HOW TO INSTALL LENGTHS OF RAISED KERB TRIM TO AN EPDM ROOF - INTEGRA-TRIM

Поделиться
HTML-код
  • Опубликовано: 10 сен 2024
  • In this EPDM roof video tutorial, you’ll learn how to correctly install lengths of Integra Trim Raised Kerb Trim.
    Installed and joined correctly, Raised Kerb Trim stops rainwater running off the side of the roof and directs it towards the Gutter Trim - which then directs it into the guttering system. Follow the steps in our video and your EPDM roof edges will look great too!
    Contact us with questions or to learn more about our EPDM roofing training: www.flexiproof...
    Learn more about the FlexiProof EPDM flat roof system: www.flexiproof...
    Tools required:
    • Tape measure
    • Pencil
    • Fine tooth hand saw or multi-cutter
    • Hammer
    • 50mm PolyTop nails
    Materials required:
    • Lengths of Raised Kerb Trim
    Things to be aware of:
    • The prepared roof surface must be clean, dry, and free from dust and contaminants (bitumen, oil, etc).
    • Make sure the Integra Trim Raised Kerb Trim External Corner components to be installed are clean, dry, and free from dust and contaminants.
    • Each length of Raised Kerb Trim is covered with a protective film. Make sure to carefully peel this off before installation.
    • Raised Kerb Trim is supplied with pre-drilled holes (at the correct spacing of 345mm) to ensure the optimum compression seal when securing with 50mm PolyTop nails.

Комментарии •