Ultimate Luxury Master Ensuite Remodel! (Full remodel from start to finish)

Поделиться
HTML-код
  • Опубликовано: 5 янв 2025

Комментарии • 20

  • @alicia2oal
    @alicia2oal 2 года назад +1

    Stunning transformation 👏😍

  • @juancarrasco6247
    @juancarrasco6247 2 года назад +2

    Que gran trabajo amigo, felicitaciones.

  • @REGDORTNARG
    @REGDORTNARG 2 года назад +1

    nice work. looks great!

  • @REGDORTNARG
    @REGDORTNARG 2 года назад +1

    how do you make sure that the schluter membrane is not higher then the wedi shower base ?

    • @REGDORTNARG
      @REGDORTNARG 2 года назад +1

      is that what the metal joist hangers are for ? I want to build the same design at my home. but I dont want the heated flooor sitting proud above the shower base. so that the transition is flat for tiles.

    • @scavettarenovationdesignin8953
      @scavettarenovationdesignin8953  2 года назад

      @@REGDORTNARG yea the recess kit allows the pan to sit on top of the joists. Your sub straight should be 5/8”. The WEDI pan is about the 3/4” so it sits just slightly higher than the subfloor. So when you lay your schluter heat membrane, it will be at the same night as the WEDI shower pan. I’ve never had an issue.

    • @REGDORTNARG
      @REGDORTNARG 2 года назад +1

      @@scavettarenovationdesignin8953 awesome. I have been waiting for them to come out with that solution. thanks for the help

    • @scavettarenovationdesignin8953
      @scavettarenovationdesignin8953  2 года назад

      @@REGDORTNARG no problem. Good luck with your project. Thanks for supporting the channel

    • @REGDORTNARG
      @REGDORTNARG 2 года назад +1

      @@scavettarenovationdesignin8953 Thanks again for the help!

  • @HergyTime
    @HergyTime 2 года назад +1

    When is Vinny starting his own channel? #morevinny

  • @tediesawley8201
    @tediesawley8201 2 года назад

    p♥r♥o♥m♥o♥s♥m 😩