भाई तू सचमुच गरीबों का गुरू है ! 1 हिन्दी में समझाता है, 2 वीडियो यूट्यूब पर उपलब्ध कराता है, 3 इतना धीरज से और आसान तरीके से हरेक बारीकी समझाता है, 4 एक दसवीं बारहवीं पास हैल्पर मजदूर को भी इन्जीनियर जितना योग्य बना देता है, 5 पैसे नहीं होने से पढाई छोड़ चुका मुझ जैसा बालक तेरे इन वीडियो को देख समझकर आज बुढापे में इन्जीनियर की पढाई कर पा रहा है । सादर पाँव धोक ! पैरी पौना ! चरण-स्पर्श गुरू जी ! 🙏🙏🙏
Thank you very much for your Love and Support . I appreciate your expression of support and goodwill. Let us continue to learn and share knowledge together.
Thank you ironman Hame bohat khusi hai ki aapko hamari mehnat pasand aai , Civilguruji isi tarah civil engineers ko aage badane ke liye mehnat karte rahega aur aap bhi knowledge dusro ko share karte rahe. KEEP LEARING, KEEP SHARING.
Number of bars along the B direction= 9 nos Cutting length along A direction=1.65 meter 100mm bend Cutting length along B direction=1.62 meter 88mm bend Total Steel quantity=209kg. Total amount of steel @50=Rs.10,450Rs Binding wire =2.9Kg.
Gd evening sir.. I am manish from bihar... I am diploma holder... I am big fan of u and for civil gurujii platform.. Footing f2 = 8 nos To find :- Cutting length :- A direction :- 1.55 meter. B direction :- 1.52 meter. Total weight :- 218.24 kg Total amount if rate rs 50/kg :- 10912rs Binding wire:- 2.18 kg..
F2 cutting length direction A along a bar=1.552 m Cutting length direction B along a baar = 1.528m Total weight of steel=219kg Total amount rate according to 50/kg= 10950
Cutting length of bar along A direction=1.55m Cutting length of bar along B direction=1.52m Total weight of steel=219Kg Total amount if rate Rs 50/kg=Rs10950 Binding wire 1% of total weight of steel=2.19kg
Cutting length of bar along A direction=1.552 m Cutting length of bar along B direction=1.528m Total weight of steet=219kg cost of total steel @50rs/kg=10950 Rs Binding wire=2.19 kg
Binding wire is 2.24kg Total wt of steel in footing is 224kg Total cost of footing is 11200rs@ 50rs/kg Cutting length A is 1.55m ..........................B is 1.54m Total no.Of steel along A@B is 20nos. Is right sir and thankyou very much civil guruji...
C.L of Bar A- 1.55m C.L of Bar B- 1.53m For 8 footing:--- Total steel qty. = 219kg Unit rate of ofsteel = 60/kg Total cost of steel= 219*60=13140/- Contigencies binding wire =2.19kg Unit rate of binding wire= 70/kg Total cost of binding wire= 2.19*70= 153.30/- So total cost of 8 F2 footing on steel +binding wire= 13293.30/- Sir labour ka kya rate hota h cutting +binding ka is pr v bataye. Unit
No. Of Bar= 10 NOS in A direction and 10NOS in B Direction. Cutting length in A direction= 1.552 Cutting length in B direction= 1.540 Total wt. In 1 Footing= 27.487 If 8 No. Of Footing then Total wt of all footing is = 220 Total Amount = 11,000 Rs 🙏Thanks for this lacture Dir
Thank you ASADULLAH Hame bohat khusi hai ki aapko hamari mehnat pasand aai , Civilguruji isi tarah civil engineers ko aage badane ke liye mehnat karte rahega aur aap bhi knowledge dusro ko share karte rahe. KEEP LEARING, KEEP SHARING.
cutting length of bar A=1.65 cutting length of bar B=1.62 Total weight of steel=227kg Total amount if rate Rs 50/kg =11376 Binding wire 1% of total weight of steel=2.27
Nos of bar in both direction =10, 10 C. L of RA=1.55 C. L of RB=1.52 Wt of steel in A direction=13.77 Wt of steel in B direction=13.51 Total Wt of one Footing=28 Kg Total Wt of F2 Footing=28*8=224 Kg Unit rate of steel=60 Rs/kg Total amount of steel=13440 Contingency of binding wire=2.24kg Please check and mention correct Or not
MOST VALUABE INFORMATION ABOUT BBS No one provide us such type of knowledge. CIVIL GURUJI is the best platform to gain those skills. THANKS YOU SO MUCH SIR AND YOUR TEAM. LOVE YOU FROM ODISA SIR.❣
F2 footing Cutting length of A axis = 1.55 m Cutting length of B axis = 1.52 m Total weight = 224 kg Total amount = 11200 rupees Binding wire = 2.24 kg Thank you so sir 💕
Number of bar = 10 Nos Cutting length along A direction = 1.55 M Cutting length along B direction = 1.52 M Total steel of Quantity = 224 KG Total amount of steel As per Rs.50 in 1 KG = Rs.11,200 Bending wire = 2.24 KG
sir intehayee behtareen video likin ap quantity course ka keh rahe hai o to sirf india mai hai ap please qs course videos mai upload karo taa k hm pakistan mai bhi fayeda othayen thankyou
Hello @JBAssociates93 QS ka course all over in word me available hai. Aap hume 9111001234 par whatsapp message kijiye hamari team aapki help kar dengi.
Thank you very much for your Love and Support . I appreciate your expression of support and goodwill. Let us continue to learn and share knowledge together.
1-F2 footing ke liye steel 25.51kg 2- cutting length Ra ke liye 1.45 m and Rb ke liye 1.42 m 3- total number of bar footing F2 ke liye 20 4 - bending wire 2.04kg F2 ke liye
16:50 cutting length of bar B =1700+2×(250-50-50)-(2×2×12)-12 =1940mm Why you take 2×time minus 12mm dia bar? It is placed only in bottom not top so simply it is minus by 12.
भाई तू सचमुच गरीबों का गुरू है !
1 हिन्दी में समझाता है, 2 वीडियो यूट्यूब पर उपलब्ध कराता है, 3 इतना धीरज से और आसान तरीके से हरेक बारीकी समझाता है, 4 एक दसवीं बारहवीं पास हैल्पर मजदूर को भी इन्जीनियर जितना योग्य बना देता है, 5 पैसे नहीं होने से पढाई छोड़ चुका मुझ जैसा बालक तेरे इन वीडियो को देख समझकर आज बुढापे में इन्जीनियर की पढाई कर पा रहा है ।
सादर पाँव धोक ! पैरी पौना ! चरण-स्पर्श गुरू जी ! 🙏🙏🙏
Thank you sir... 3-4 Lakh deke college/Institute me vi itna easy way me nhi sikhata hai... Love you sir
Is video me jo bhi aapne bataya wo mujhe phle se pata h ..Lekin aap itna acche se batate ho ki maine apka pura video dekha... Good job sir 🙏
Asad thank you for your words it motivates to make more video.. 👍 keep learning keep sharing 😊
Best teaching of Bbs in Utube.. Outstanding sir.. Please upload Beam,column, staircase, slab
What about chair
Good job sir apki waja say bahoot information hasil hoi
From Pakistan 😍
Hello Hashim Abbas
Thank you so much for your good wishes. I greatly appreciate your love and support.
Keep Learning, Keep Sharing.
Bhai tum marketing thodi kam karo ... education ko marketing ki kuch jarurat nahi ...my honest review
Free me jitna mil Raha le lo thoda bhut to sabhi karte h bhai
Bhht Zbrdast samjhaty hen ap log Civil Guru G walay Chah gaye
Sir your teaching method is great ...God bless you
Thank you very much for your Love and Support . I appreciate your expression of support and goodwill. Let us continue to learn and share knowledge together.
Sir itne teachers ka video dkha h maine lkn aap ka samjhane ka tareeqa bht bht bht zabardast h sir.
Thanku so mch sir..itna easily apne ache se smjha dia ...you are best teacher in civil engineering sir....thanku so mch sir..🙏🙂🙂
Aap इंजीनियर हो क्या
Hello sir
@@जयश्रीराम-त2र qq QQ qqqqqq QQ qqqqqqqqqqqqqqqqqqqqqqqqq hu ki q QQ q ki qq QQ q QQ QQ q qq hu q
Total steel use in footing=428kg
Hi
Gajab, 👍, m not diploma holder, but earning bread for my family due to your videos. Salute
Hello Sandeep Dogra
Thank you so much for your good wishes. I greatly appreciate your love and support.
Keep Learning, and Keep Sharing.
sir great work i mean unmatchable sir they way you delivered the lecture dil se respect guruji
love from neighboring country
Qadir thank you 👍 keep learning keep sharing
👍
Thank you very much sir,
Ye collage vale bhi itna shanti se nahi samjhate jitna aap ne samjhaya hai ,, thanks alot sir,❤❤❤❤
Thank you! Aapka pyaar humein aur bhi zyada inspire karta hai! Hamara lakshya hamesha se yahi tha ki hamara content aap tak sahi tareeke se pahunchaye aur aapko samajh mein aaye.
Now this is called a Quality Content ❤️👷
Thank you
ironman
Hame bohat khusi hai ki aapko hamari mehnat pasand aai , Civilguruji isi tarah civil engineers ko aage badane ke liye mehnat karte rahega aur aap bhi knowledge dusro ko share karte rahe.
KEEP LEARING, KEEP SHARING.
Bahot hi umda video sir jee maza aa gaya 👍👍👍👍
Very good Trainer ,fantastic thank you.
सर् नमस्ते आपने बहुत ही अच्छी तरह आपने एक्सप्लेन किया आपका बहुत बहुत धन्यवाद 💐💐👏👏👏👏👏
the best platform to learn civil engineering skills ..lots of love and respect from pakistan kpk..
Bohot hi clear samjhaye ho sir. Dimag me chap gai calculation.
Number of bars along the B direction= 9 nos
Cutting length along A direction=1.65 meter
100mm bend
Cutting length along B direction=1.62 meter
88mm bend
Total Steel quantity=209kg.
Total amount of steel @50=Rs.10,450Rs
Binding wire =2.9Kg.
Gd evening sir.. I am manish from bihar... I am diploma holder... I am big fan of u and for civil gurujii platform..
Footing f2 = 8 nos
To find :-
Cutting length :- A direction :- 1.55 meter.
B direction :- 1.52 meter.
Total weight :- 218.24 kg
Total amount if rate rs 50/kg :- 10912rs
Binding wire:- 2.18 kg..
F2 cutting length direction A along a bar=1.552 m
Cutting length direction B along a baar = 1.528m
Total weight of steel=219kg
Total amount rate according to 50/kg= 10950
Great
Good
Wrong ha tumhara tolal-224 kg h
Hi
Please explain me this
I think in this group you are the super duper sir nice your teaching style than others
We appreciate your recognition of our hard work, Civil Guruji Isi tarah Civil Engineers Ke liye Content laate rahega.
Keep Learning, Keep Supporting.
Sir im from nepal I really want to teach alot im in starting point but here isnt any those kind of insut sir
Cutting length of bar along A direction=1.55m
Cutting length of bar along B direction=1.52m
Total weight of steel=219Kg
Total amount if rate Rs 50/kg=Rs10950
Binding wire 1% of total weight of steel=2.19kg
Asif well done very good your answer is correct✅ keep learning keep sharing😊
@@दुश्मन-ठ9श 24 kaise hoga
Cutting length of bar along A direction=1.552 m
Cutting length of bar along B direction=1.528m
Total weight of steet=219kg
cost of total steel @50rs/kg=10950 Rs
Binding wire=2.19 kg
Total wt. Of steel in 8 footing=197.14kg hoga
Total weight of steel = 224 kg
MIND BLOWING SIR.....YOUR TEACHING IS SUPERBLY BRILLIANT AND BRILLIANT AND BRILLIANT......BLESSINGS FROM INDIA GUJARAT.......🙏🙏🙏🙏🙏
Your explanation is outstanding sir
Please upload a video on BBS of Staircase
Angshuman sure my next video will be on Staircase... keep sharing for training call 9111001234
👍
Binding wire is 2.24kg
Total wt of steel in footing is 224kg
Total cost of footing is 11200rs@ 50rs/kg
Cutting length A is 1.55m
..........................B is 1.54m
Total no.Of steel along A@B is 20nos.
Is right sir and thankyou very much civil guruji...
You are awesome, mind-blowing, outstanding, miraculous, prodigious, wonderful, amezing love you sir❤️❤️
Thank you keep learning keep sharing
Jabrdast 👍👍
Glad you found the video informative.
C.L of Bar A- 1.55m
C.L of Bar B- 1.53m
For 8 footing:---
Total steel qty. = 219kg
Unit rate of ofsteel = 60/kg
Total cost of steel= 219*60=13140/-
Contigencies binding wire =2.19kg
Unit rate of binding wire= 70/kg
Total cost of binding wire= 2.19*70= 153.30/-
So total cost of 8 F2 footing on steel +binding wire= 13293.30/-
Sir labour ka kya rate hota h cutting +binding ka is pr v bataye.
Unit
Jitendra very good your answer is correct✅ and bilkul apki demand par mai video banaunga👍 keep learning keep sharing 😊😊
Sir ek video feet me bataye
Total steel quantity-224 hogi sir
No. Of Bar= 10 NOS in A direction and 10NOS in B Direction.
Cutting length in A direction= 1.552
Cutting length in B direction= 1.540
Total wt. In 1 Footing= 27.487
If 8 No. Of Footing then Total wt of all footing is = 220
Total Amount = 11,000 Rs
🙏Thanks for this lacture Dir
Bhai f2 me d1 or d2 200 or 100 h konsa wala lena h
Cutting Length = 1.55 &1.52m
Total weight = 224 kg
Total amount = 11,200 Rs
Binding wire = 2.24 kg
☺Thank you Sir.।।।।
Akash Bohare Sir 👍👍👍👍👍👍👍 explanation outstanding 🙏🙏🙏🙏🙏❤️❤️❤️❤️❤️
Sadik thank you for your support 👍 keep learning keep sharing😊😊
F2 footing total steel 480kg
Akash bahore sir very nice video
Sir mera ek question hay
What is the importance of Bill of steel and how much Percentage it should be of the total amount of building??
Thanks sir itna easily se apna question ko samjhya sir very good sir
Thank you
ASADULLAH
Hame bohat khusi hai ki aapko hamari mehnat pasand aai , Civilguruji isi tarah civil engineers ko aage badane ke liye mehnat karte rahega aur aap bhi knowledge dusro ko share karte rahe.
KEEP LEARING, KEEP SHARING.
cutting length of bar A=1.65
cutting length of bar B=1.62
Total weight of steel=227kg
Total amount if rate Rs 50/kg =11376
Binding wire 1% of total weight of steel=2.27
d is 200 mm given
d is 200 mm given
Best RUclips channel for civilians
Nos of bar in both direction =10, 10
C. L of RA=1.55
C. L of RB=1.52
Wt of steel in A direction=13.77
Wt of steel in B direction=13.51
Total Wt of one Footing=28 Kg
Total Wt of F2 Footing=28*8=224 Kg
Unit rate of steel=60 Rs/kg
Total amount of steel=13440
Contingency of binding wire=2.24kg
Please check and mention correct Or not
Same bro
Same
You are absolutely correct 👍
1.528 ko 1.53 kyu nahi liya
Very nice बहुत बहुत धन्यवाद भाई साहब हमेशा खुश रहो मुसकुराते रहो
CL in A-dir = 1.55
CL in B-dir = 1.53
Total wt of steel = 219 Kg
Binding wire = 2.19 Kg
Total Amount = 12387 Rs , If rate @56Rs/Kg
Aap kamal hoo sir thank you so much .Kitna easily understand karwaya .
basic slab thumb rule pdf dijiye na plsss...
Thankyou sir,
First time see easily you clearly BBS
Poore house ke bbs kaise calculate kare Saare topics pe videos banao sir
Humko Samjhe me Aa raha hai sab bahot ache se
Sure aap ke iss Question ko hum Apne Expert trainer ko share karange orr bahut jald iss topic par video layenge.
Thank you so much you are the best teacher in civil engineering
Bahot badhiya guruji thank you so much ❤❤❤❤❤
@rixgamer5748 Thank you so much! 🙏❤
MOST VALUABE INFORMATION ABOUT BBS
No one provide us such type of knowledge.
CIVIL GURUJI is the best platform to gain those skills.
THANKS YOU SO MUCH SIR AND YOUR TEAM.
LOVE YOU FROM ODISA SIR.❣
Dabol jali L lenth theory,
F2 footing
Cutting length of A axis = 1.55 m
Cutting length of B axis = 1.52 m
Total weight = 224 kg
Total amount = 11200 rupees
Binding wire = 2.24 kg
Thank you so sir 💕
Total amount @ rate 50 = 11200 rupees
What wastage parcentage will be added
Estimation and valuation ke free lecture leke aao Bo bhi practical data ke ...
Thanku so mch sir....itne easily apne ache se smjha Dia..
Welcome
Kishan Thakur
Hame bohat khusi hai ki aapko hamari mehnat pasand aai , Civilguruji isi tarah civil engineers ko aage badane ke liye mehnat karte rahega aur aap bhi knowledge dusro ko share karte rahe.
KEEP LEARING, KEEP SHARING.
Very good teacher I will be using your teaching when I will start building construction work thanks
Best Teacher In The Family 💯
Bahut badhiya batate hai aap thank u so much god bless you
Thank u so bahut Achcha samajh Gaye
Sirji bahot badiya video
Thank you
Nitin Gaikwad
Hame bohat khusi hai ki aapko hamari mehnat pasand aai , Civilguruji isi tarah civil engineers ko aage badane ke liye mehnat karte rahega aur aap bhi knowledge dusro ko share karte rahe.
KEEP LEARING, KEEP SHARING.
Bar A = 1.55 MTR
Bar B = 1.52 MTR
TOT W = 224 KG
TOT AMT = 11200 RUPEES
BINDING WIRE = 2.24 KG
Tnk u so much sir 🙏🏻
Video asi bnao k 4 log ek hi bar me sikh jay slam h sir ❤
Thank you very much for your kind words. I appreciate your expression of support and goodwill. Let us continue to learn and share knowledge together.
Number of bar = 10 Nos
Cutting length along A direction = 1.55 M
Cutting length along B direction = 1.52 M
Total steel of Quantity = 224 KG
Total amount of steel As per Rs.50 in 1 KG = Rs.11,200
Bending wire = 2.24 KG
F2 footing total weight 200kg
Binding wire 2kg
CL a direction= 1.55m
CL b direction= 1.53m
No.of bar a direction =9 nos
No.of bar b direction= 9nos
excellent calculation of number of one footing bars , cutting length & weight 👍👍#
Thanku so much for this video sir ,
Today I have learn how to find BBS Footing
Tq soo much sir... Realy clear coaching... 🙏🙏🙏
Sir ek interview vedio dalo...jo steel concreat footing or pile foundation or maintainess work pr ho 10to15 question in one video..
thank you so much for such a correct and easy understanding video
Thank you sir best teacher bhuta ache se samjha m aay sir mujhe drawing se quantity nikalna shikha na hai
Extra ordinary video hai sir...
Thank you to Civil Guruji.🙏
Sir column ke upar aisi hi interesting video leke aaiye 🙏please
Sure 😈 Demon
Humne apke request ko apne expert trainer ke sath share karenge aur bahut jald iss topic par hum video lnayenge.
Nice video sir telling our national language is good but some body don't know Hindi sir if possible tell in english also sir
Very easy to understand...hats off sir
Learn a lot from u Sir,hope I can learn much from ur videos
sir intehayee behtareen video likin ap quantity course ka keh rahe hai o to sirf india mai hai ap please qs course videos mai upload karo taa k hm pakistan mai bhi fayeda othayen thankyou
Hello @JBAssociates93
QS ka course all over in word me available hai.
Aap hume 9111001234 par whatsapp message kijiye hamari team aapki help kar dengi.
Best teacher in on RUclips 🙏🙏🙏
Excellent work..
Very helpful video..
Keep going
Sir practically karte hue acche se samajh mein aata
Fill this Form :-forms.gle/ZVSSrwRfrPzf2QyV8 or Give us a Call On 9111001234. Our Team Will help you.
Bahot achchha jankari di sir aap ney Sukriya
Bahut shandaar 👏👏👏
Thanks Sir god bless you from Nepal
Thank you so much for your good wishes. I greatly appreciate your love and support.
Bhut hi shandar 👏👏👏👏
Thank you keep sharing keep learning 👍👍 for training call 9111001234
yrr ap bht acha samjhty ho
Thank you
Nafees Kiyani
Hame bohat khusi hai ki aapko hamari mehnat pasand aai , Civilguruji isi tarah civil engineers ko aage badane ke liye mehnat karte rahega aur aap bhi knowledge dusro ko share karte rahe.
KEEP LEARING, KEEP SHARING.
Or sab aapne bhut ache se samjaaya thanks
Bahut mast hai ❤❤❤ badhiya hai 👍👌👌👌👌❤❤❤
Thank you! 😊❤️ Itni acchi feedback milke sach mein khushi hui! Aise hi support karte raho, aur hum aur bhi zyada mast content lekar aayenge. Stay tuned! 🙌🎉
Congratulations super work continues to make videos good knowledge
Thank you Gurujiiii.... Please explain sir how to calculate renforcement bars for double mesh footing...
Most Welcome Sπ@y@₹!🤩
Hum bahut Jald Is topic par video layenge. Stay Tuned
Bahut achha samjhate ho aap
Super excellent 💥💥💥 got to learn which clg doesn't teach
No of bars for A =10 for B =10
Cutting length for A=1.56, for B= 1.53
Total steel =(8×27.47)=219.76kg
Thank you so much sir gud information and good teaching sir
Hello Ram Paila
Thank you so much for your good wishes. I greatly appreciate your love and support.
Keep Learning, Keep Sharing.
thank u sir acche se samajh aa gya
Most welcome @CivilWalla-gc5rb
Agar koi sawal ya suggestion ho to jarur btaiye.
The video has been made in a very beautiful way
Thank you so much sir vry nice teaching
Thank you so much sir.... very very clear and exalant video sir... thank you very much sir
bht achi video the. achy sy samj aya
Bahut achha sir 👍👍
God bless you sir 🙏🙏🙏
Thank you very much for your Love and Support . I appreciate your expression of support and goodwill. Let us continue to learn and share knowledge together.
1-F2 footing ke liye steel 25.51kg
2- cutting length Ra ke liye 1.45 m and Rb ke liye 1.42 m
3- total number of bar footing F2 ke liye 20
4 - bending wire 2.04kg F2 ke liye
very very important video
thank u for making this video
sir
Pk motivation welcome for your valuable words... It motivates us keep learning keep sharing 😊
Very useful videos thank🌹 you sir
Keep watching
very good sir.... keep teaching......
16:50 cutting length of bar B
=1700+2×(250-50-50)-(2×2×12)-12
=1940mm
Why you take 2×time minus 12mm dia bar? It is placed only in bottom not top so simply it is minus by 12.