Alarm Check Valve Assembly - ACV Complete Detail in Urdu/Hindi

Поделиться
HTML-код
  • Опубликовано: 22 авг 2024

Комментарии • 83

  • @TanweerAhmed
    @TanweerAhmed  Год назад +1

    Riser Check Valve ruclips.net/video/A0TO8ZX96Aw/видео.html

  • @manishsharma-ip5hs
    @manishsharma-ip5hs Год назад +3

    such a great platform to learn thank u sir kindly teach us more.

  • @DivyaRajput2013
    @DivyaRajput2013 10 месяцев назад +2

    From Hindustan to Doha Qatar Jay ho super duper

  • @farrukhmahmood4099
    @farrukhmahmood4099 Год назад

    Assalamualkum. Allah aap ko dunya akhrat main kamyab krin or Allah aap sa deen ka kam lain

  • @deepakkhotkar9785
    @deepakkhotkar9785 Год назад +2

    Mind Blowing Boss... Salute

  • @syedwakeel140
    @syedwakeel140 Год назад +1

    thank you for sharing worth information.

  • @PradeepKumar-ds5lc
    @PradeepKumar-ds5lc Год назад +1

    Sir 1 video banaey jis me pump room se le kar building 🏢 ke top tak jisme kitna Haider niklta hai pump se kaise kanection Kiya hua hai pipe line ka or besment ka video Daley
    Thanks 🙏

  • @farrukhmahmood4099
    @farrukhmahmood4099 Год назад

    ماشاء اللہ بہت خوب

  • @faridkhan-mf5xg
    @faridkhan-mf5xg Год назад +1

    SIR THANKS. JAZAKALLAH

  • @younusali8459
    @younusali8459 7 месяцев назад +1

    Thanks

  • @ahmadlodhi6998
    @ahmadlodhi6998 7 месяцев назад +1

    thanks

  • @ashrafsalafi
    @ashrafsalafi Год назад +1

    Good explanation

  • @rameshkannansubburam2822
    @rameshkannansubburam2822 Месяц назад +1

    can you add english subtitle also it is helpful for all of us

  • @babugandhibose6663
    @babugandhibose6663 Год назад

    Very useful video thankyou sir 🙏

  • @farrukhmahmood4099
    @farrukhmahmood4099 Год назад +1

    Tanveer bhai. Fire fighting pump ko bypass kasy krin gay. As ke video banyan detail k sath. Pump test nai krna ata ha mujhy

  • @zahidullah5724
    @zahidullah5724 Год назад +2

    Dear tanveer,
    As per NFPA in alarm check valve there have pressure switch.
    For low pressure you mention in this vedio 4 to 15 psi and for high pressure range set on how much PSI ? Please give a short answer...

    • @TanweerAhmed
      @TanweerAhmed  Год назад

      6psi pressure is normally used at pressure switch

    • @TanweerAhmed
      @TanweerAhmed  Год назад

      Minimum 4psi and maximum 15psi

    • @TanweerAhmed
      @TanweerAhmed  Год назад

      This pressure is used for tripping pressure switch

  • @editlab7128
    @editlab7128 Год назад +1

    You are great of the fire fitting engr🐵

  • @taqirkan7712
    @taqirkan7712 Год назад +2

    AOA Tanveer Bhai...yeah bhi batayaa ga k (at the start of project) when we have architectural drawings ya phir agar covered area available ha ( let say a hospital / university/library etc) then how can we roughly calculate the tonnage requirements of the entire covered area ) ...Thank you

  • @vijaykumar-hh7hm
    @vijaykumar-hh7hm Год назад

    Please post video design and working principle of water curtain

  • @rahilsayyed2339
    @rahilsayyed2339 Год назад +1

    Assalamualaikum sir
    Sir.. HVAC duct estimation ke liye kya karna hoga

    • @TanweerAhmed
      @TanweerAhmed  Год назад

      W.Salam,
      You have to duct area calculation as per drawing

  • @rajeshkushwaha4902
    @rajeshkushwaha4902 5 месяцев назад +1

    Sir moffler kis liye lagaya jata hai

    • @TanweerAhmed
      @TanweerAhmed  5 месяцев назад

      It is used for sound reducing but where it is uses? Application

  • @mohammadamir4822
    @mohammadamir4822 Год назад +1

    💯💯💯💯

  • @AbidHussain-rv7ll
    @AbidHussain-rv7ll Год назад +1

    Can we use Alarm check valve in stand pipe system. Is any requirement of nfpa regarding this. Please advise. As per my experience I haven't seen ACV with fire hose cabinet system

    • @TanweerAhmed
      @TanweerAhmed  Год назад +1

      This ACV used in automatic operating system like sprinklers systems while fire hose cabinet is manual operating system there no required

    • @AbidHussain-rv7ll
      @AbidHussain-rv7ll Год назад +1

      @@TanweerAhmed Thank you so much. Appreciated .

    • @TanweerAhmed
      @TanweerAhmed  Год назад

      Welcome

  • @user-gd6tv6mp7k
    @user-gd6tv6mp7k Год назад

    If any tower having 20 floors and each floor consists 30 sprinkler means 20 x 30 = 600 sprinkler,
    If tower exceeds more than one!!
    Shall provide more than one icv Or need only one icv for more than one tower????

    • @TanweerAhmed
      @TanweerAhmed  Год назад

      What is icv?

    • @TanweerAhmed
      @TanweerAhmed  Год назад

      As per NFPA 13:2019, 4.5.1 The maximum floor area on any one floor to be protected by sprinklers supplied by anyone sprinkler system riser or
      combined system riser shall be as follows:
      (1) Light hazard - 52,000 ft2 (4830 m2)
      (2) Ordinary hazard - 52,000 ft2 (4830 m2). Therefore on any one floor, you can install one Zone Control Valve Assembly and sprinklers quantity to be calculated according to hazard recommended area.

  • @funnyvideos9375
    @funnyvideos9375 Год назад +1

    Sir please elevator lift control panel

  • @azadmohmmad2721
    @azadmohmmad2721 Год назад +1

    Assalam alikum sr Darin karne par fire alarm system Nahi sound karta ha kiu

    • @TanweerAhmed
      @TanweerAhmed  Год назад

      W.Salam,
      Alarm Check valve (ACV) assembly's alarm activate when this ACV open. When water flow from pump to sprinklers then ACV opens. Now you have to check the location of drain valve then you will understand.

  • @samrinriza9659
    @samrinriza9659 2 месяца назад +1

    didnt explain what the use of O S Y VALVE

  • @dineshgautam5658
    @dineshgautam5658 Год назад +1

    Brother ham ko ek daut hain please confirm Karen Jo alarm check valve se Jo chamber mai watar jata hain to water pressure hold nahi hota hai continue Bell bajta hai aur pressure switch active rahta hain system normal nahi hota hai please confirm

    • @TanweerAhmed
      @TanweerAhmed  Год назад

      There is mistake in installation of assembly. Follow the assembly of ACV accordingly to manufacturers drawing recommendations. Drawing always given in catalogue of ACV assembly. Recheck the assembly according to drawing and install accordingly. If installation is correct then accessories may be some fault/error.

    • @dineshgautam5658
      @dineshgautam5658 Год назад +1

      @@TanweerAhmedbrother mistake toh kuch hai lekin pata nahi chalrah hai , lekin jab check valve ka 1/2" valve open karte hai to water direct chamber me jata hai aur fir waha se sedha gong Bell bajta hai fir watar dren hota hai continue 👉 chamber me toh koi koi watar dren point nahi hai please confirm

    • @TanweerAhmed
      @TanweerAhmed  Год назад

      @@dineshgautam5658 Water will drain continue from the chamber then the mechanical bell will start because the gong works with the flow of water. If you want to close the bell then its valve has to close manually.

    • @dineshgautam5658
      @dineshgautam5658 Год назад +1

      @@TanweerAhmed ok brother I got your point but we need to open All times the chamber Valve if not open the valve pressure switch not going to rest in the fire alarm control panel please confirm

    • @TanweerAhmed
      @TanweerAhmed  Год назад

      @@dineshgautam5658 It will be reset when the water flows from the ACV assembly will stop. If water is flowing through the assembly then it will continuously run gong and also signals will transfer to FACP. You can reset either manually by closing the valve of the assembly where water is going to a gong or stop flowing water from the ACV assembly.

  • @Shaaz_Line
    @Shaaz_Line Год назад

    hello engr,
    can we use grooved type instead of flange type, is there any nfpa requirements on this regards

    • @TanweerAhmed
      @TanweerAhmed  Год назад

      Yes you can use

    • @Shaaz_Line
      @Shaaz_Line Год назад

      @@TanweerAhmed our project spec demands for using flange type, but we installed groove type. So do we have any nfpa reference for this, so client will accept our installation

    • @TanweerAhmed
      @TanweerAhmed  Год назад

      @@Shaaz_Line NFPA requirements is pressure and these both types are allowed to use but according to project aspect point of view should follow specifications. If you change any thing from contract then should get approval before change anything from approving authority

  • @muthumuruganm9795
    @muthumuruganm9795 2 месяца назад +1

    Brother please add english suptitle..
    ..please

  • @joydevmondol9170
    @joydevmondol9170 Год назад +1

    Valve inspection Alarm problem plz help

  • @ibrahimgadwal5510
    @ibrahimgadwal5510 Год назад

    Manifolding ke bare video banaye details mr

    • @TanweerAhmed
      @TanweerAhmed  Год назад +1

      Manifolding about what?

    • @ibrahimgadwal5510
      @ibrahimgadwal5510 Год назад

      Fire fighting me Pupm room Manifolding system hota jise water ka pressure or flow speed maloom hoti hi.
      High pressure zone Hydrant & Sprinkler se alag alag Manifolding pipe me pipe connection hota hi jisme pressure Gage or flow mtr lage hotey hi.
      Same ayse hi low pressure zone se bhi Ayse connection hoti hi.
      Or system me water drain pipe bhi laga hota hi.

    • @ibrahimgadwal5510
      @ibrahimgadwal5510 Год назад

      Is system ko explain kre
      Or Manifold ke importants ke bare bataye

    • @TanweerAhmed
      @TanweerAhmed  Год назад +1

      Manifold means header with junction connections

    • @TanweerAhmed
      @TanweerAhmed  Год назад +1

      Ok noted

  • @zahidnawaz2345
    @zahidnawaz2345 Год назад +1

    Sir ap kabhi bhi Makkah ayain to is comment pey apna number chor daina , i will give you personnel tour of all ziarats in Makkah. Jazak Allah khair.