Reworking The Track Plan! | O Gauge Layout Build Series Update 10

Поделиться
HTML-код
  • Опубликовано: 8 авг 2023
  • In this video we go over how the current track plan wasn't what I wanted it to be. I decided to tear up the inner loop at the front of the layout and implement some new switches to connect both loops together more cohesively.
    With this new setup I can now run switching operations and the engines handle the curves much better.
    Ballast used-
    amzn.to/3KzYn9h
    Track painter-
    amzn.to/44ZM26J
    Grass applicator-
    amzn.to/47rDR4I
    Static grass-
    amzn.to/3YqVP2Y
  • РазвлеченияРазвлечения

Комментарии • 22

  • @RolandForest
    @RolandForest 11 месяцев назад

    Thumbs up. Credit to you being flexible in your design

  • @tobystubbystrains5206
    @tobystubbystrains5206 11 месяцев назад

    I like it, having a switch yard and passing track and 2 loops. I've been trying to think of a good layout with a switch yard. I do like the small switcher engines too, I want Lionel new 0-6-0 tank engine with the electro mag couplers.

  • @Stussmeister
    @Stussmeister 11 месяцев назад

    A very nice video and layout. I'd also like to add that flexibility and adaptability are useful skills to have in model railroading, as the layout plan I have currently is much different than the one I started with when I first got into model railroading about five years ago.

  • @1800clyde
    @1800clyde 11 месяцев назад

    That is an interesting set-up; IMHO being able to continuously run and do switching is the way to go. Sometimes a swing-and-a-miss leads to a homerun; you're on your way now. Look into building kits. I know Lionel has some for houses, but there may be some older industrial kits that are a fraction of the price, and it's not a total kitbash task. Some spray paint and glue and good-to-go. Thanks for sharing your work.

    • @triplertrains
      @triplertrains  11 месяцев назад +1

      Funny you say that because I just ordered a kit as well as some old Lionel pieces to assist in some scratch building metal shingles.

  • @johnknippenberg-LandmarkYards
    @johnknippenberg-LandmarkYards 11 месяцев назад

    Looking good! 😎👍

  • @TwistedMacGyversTrains
    @TwistedMacGyversTrains 11 месяцев назад

    I really like the new track plan and I also like the idea of not having a town. Something about lots of track sidings and switches are what I like as well. Keep up the great work!

  • @LiamBMP
    @LiamBMP 11 месяцев назад

    Cool video. 👍

  • @williamkaczmarek3996
    @williamkaczmarek3996 9 месяцев назад

    I like your layout. I've got a 4X12 foot table and I'm trying to figure out how to set it up for two main lines and some areas for switching operations too.

  • @Gilstrains
    @Gilstrains 11 месяцев назад

    👍🚂🚞🚞🚞🚞✌Great intro, great video.

  • @deweyhall712
    @deweyhall712 11 месяцев назад

    The hobo union called. They said, that you're missing the hobo camp..

  • @northpennvalleysteamrailroad
    @northpennvalleysteamrailroad 11 месяцев назад

    Awesome 😊

  • @Rob1_5
    @Rob1_5 11 месяцев назад

    The ideas with the storage tracks going into the mountains are definitely unique. I've been to the Former K&T railroad in Stearns Kentucky, it was coal and lumber hauling short line railroad back in the day. You should research that for inspiration on your lumber mill and coal mine, while the standard Guage cars don't go into the mountains it's still a pretty good prototype for your infrastructure like the coal tippel and things, you could even put the tippel building on the mountain and have the chute that loads the cars go down into the mountain and load the car s while the cars are in the mountain.

  • @MatecaCorp
    @MatecaCorp 11 месяцев назад

    I really like the new track plan. If you wanted to you could add a loading/unloading platform for the tank cars and maybe a few tanks so it's kind of another industry

  • @allanmartinez1190
    @allanmartinez1190 10 месяцев назад

    Did you ever think about using Lionel 48 radius Remote switches? This way you wouldn't have to go everywhere on the Layout too throw the switches just stand by your transformer & switch controls. Do you think you will be interested in making a video segment or a two-part episode on wiring your Layout? That is my weakness. I have no idea & knowledge on wiring a Layout? BTW Your Layout is looking Great I want to see a lot more

    • @triplertrains
      @triplertrains  10 месяцев назад

      The cost of those O48 remote switches was a bit out of the realm of what I wanted to spend unfortunately.
      Also O48 switches would have left me with less yard room on an already cramped layout.

  • @kingjulian9496
    @kingjulian9496 7 месяцев назад

    Any new layout updates since this one

    • @triplertrains
      @triplertrains  7 месяцев назад +1

      Been working on the upper loop mountain on the left side. I’ve been super busy with work and life but hopefully making an update video soon.

    • @kingjulian9496
      @kingjulian9496 7 месяцев назад

      @@triplertrains very cool. I've watched your videos from the very start. I was one of the first 40 to your channel. I'm always impressed with how your coming along with the layout. Anyways happy holidays you and your family. Look forward to the next udate.

  • @RolandForest
    @RolandForest 11 месяцев назад

    yikes...not much room left for structures? Will you consider adding another table making this a "L" layout?...add the mining operation on that table

    • @triplertrains
      @triplertrains  11 месяцев назад +1

      I do actually have plans to add on but we will see 🤞🏻

    • @RolandForest
      @RolandForest 11 месяцев назад

      @@triplertrains best of luck …will keep watching