagay ka extra bars to compensate ung na loss dahil sa putol na buhos at the same time need i cheap at linisin muna
Sir mtnong ko lng po kpag po b 30x30 cm ang beam at illbas ang abang na bakal ng 10cm d ble 20cm nlng po ang beam nya sa ilalim?ok.lng po b gnun para sa slab na bahay?
Yes po yan po mismo ginawa ko, so lumalabas pag nag buhis ka ng flooring at susundin mo ung standard magiging 32-35cm na ang taas ng beam kasama na don ang slab
Ang gagawin bhay ay 2floor. Slab buhos pati bubong nya ay buhos rin..ang sukat ng bhay 4meter. sa likod nman 8meter.rektangle.6pcs na poste? Ask kulang.pwde ba un 12mm 4pcs 10m 2pcs pang poste nya?? At pwde rin ba yan sa beam?
hi sir ask ko lang if paano ikabit and steel deck ikabit pag may asbuild na beam? like normal gi roof tapos may abang kasi na pang 3rd floor biglang gusto namin roof deck nalng di na 3rd floor. paano ma kakapit yun?
Obserbasyon lang, nabuhusan na ang beam pero naiwan yong top bars, parang kalahati na lang ang tibay ng beam. Walang bonding sa steel at concrete. Maganda sana monolithic beam at slab sabay ang buhos. Kung beam lang unahin dahil sa budget, maglagay ng dowel para sa slab at buhosan ang tamang kapal ng beam.
Kung saan mo pinutol ang pagbuhos sa biga ay doon malakas ang tinatawag na shear stress. This is not advisable and not good. Please consult a legit structural engineer para masiguro ang safety ng building at buhay ng mga occupants. Have a nice day everyone.
Good tutorial lods. Matututo lods ung mga baguhan sayo.. Good luck. Lods.. New friend. Lods..
Eto yung engr. Na hindi madamot sa knowledge godbless sir thank you
Maraming salamat rin po, sana marami pa tayong matulungan 😊
@@newjourney2027 sir pano po pala lalagyan ng chb yung bago mag beam kung naunang magbuhos ng poste at biga
Ang ganda ng topic mo sir engr. Kaya lang lakas ng hangin e
Pasensya na po 😅✌
This partial beam, it does not compromise the strength of the beam? if not, how?
It does. Mga bad habits
i agree
paano ang design ng beam. di ba ang structural design niyan is buo ang buhos...? paano na ang gamit ng top bars
i advise the beam.must whole , concrete over slab
monolithic po dapat ang buhos.
I hope there is a structural engineer here who can verify it this practice of half beam pouring is safe. I heard one engineer who said that it is ok to cut pouring along the centroid of the beam cross section because transverse stress is zero in that location. He added, the compression area is calculated above the centroid area and the concrete below the centroid is assumed useless (if we take the midspan) as it is under tension and the bottom steel takes care of the stress.
CE student here ✋ coreect me if i'm wrong. pag ganyan ang methodology ng concrete casting on beam mababago ang design analysis ng beam. Example ang depth ng beam mo is 400mm, then ang design ng SE sa beam is DRB, pag binuhosan mo ang 300mm lang at iniwan mo ang 100mm, hindi na siya DRB, magiging SRB na design niyan. At mag babago din ang effective depth mo, imbes from centroid of bottom bar to the outermost fiber layer ng beam, hindi na. Kasi hanggang 300mm lang ang monolithic na buhos mo.
yes. concerning ang mga gumagawa ng ganyang method sa pag buhos. Unless naka design talaga na two part ang buhos nya at masigurado nya na yung bonding ng 1st at 2nd pouring eh maganda. mag aaway talaga kayo ng structural engr. pag ganyan ang methodology at hindi na consider sa design.
New subscriber here lods! ayos very informative! keep it up! Godbless
Mas ok talaga ang magkasabay ang buhos ng MGA BEAM AT FLOOR
yes po boss kc mas matibay po
mas tama pag monolithic ang buhos sir, kasi pag design mo ng beam, 1 lang ang timpla mg buhos
Bakit boss hindi ba pwedeng 2inch nalang ang di nabuhusan sa ibabaw ng beam.thank sa sagot
I hope there is a structural engineer here who can verify it this practice of half beam pouring is safe. I heard one engineer who said that it is ok to cut pouring along the centroid of the beam cross section because transverse stress is zero in that location. He added, the compression area is calculated above the centroid area and the concrete below the centroid is assumed useless (if we take the midspan) as it is under tension and the bottom steel takes care of the stress.
@@buildpodd369 pinaka sagot ata dyan sa effective depth of the beam. yung design kasi dyan is kunwari ay 300mm ang depth and it is doubly reinforced beam. ngayon sa construction method ni kuya, the depth was decreased by 50mm then the design strength of the beam will also decrease. tsaka magiging singly reinforced beam na lng yan.
Sir pwede ba iwelding ung connection ng bakal sa column at bakal sa slab bago buhusan
Galing po sir, subscribed!
Maraming salamat po, sana marami pa tayong matulungan 😊👍
Eto yung hinahanap ko n explanation sa pag slab .. thank you .. new subscriber here sir.. pashout out na rin sir 😊. Sir next video mo nga yung pag lalagay ng dowels sa ftb , column and beam at pano hulugan ang porma ng column ..
Sige po, nililista ko po ung mga request nyo 😊👍
Maraming salamat po, sana marami pa tayong matulungan 😊👍
Ask ko lang po pano kung may existing cemented beam na tapos ipa slab pede ba yung barenahan yung slab then lagyan ng injectables hilti chemical para ma rebar ang gagawing slab?
Sir very informative po ung video ninyo.. tanong ko lng po ano po ba ang tamang kapal ng steel deck sa 3m na pagitan ng beam po?ok lng po ba ung 0.8? Slamat po sa pagsagot at Godbless po.
sir makakabawas b ng tibay kung partial beam
Sir pwede po ba gawaan n ng beam ang buong area pero 3/4 lng ng height ng beam ang bubuhusan tapos after a year na ulet ang kasunod isasabay n ang slab.?.ideal po ba pinturahan nlng ung natirang bakal sa beam..wla po ksi kkyanan mgmonolitic eh..slamat po
Sir pwde po bah buhos lahat ang beam at e patung nalang yong steel deck same as po sa ibeam?
Sir gudday..tanung kolng po ilang days ang pagitan ng pagfooting bago pwd buhusan ang poste at gf beam?
Pano sir pang buo na ung beam at may pader na?
Bawal daw po bang iwelding yung steel deck sa beam
sir ask ko lang po.. yang column post at tie beam same po ba size nyan at set up ng bakal?
Hi po sir,, ask.q lng po Alin po b makakamura s pg sslab ung buo o half lng po,, slmt po s rply
Sir dapat po ba sabay ang beam sa pagbuhos hindi po steel deck yung pinapagawa ko.ang gusto kasii nila mauna yung beam at mabuhos ulit
good evening sir mag kanu po ba ang steel decking
ilng inches po Ang naging kapal Ng slab?
Boss prang baliktad yta kabit ng dba dapat nsa ibabaw yung bakal sa beam
Ito Yung correct na Pg lagay Ng metal deck naka patong sa beam (according to supplier warranty).
Alin po ang mas matibay, ang monolithic or half ng beam ang pouring ng slab?
Great job
Parang napanood ko na ito ginawan ng correction at reaction video ng isang Vloger na Engr. Hahaha sinabi mo pa naman sa video mo na matino na tutorial 😁
Kuya yun biga/beam mo nmn sa 2nd floor yun bakal at Stirap? Tnx
meron na po non, panuorin nyo na lang sa mga video ko
Ano po b yung pangsara s dulo ng decking my endcup po b cya?
Sa video ko po ng staging nandun po ung pagsara panuorin nyo po
Sir matanung ko lang po, 10 cm po ba yung kapal nga slab sa steel deck?
Hello po ask ko lang po kung ano pong ginagawa sa butas na nakaawang sa pinacut ng steel deck yung sa mismong pinagpatungan sa ibabaw ng biga, hindi po ba lulusot ang halo ng semento doon pagnagbuhos o may ginagawa po tungkol don?
Sir ayus lng po b nlgay n bakal? ng ptau ako ng smpleng bhay 12mm bakal n gnmit ng 6 n column? 9meters lenght x 4.5mtres widht ang floor area ng bhay 40sqm. My tie beam bakal dn sa ilalim 12mm din paikot my abang second floor? Ano po n basic taas ng second floor? Tnx very usefull ung mga blogs mo sir..
Sa 30 sq ano po ba ang dapat column rebar ng poste pra sa 2nd floor tnx po
Balak ko dn po mag partial pour lang ng beam, pati slab. Say may dlwang beam or slab na magkasunod, ndi ko mabubuhusan ng sabay. Pano ko ggwin ung formworks nun? Sa vertical level madali mag partial pouring, pero sideways pano ko gagawin?
Kulang din kasi pang formworks ko. Say meron akong multiple span ng beams. Eh ang balak ko kasi 1 by 1 kong buhusan. So like sa end ng beams kelangan ko saraduhan. Kso di ko lam kung pano
Kung nagtitipid po kayo ng husto, puede naman po mag sideways partial pouring,
wag nyo na lang po saraduhan ung dulo,
Pag nagbuhos makesure hindi malabnaw at ang ending mo sa dulo ay diagonal mas malapad ung ilalin sa ibabaw,
_______
\
\
___________\
Ganyan po para mas malawag ang surface area ng kapit ng cold joint, makesure lang po buhusan ng binder (grout) bago dugtungan ng susunod na buhos
@@newjourney2027 maraming salamat po napakaganda ng pagkakaexplain nyo. Yan dn po ang iniisip ko. At na supportahan nyo iniisip ko. At dinrawing mo pa
@@newjourney2027 anong klase ng binder ang ibubuhos?
ang ganda ng explanation na. good job idol🙏🏼
Maraming salamat po, sana marami pa tayong matulungan 😊👍
Ano size Ng stirrup nyo po? Maraming salamat
sir pag binuhusan ng buo yung biga at hindi partial beam. pero gagamit ng steel deck. okay lang po ba yun? parang ipapatong lang yung steel deck sa beam at iwewelding nalang sya sa may bakal. salamat sir.
Basta po may iniwang dowels na nakalawit na kakapitan ng steel matting,
Mas matipid lang kase pag partial beam kase pinakain ung slab sa kapal ng beam
@@newjourney2027 yung strength sir ng slab same padin po ba?
@@ferdieferdz3600 same lang po 😊👍
@@newjourney2027 thank you sir
@@ferdieferdz3600 Maraming salamat po, sana marami pa tayong matulungan 😊👍
ano sukat po ng slab at magkano cost steel deck at rebars.. slmt po
very informative. ask ko lang engr. pwede ba isagad yung baba ng mga steel forms sa steel deck or may mababaw na grove na klase ng steel deck para hindi makapal ang semento. thanks.
Dapat po bago mag Steel deck may at least 1 inch na concrete cover, bago mag steel matting (rebar),
Then may minimum po sa slab na 5 inches or 12.5 cm thick pero puede nyo na isama ung mula sa baba ng steel deck sa sulat na 5 inches, ang matitipid na part nyo po sa semento ay yung Grove ng steel deck halos 2 inches rin po yong mababawas sa 5 inches everytime na aakyat yung grove
Kailangan pabang tukuran sa ilalim ang steel deck
Opo, pero mas konte kasya plywood,
Panuorin nyo po ung video ko sa Scaffolding
Civil Engineer po ba kayu or architect sir?
Sir ang paglatag ba nang steeldeck ay yunv short distance nangbiga sa biga lo
Yes boss, laging dun sa maigsing pagitan para mas kayanin ng steel decking,
example: ang floor is 4m x 6m, ang size lengthwise ng steeldecking ay anim na 4meters ang haba
@@newjourney2027 slmat po engr. Sir sna magkaroon kayo nang video kng ano gagawin kng isang side nang house ko
Na may biga ay biga rin nang kapitbahay ko. Kng pano malalagyan nang steel deck. May nankapatong n kasing 5 layers n hollow blocks salamt sir
Engr. Safe po ba na naka patong lang ang steel deck sa concrete cover ng beam?
Thank you and more power to your channel
Puede naman po,
mas sinasuggest ko lang na naka integrate kaysa patong lang para mas rigid ung structure
@@newjourney2027 salamat po.
Wait ko po yung blog nyo about tie beam
Sir magkano po magastos sa 6x7 meter na steel deck kasama mga metal at baim nya
Sa floor nya po pang 2nd
sir pwede po ba pagkabuhos sa mga biga partially, at ilatag ang mga steeldeck ay gumamit ng 2 inch concrete nail para maikabit sa mga biga at hindi gumalaw ang mga steeldeck saka lalatagan ng steel matting, wala po kasi kuryente sa area
wag po kayo mag pako sa biga, butasan nyo na lang po ung steel decking gamit pako then itali sa rebars para di gumalaw
Very informative..ty!
Boss ok lng walang Crank sa slab?? New sub
Puede naman, mas matibay lang pag meron,
Pero pag more than 5 meters na ung span required na talaga
Pwede naman naka monolithic yan kahit steel deck
Ilan sukat yan binuhos nio boss magkano poh nagastos nio poh salamat
papaano po yung sa part ng mataas, kasi po diba may ribs ang steel deck, paano po yun bukas na parte ng steel deck pagbinuhusan na? hindi po ba tutulo ang halo doon?
Tutulo yan lagyan mo na lng ng mga plywood na ginupit pang harang
boss magkanu po magagastos sa 8x9meter steel slab po includ po beam.salamat
gagawa po ako separate video sa calculations, paabang na lang po
@JOSMAR
define muna natin ano ung simpleng bahay,
Based sa sinabi mo, 40m² GF then iiwanan mong nakabuka ung rebar mo sa taas para sa 2F,
Kung MARINE PLYWOOD naman ang 2F mo,
Ubra uang plan mo na 12mm lang ang poste,
Kung SLAB ang 2F na target mo I suggest magdagdag ka na lang ng konting pera P100.00 per bakal magiging 16mm na ung 4 rebar ng poste mo from 12mm,
then lagyan mo ng 2x12mm sa pagitan
O O
o o
O O
Dun naman sa tanong mo na ano ang standard height ng 2F:
Mula sa Finished Floor line ng GF to Finished Floor line ng 2F is 10 Feet,
Mula sa Finished GF papuntang kisame ng GF is 9 Feet,
So mula kisame ng GF papuntang Finished floor ng 2F is 1 Foot (30cm) nandun mo na pagkakasyahin lahat ng electrical at plumbing
Sir gud eve npakaganda ng inyong explanation marami ako natutunan may tanong lg ako sir pag 3 storeys ung patayo qng bahay ilang bakal gagamit ko at anong size ng bakal.salamat po.god bless!!
@@nestorsalarda9765 sa poste I suggest 8pcs x 16mm
o o o
o o
o o o
Boss gus2 ko pong matoto salamat po sa konteng kaalaman
Bakit walang abang na rebars para sa chb wall?
Sir pagbuhos ng partial sa biga, kinabukasan pwede na ba ilatag yun steel deck at rebars. Salamat po
Yes po pero wag tatanggalin ung staging kase 15 days pa po para sure ung curing
@@newjourney2027 ok sir. Salamat po
@@jeffreyperalta5843 Maraming salamat po, sana marami pa tayong matulungan 😊👍
@@newjourney2027 hi sir, in what day po pwede na maglagay ng columns?
My first time to use steel deck. Just like sa video nakapatong yung steel deck sa beam. Paano matatakpan yung dulo opening ng stee deckl para hindi doon tatagas ang buhos? Your reply will be greatly appreciated. Thanks
Sir panuorin nyo po ung video ko sa Scaffolding and Stafing nandun ko po tinuro ung pagsara
Ilan inches nakapatong ang steeldeck sa beam
1 lang po
Sir,good day po!pahabol na question lang po.advisable po ba na hindi kailangang haluan ng water proofing mixture ang buhos na concrete sa steel deck?may nakita po kasi akong steel deck na kinalawang sa ilalim na gilid na part sir.Maraming Salamat po sa tugon Sir!God Bless po!
para sa akin ung paka lagay nang rebar sa taas ay mas maganda kung naka patong sya sa beam at saka nag hook down
Correk poh nakapatong lang dapat
Pag GF 12mm
25cm x 25cm both ways
Pag 2nd Floor 12mm
20cm x 20cm both ways
Yung GF puede mo tipirin like gawin mong
10mm 30cm x 30cm both ways pero siguraduhin mong sobrang ganda ng papatungan or natamper/siksik mo ng maige ung lupa,
Yung 2F I don't suggest to go below standard
Lods tinira ka ni aron james garcia ah
sir hindi ba hihina ang beam pa nhati ang buhos?
Basta maganda po ang dugtungan at proper ang binding ok lang po
pano po magandang paraan ng bi binding sa half beam
@@wilfredotenedero6213
Gagawa ako video sir para detalyado 😊👍
Nasa gitna ng beams na pahiga ang tamang pagputol ng buhos kong kailangan pero mahirap na linisin ang mga concreto sa bakal ay kailangan din mag tanggal o mag sinsil ng mga plastic na concreto sa lahat na lumang concreto para kakapit ang bagong buhos...
Sir pwd pobang buhusan ang lahat ng biga bago ipatong ang stell deck salamat po
Kung ang ibig sabihin nyo po ay PARTIAL BEAM yan po mismo ung ginawa namin nagbuhos muna ng ⅔ ng biga then pinatong ung steel matting saka winelding,
Kung ang tinutukoy nyo po ay buuhin lahat ng biga/beam bago magpatong ng steel Matting puede naman po pero bihira ang gumagawa non dahil:
1.) Need mo pa maglagay ng dowels para sa kakapitan ng steel matting kaya mas magastos sa bakal
2.) Mas magastos sa semento dahil hindi nyo binaon ung slab sa beam
@@newjourney2027 oky po maraming salamat po sir may natutunan po ulit ako sa inyo sir salamat po
dapat sa ibabaw ng beam mga rebars ng slab mo sir. nakapatong dapat
laking tulong po salamat sir
New subscriber po ako.. ask ko po Kung Pano ko ilalatag ang steel deck SA bahay ko na buo na ang biga,,bale paikot palang po Yung biga at wala pang biga SA gitna
Patong nyo na lang po mga 50% ng biga then tikitikin nyo po ung biga para mailabas ung rebar na kakapitan ng dowels para sa steel matting ng slab
@@newjourney2027 salamat po panoorin ko mga video nio po Kasi mag DIY Lang ako SA maliit Kong bahay
@@ededie5586 ayos yan boss mas makakamura ka dyan ng at least 50% 😊👍
Sir ano po standard Ng bakal pang slab 2 storey at spacing nito?
12mm, then 20cm spacing both ways
Sir, na feature po yung video niyo sa ibang chanel title mga nakasanayang mali sa construction. Panoorin niyo po kung ano mali.
Sir gud day po asking lng po sa deck at sa ganyan sukat po magkano po aabutin po sa slab lang po sana masagot po sir salamat God bless..
Sir gagawa po ako ng separate Video para mas detalyado macocompute na po graba, buhangin, semento, tubig 😊👍
Pag naka steel decking na ba sir, di na inaapply ang one way slab or two way slab rule?
wala po sa type of decking ang basis ng slab rule,
nasa beams po na kinakapitan
Ito ang pinaka matino na nakita ko na latag ng rebar sa steeldeck
Hindi kakapit ang bagong concreto sa lumang semento na kumakapit sa bakal kaya walang silbi ang top bars at mga anelyo. Kapag niyanig ng lindol ay mag crack ang beams.. Dapat linisin muna ang naka kapit na lumang semento sa bakal at mag sinsil sa mga lumang concreto para kakapit ang bagong semento...
Pwede pala hatiin ang buhos nang beam? Is this legit.. Mas importante buhos lahat ang beam if possible tsaka nalang ang slab ipatong mismk sa beam..
Curing mo nga malimali.. Its 14,21,28...
Hindi pwede hatiin
Sir taung lng ilan sqm po yn gingawa nio at magkno ang gastos sir para magka idea ako.
Sa tantya ko sir nasa 70sqm po yan, then sa estimate ko ung slab and beam labor materyals is approximately 120K,
Pero laya po mura yan dahil wala po akong foreman at skilled puro labor lang tapos tinuturuan ko lang sila ng diskarte para eventually maging skilled na sila
New sub po, thanks sa video. Engr magpapatayo po kasi ako ng bahay 6x7 at umorder na ako ng web deck 1mm na 12pcs na 7m ang haba. Engr pwede po ba nilang ilatag yung 7m na haba at ipatong nlng sa beam na wala na pong putol?Kumbaga 7m straight nalang, pero sa tapat ng cross beam sa gitna magbubutas sila sa steel deck ng lulusutan ng dowel. Sana po mapansin niyo.
Puede po, yan po ang pinakapraktikal na gawin 😊👍
Binasa ko po ng maige, muntik na ko tumangi kase hinihintay ko ung dowels,
Pero sa dulo ng message nyo nandun ung paglusot ng dowels sa cross beam kaya OK po yan 👍👍👍
Its not advisable na mag wweld ka sa main bars mo, dapat nag lagay ka dowels sa beam mo. Dapat maglagay ka extra bars to compensate ung na loss dahil sa putol na buhos at the same time need i cheap at linisin muna
Sir mtnong ko lng po kpag po b 30x30 cm ang beam at illbas ang abang na bakal ng 10cm d ble 20cm nlng po ang beam nya sa ilalim?ok.lng po b gnun para sa slab na bahay?
Yes po yan po mismo ginawa ko, so lumalabas pag nag buhis ka ng flooring at susundin mo ung standard magiging 32-35cm na ang taas ng beam kasama na don ang slab
@@newjourney2027 ganon po ba yon.. me cold joint yung biga mo sa sa soffit level ng slab mo
@@doga815 yes po kaya need mag add ng binder
Salamat po
Ang gagawin bhay ay 2floor. Slab buhos pati bubong nya ay buhos rin..ang sukat ng bhay 4meter. sa likod nman 8meter.rektangle.6pcs na poste?
Ask kulang.pwde ba un 12mm 4pcs 10m 2pcs pang poste nya??
At pwde rin ba yan sa beam?
mas magasto sya concrete
Di po mas tipid pa po 😊👍
hi sir ask ko lang if paano ikabit and steel deck ikabit pag may asbuild na beam? like normal gi roof tapos may abang kasi na pang 3rd floor biglang gusto namin roof deck nalng di na 3rd floor. paano ma kakapit yun?
Obserbasyon lang, nabuhusan na ang beam pero naiwan yong top bars, parang kalahati na lang ang tibay ng beam. Walang bonding sa steel at concrete. Maganda sana monolithic beam at slab sabay ang buhos. Kung beam lang unahin dahil sa budget, maglagay ng dowel para sa slab at buhosan ang tamang kapal ng beam.
Sa 30cm X 23cm na beam ilan ang distance ng column to column?
3-5meters dipende po sa bigat at taas ng isasampang load
@@newjourney2027 maraming salamat Sir
@@newjourney2027sa steel decking. ilang millimeter ang nakapatung sa beam? salamat again sir.
@@ninzzkoikaw 2.5cm or 1 inch
Rule of thumb Ng depth Ng beam na ginagamit ko is span X .09.
Mastado dikit ang pormas sa bakal boss dapat may 5 cm destansya sa bakal
sir paano ka makontak at baka pwede mo ko matulungan balak ko magpatayo ng bahay...
Pm me
sir male po yan hindi po tama yan dapat sa bahay yan hindi nauuna yung kalahati ng biga nababwasan strength kahit pa check po yan sa engineer
d matibay yan boss
Gawang barrio
YUNG BIGA NYO JAN MAY CEMENTO NA DAPAT YAN LINISAN BAGO BUHOS...MAS MAGANDA PA DIN YUNG SABAY BUHOS
isa sa maling nakasanayan sa contruction sa pinas hindi binubuhosan ng tama ung beam bakit nag tirapa ng ilang inches sa beam? nagiging weak ung beam.
Kung saan mo pinutol ang pagbuhos sa biga ay doon malakas ang tinatawag na shear stress. This is not advisable and not good. Please consult a legit structural engineer para masiguro ang safety ng building at buhay ng mga occupants. Have a nice day everyone.
Sorry pero hindi pwede ang basta-basta na lang mag DIY tayo ng reinforced concrete building construction. Please let the professionals do it.
Pfft... haha
Moment capacity of beam is questionable there is call joint and the effective depth is rejuce
Mali yan dapat pinatong mo sa beam ung steeldeck. Pra matibay ndi dpat putulin ung steel deck ok hhina kc steel deck. Pg 20feet ok. Sakin lng un.
Mukhang mahina yan. Dpat ung buhos isang bagsakan lang
Kumunsulta muna sa civil engineer kung tama ba yan sundin ng maipaliwanag sayo kung alin ang tama wag agad magpapaniwala sa mga ganyan.
MALI
Nawala po un tibay ng viga.