Bar Bending Schedule of Footing - How to Calculate Quantity of Steel in RCC Footing? By CivilGuruji

Поделиться
HTML-код
  • Опубликовано: 26 июл 2021
  • #RCC #Footing #Calculation #BBS Steel
    Bar Bending Schedule of Footing - How to Calculate Quantity of Steel in RCC Footing?
    Start Your TRAINING NOW
    Enroll and get started :- www.civilguruji.com/s/store/c...
    Download Detailed PDF : tinyurl.com/PracticalModule
    For More Details Call Now : 9111001234
    ABOUT THIS VIDEO :-
    In this video Er. Akash Bohare, Corporate Trainer of Civil Guruji (Civil Engineers Training Institute) explaining about Bar Bending Schedule of Footing - How to Calculate Quantity of Steel in RCC Footing?
    Bar bending schedule (BBS) of an concrete footing provides the reinforcement details and the total steel quantity required for the footing construction. The BBS and quantity of steel reinforcement required for a simply isolated footing are calculated and explained by means of a workout example.
    Bar Bending Schedule of Footing - How to Calculate Quantity of Steel in RCC Footing?
    The cross-sectional plan and section of an isolated footing. The details of reinforcement used in the footing are calculated from the detailed drawing of the structure prepared by the designer. The structural drawing provides the reinforcement location and their specifications.
    Bar Bending Schedule of Footing - How to Calculate Quantity of Steel in RCC Footing?
    From the figure, the following parameters are determined:
    Number of Main Reinforcement Bars ( X-Bars)
    Number of Distribution Reinforcement Bars ( Y-Bars)
    Cutting Length of Main Reinforcement Bars (Cm)
    Cutting Length of Distribution Reinforcement Bars (Cd)
    Steel Quantity Required
    Bar Bending Schedule of Footing - How to Calculate Quantity of Steel in RCC Footing?
    From the given details, the following values are calculated: 1. Calculation of Number of Main Reinforcement (X- Bars) From the figure-1(c), the x-bars are distributed along the y-direction. Hence the number of bars

Комментарии • 887

  • @nationalgeography..7654
    @nationalgeography..7654 Год назад +4

    the best platform to learn civil engineering skills ..lots of love and respect from pakistan kpk..

  • @accsltd6978
    @accsltd6978 2 года назад +2

    भाई तू सचमुच गरीबों का गुरू है !
    1 हिन्दी में समझाता है, 2 वीडियो यूट्यूब पर उपलब्ध कराता है, 3 इतना धीरज से और आसान तरीके से हरेक बारीकी समझाता है, 4 एक दसवीं बारहवीं पास हैल्पर मजदूर को भी इन्जीनियर जितना योग्य बना देता है, 5 पैसे नहीं होने से पढाई छोड़ चुका मुझ जैसा बालक तेरे इन वीडियो को देख समझकर आज बुढापे में इन्जीनियर की पढाई कर पा रहा है ।
    सादर पाँव धोक ! पैरी पौना ! चरण-स्पर्श गुरू जी ! 🙏🙏🙏

  • @neetuarya9432
    @neetuarya9432 2 года назад +71

    Thanku so mch sir..itna easily apne ache se smjha dia ...you are best teacher in civil engineering sir....thanku so mch sir..🙏🙂🙂

    • @user-wp9nw4xk1q
      @user-wp9nw4xk1q 2 года назад +1

      Aap इंजीनियर हो क्या

    • @rajuray3978
      @rajuray3978 2 года назад

      Hello sir

    • @AzamKhan-hk4sf
      @AzamKhan-hk4sf 2 года назад

      @@user-wp9nw4xk1q qq QQ qqqqqq QQ qqqqqqqqqqqqqqqqqqqqqqqqq hu ki q QQ q ki qq QQ q QQ QQ q qq hu q

    • @arvindmandal9080
      @arvindmandal9080 2 года назад

      Total steel use in footing=428kg

    • @rambabupillala491
      @rambabupillala491 2 года назад

      Hi

  • @MrYusufaamir
    @MrYusufaamir 2 года назад

    Sir itne teachers ka video dkha h maine lkn aap ka samjhane ka tareeqa bht bht bht zabardast h sir.

  • @nirmalupadhyay4548
    @nirmalupadhyay4548 2 года назад +2

    MIND BLOWING SIR.....YOUR TEACHING IS SUPERBLY BRILLIANT AND BRILLIANT AND BRILLIANT......BLESSINGS FROM INDIA GUJARAT.......🙏🙏🙏🙏🙏

  • @pawanchoudhary777
    @pawanchoudhary777 2 года назад +47

    Cutting length along A direction=1.55 meter
    Cutting length along B direction=1.53 meter
    Total Steel quantity=224kg.
    Total amount of steel @50=Rs.11200
    Binding wire =2.24Kg.

    • @Er_anit
      @Er_anit Год назад +1

      same here dear same answer

    • @ashrafhaider2152
      @ashrafhaider2152 Год назад

      hahahah

    • @user-bd3en4fc4w
      @user-bd3en4fc4w 9 месяцев назад

      Bai app ko 48 mm subtract krna tha app ny 48 mm ki jaga 480 mm subtract kr dia Hy 😊😊

    • @deepakkumarnagar7041
      @deepakkumarnagar7041 5 месяцев назад

      Love you 🎉 Bhai

    • @sachinraj9897
      @sachinraj9897 5 месяцев назад

      Sir please elaborate how it comes

  • @Askmepuzzles
    @Askmepuzzles 4 месяца назад +17

    Bhai tum marketing thodi kam karo ... education ko marketing ki kuch jarurat nahi ...my honest review

    • @brajeshrajak7899
      @brajeshrajak7899 20 дней назад

      Free me jitna mil Raha le lo thoda bhut to sabhi karte h bhai

  • @azizulgani3313
    @azizulgani3313 2 года назад +4

    Very good Trainer ,fantastic thank you.

  • @abcdefgh8127
    @abcdefgh8127 2 года назад +2

    सर् नमस्ते आपने बहुत ही अच्छी तरह आपने एक्सप्लेन किया आपका बहुत बहुत धन्यवाद 💐💐👏👏👏👏👏

  • @user-qu1vg2yz6o
    @user-qu1vg2yz6o 7 месяцев назад +4

    Sir your teaching method is great ...God bless you

    • @Civil_Guruji
      @Civil_Guruji  7 месяцев назад +1

      Thank you very much for your Love and Support . I appreciate your expression of support and goodwill. Let us continue to learn and share knowledge together.

  • @mohammadmughal7000
    @mohammadmughal7000 Год назад

    Very good teacher I will be using your teaching when I will start building construction work thanks

  • @ErShaikhAltamash
    @ErShaikhAltamash 2 месяца назад +2

    Thank you very much sir,
    Ye collage vale bhi itna shanti se nahi samjhate jitna aap ne samjhaya hai ,, thanks alot sir,❤❤❤❤

    • @Civil_Guruji
      @Civil_Guruji  2 месяца назад

      Thank you! Aapka pyaar humein aur bhi zyada inspire karta hai! Hamara lakshya hamesha se yahi tha ki hamara content aap tak sahi tareeke se pahunchaye aur aapko samajh mein aaye.

  • @mohammadasad6341
    @mohammadasad6341 2 года назад +1

    Is video me jo bhi aapne bataya wo mujhe phle se pata h ..Lekin aap itna acche se batate ho ki maine apka pura video dekha... Good job sir 🙏

    • @Civil_Guruji
      @Civil_Guruji  2 года назад +1

      Asad thank you for your words it motivates to make more video.. 👍 keep learning keep sharing 😊

  • @nehanigam1355
    @nehanigam1355 Год назад

    Thank you so much you are the best teacher in civil engineering

  • @sadikali1986
    @sadikali1986 2 года назад +2

    Akash Bohare Sir 👍👍👍👍👍👍👍 explanation outstanding 🙏🙏🙏🙏🙏❤️❤️❤️❤️❤️

    • @Civil_Guruji
      @Civil_Guruji  2 года назад

      Sadik thank you for your support 👍 keep learning keep sharing😊😊

    • @gbshivashiva5346
      @gbshivashiva5346 Год назад

      F2 footing total steel 480kg

  • @laiqueahamadkhan9688
    @laiqueahamadkhan9688 2 года назад

    Thankyou sir,
    First time see easily you clearly BBS

  • @princedaharwal2015
    @princedaharwal2015 2 года назад +1

    No. Of Bar= 10 NOS in A direction and 10NOS in B Direction.
    Cutting length in A direction= 1.552
    Cutting length in B direction= 1.540
    Total wt. In 1 Footing= 27.487
    If 8 No. Of Footing then Total wt of all footing is = 220
    Total Amount = 11,000 Rs
    🙏Thanks for this lacture Dir

  • @sandeepdogra4058
    @sandeepdogra4058 Год назад +1

    Gajab, 👍, m not diploma holder, but earning bread for my family due to your videos. Salute

    • @Civil_Guruji
      @Civil_Guruji  Год назад

      Hello Sandeep Dogra
      Thank you so much for your good wishes. I greatly appreciate your love and support.
      Keep Learning, and Keep Sharing.

  • @manojsahoo8833
    @manojsahoo8833 2 года назад +4

    Best teaching of Bbs in Utube.. Outstanding sir.. Please upload Beam,column, staircase, slab

  • @skramizzaman1498
    @skramizzaman1498 2 года назад

    The video has been made in a very beautiful way

  • @rohankamate8857
    @rohankamate8857 2 года назад +1

    Best Teacher In The Family 💯

  • @rambinaydas
    @rambinaydas Год назад

    Thank you sir... 3-4 Lakh deke college/Institute me vi itna easy way me nhi sikhata hai... Love you sir

  • @ermanishwarsi3584
    @ermanishwarsi3584 2 года назад

    Hello Sir gd evening.. I hope you Will good .. Very knowledgeable video sir... Thanks for giving this information sir.. God bless u 🙂

  • @arfatayoub3239
    @arfatayoub3239 2 года назад

    Aap kamal hoo sir thank you so much .Kitna easily understand karwaya .

  • @kapilsardar8780
    @kapilsardar8780 2 года назад

    Bohot hi clear samjhaye ho sir. Dimag me chap gai calculation.

  • @vivek22721
    @vivek22721 Год назад

    Very nice बहुत बहुत धन्यवाद भाई साहब हमेशा खुश रहो मुसकुराते रहो

  • @andythebotgamming4850
    @andythebotgamming4850 2 года назад

    Best teacher in on RUclips 🙏🙏🙏

  • @shadabakhtar4566
    @shadabakhtar4566 2 года назад

    Thanku so much for this video sir ,
    Today I have learn how to find BBS Footing

  • @jmzcye5920
    @jmzcye5920 8 месяцев назад

    Learn a lot from u Sir,hope I can learn much from ur videos

  • @rahulgoswami8318
    @rahulgoswami8318 Год назад

    Thank you sir ji for helping me to clear the Concept ❤️😁

  • @ironman2600
    @ironman2600 Год назад +4

    Now this is called a Quality Content ❤️👷

    • @Civil_Guruji
      @Civil_Guruji  Год назад +2

      Thank you
      ironman
      Hame bohat khusi hai ki aapko hamari mehnat pasand aai , Civilguruji isi tarah civil engineers ko aage badane ke liye mehnat karte rahega aur aap bhi knowledge dusro ko share karte rahe.
      KEEP LEARING, KEEP SHARING.

  • @sadikali1986
    @sadikali1986 2 года назад

    Sir your explanation is outstanding

  • @hashimabbas3238
    @hashimabbas3238 Год назад +1

    Good job sir apki waja say bahoot information hasil hoi
    From Pakistan 😍

    • @Civil_Guruji
      @Civil_Guruji  Год назад

      Hello Hashim Abbas
      Thank you so much for your good wishes. I greatly appreciate your love and support.
      Keep Learning, Keep Sharing.

  • @sunilwaghmare6985
    @sunilwaghmare6985 Год назад

    Thank you to Civil Guruji.🙏

  • @upadhyaysurya8
    @upadhyaysurya8 2 года назад

    Bahut badhiya batate hai aap thank u so much god bless you

  • @kishorekondagori1848
    @kishorekondagori1848 2 года назад

    Tq soo much sir... Realy clear coaching... 🙏🙏🙏

  • @ziauddin7948
    @ziauddin7948 Год назад

    excellent calculation of number of one footing bars , cutting length & weight 👍👍#

  • @ManojKumar-gt4ct
    @ManojKumar-gt4ct 2 года назад

    Sir you are very good trainer .
    Thank u very much .
    Dowel bar in column to footing for more load transfer .,is it provide or not if provide
    How to cutting and place
    One video pls .thanks again

  • @creativehomedesign5065
    @creativehomedesign5065 2 года назад

    Best RUclips channel for civilians

  • @ermanishwarsi3584
    @ermanishwarsi3584 2 года назад

    Gd evening sir.. I am manish from bihar... I am diploma holder... I am big fan of u and for civil gurujii platform..
    Footing f2 = 8 nos
    To find :-
    Cutting length :- A direction :- 1.55 meter.
    B direction :- 1.52 meter.
    Total weight :- 218.24 kg
    Total amount if rate rs 50/kg :- 10912rs
    Binding wire:- 2.18 kg..

  • @maharashtrachishantabai5036
    @maharashtrachishantabai5036 2 года назад +3

    You are awesome, mind-blowing, outstanding, miraculous, prodigious, wonderful, amezing love you sir❤️❤️

    • @Civil_Guruji
      @Civil_Guruji  2 года назад +3

      Thank you keep learning keep sharing

  • @mukeshpargi8089
    @mukeshpargi8089 3 месяца назад +1

    Thank u so bahut Achcha samajh Gaye

  • @erranjankumar1660
    @erranjankumar1660 8 месяцев назад

    Congratulations super work continues to make videos good knowledge

  • @dhirajlonare5614
    @dhirajlonare5614 Год назад +1

    Bar A = 1.55 MTR
    Bar B = 1.52 MTR
    TOT W = 224 KG
    TOT AMT = 11200 RUPEES
    BINDING WIRE = 2.24 KG
    Tnk u so much sir 🙏🏻

  • @g.qadirbadini5345
    @g.qadirbadini5345 2 года назад +3

    sir great work i mean unmatchable sir they way you delivered the lecture dil se respect guruji
    love from neighboring country

  • @md.arifazam5525
    @md.arifazam5525 2 года назад +1

    Bahot hi umda video sir jee maza aa gaya 👍👍👍👍

  • @aashishgondhali4418
    @aashishgondhali4418 Год назад +4

    Number of bars along the B direction= 9 nos
    Cutting length along A direction=1.65 meter
    100mm bend
    Cutting length along B direction=1.62 meter
    88mm bend
    Total Steel quantity=209kg.
    Total amount of steel @50=Rs.10,450Rs
    Binding wire =2.9Kg.

  • @YTacademySantoshalawe
    @YTacademySantoshalawe Год назад

    Binding wire is 2.24kg
    Total wt of steel in footing is 224kg
    Total cost of footing is 11200rs@ 50rs/kg
    Cutting length A is 1.55m
    ..........................B is 1.54m
    Total no.Of steel along A@B is 20nos.
    Is right sir and thankyou very much civil guruji...

  • @amlan9322
    @amlan9322 2 года назад

    Than Q for ur information. At time 14.31, kindly ud u mention the internal distance of U bar. So that it will be more clear.

  • @ASADULLAH-px3qw
    @ASADULLAH-px3qw Год назад +1

    Thanks sir itna easily se apna question ko samjhya sir very good sir

    • @Civil_Guruji
      @Civil_Guruji  Год назад

      Thank you
      ASADULLAH
      Hame bohat khusi hai ki aapko hamari mehnat pasand aai , Civilguruji isi tarah civil engineers ko aage badane ke liye mehnat karte rahega aur aap bhi knowledge dusro ko share karte rahe.
      KEEP LEARING, KEEP SHARING.

  • @mukeshsah8004
    @mukeshsah8004 2 года назад

    You explain amazingly sir

  • @hiteshdadlani4572
    @hiteshdadlani4572 2 года назад

    Kindly make a video for high rise buildings and also about best practices to make a basement from excavation to waterproofing

  • @kaminee7300
    @kaminee7300 15 дней назад

    Cutting along A direction 1.65
    Cutting along B direction 1.62
    No of bars along A direction 10
    No of bars along B direction 10
    Total weight 232.4 kg
    Weight of binding wires 2.32 kg

  • @jdgamipatel
    @jdgamipatel 2 года назад

    Very easy to understand...hats off sir

  • @Happyvideo52
    @Happyvideo52 2 года назад

    Very Helpfull video
    Thanks a lot sir❤❤

  • @krishnamayakarki6924
    @krishnamayakarki6924 11 месяцев назад +1

    I think in this group you are the super duper sir nice your teaching style than others

    • @Civil_Guruji
      @Civil_Guruji  11 месяцев назад +1

      We appreciate your recognition of our hard work, Civil Guruji Isi tarah Civil Engineers Ke liye Content laate rahega.
      Keep Learning, Keep Supporting.

    • @krishnamayakarki6924
      @krishnamayakarki6924 11 месяцев назад

      Sir im from nepal I really want to teach alot im in starting point but here isnt any those kind of insut sir

  • @rajhadale5594
    @rajhadale5594 2 года назад

    Super excellent 💥💥💥 got to learn which clg doesn't teach

  • @AD13D
    @AD13D 8 месяцев назад

    Superbly explained....

  • @shahabazkhan210
    @shahabazkhan210 Год назад +2

    F2 footing
    Cutting length of A axis = 1.55 m
    Cutting length of B axis = 1.52 m
    Total weight = 224 kg
    Total amount = 11200 rupees
    Binding wire = 2.24 kg
    Thank you so sir 💕

  • @pk.pavankumar7320
    @pk.pavankumar7320 2 года назад +1

    very very important video
    thank u for making this video
    sir

    • @Civil_Guruji
      @Civil_Guruji  2 года назад +1

      Pk motivation welcome for your valuable words... It motivates us keep learning keep sharing 😊

  • @Jaishreeram8077katarhindu
    @Jaishreeram8077katarhindu 2 года назад

    Thank you sir best teacher bhuta ache se samjha m aay sir mujhe drawing se quantity nikalna shikha na hai

  • @nafeeskiyani2559
    @nafeeskiyani2559 Год назад +1

    yrr ap bht acha samjhty ho

    • @Civil_Guruji
      @Civil_Guruji  Год назад

      Thank you
      Nafees Kiyani
      Hame bohat khusi hai ki aapko hamari mehnat pasand aai , Civilguruji isi tarah civil engineers ko aage badane ke liye mehnat karte rahega aur aap bhi knowledge dusro ko share karte rahe.
      KEEP LEARING, KEEP SHARING.

  • @CivilWalla-gc5rb
    @CivilWalla-gc5rb 3 месяца назад +1

    thank u sir acche se samajh aa gya

    • @Civil_Guruji
      @Civil_Guruji  3 месяца назад

      Most welcome @CivilWalla-gc5rb
      Agar koi sawal ya suggestion ho to jarur btaiye.

  • @Bloodysanthosh_07
    @Bloodysanthosh_07 Год назад

    Thank you so much sir.... very very clear and exalant video sir... thank you very much sir

  • @sureshYadav-jw8pg
    @sureshYadav-jw8pg Год назад

    Sir practically karte hue acche se samajh mein aata

    • @Civil_Guruji
      @Civil_Guruji  Год назад

      Fill this Form :-forms.gle/ZVSSrwRfrPzf2QyV8 or Give us a Call On 9111001234. Our Team Will help you.

  • @JBAssociates93
    @JBAssociates93 11 дней назад +1

    sir intehayee behtareen video likin ap quantity course ka keh rahe hai o to sirf india mai hai ap please qs course videos mai upload karo taa k hm pakistan mai bhi fayeda othayen thankyou

    • @Civil_Guruji
      @Civil_Guruji  11 дней назад

      Hello @JBAssociates93
      QS ka course all over in word me available hai.
      Aap hume 9111001234 par whatsapp message kijiye hamari team aapki help kar dengi.

  • @angshumandebnath1035
    @angshumandebnath1035 2 года назад +4

    Your explanation is outstanding sir
    Please upload a video on BBS of Staircase

    • @Civil_Guruji
      @Civil_Guruji  2 года назад +1

      Angshuman sure my next video will be on Staircase... keep sharing for training call 9111001234

    • @civilsitetechniques
      @civilsitetechniques Год назад

      👍

  • @anjalivyas7242
    @anjalivyas7242 2 года назад +23

    F2 cutting length direction A along a bar=1.552 m
    Cutting length direction B along a baar = 1.528m
    Total weight of steel=219kg
    Total amount rate according to 50/kg= 10950

  • @navneetkhale286
    @navneetkhale286 2 года назад

    Bahut achha samjhate ho aap

  • @ROYALkiNG-gr3rc
    @ROYALkiNG-gr3rc 11 месяцев назад +2

    To find
    Answer.
    1) Cutting length = 1.65m
    2) Cutting length = 1.62m
    3) Total weight = 232.56kg
    4) Total amount = 11,628₹
    5) Binding wire = 2.32kg

  • @m.asifsanghi6055
    @m.asifsanghi6055 2 года назад +25

    Cutting length of bar along A direction=1.55m
    Cutting length of bar along B direction=1.52m
    Total weight of steel=219Kg
    Total amount if rate Rs 50/kg=Rs10950
    Binding wire 1% of total weight of steel=2.19kg

    • @Civil_Guruji
      @Civil_Guruji  2 года назад +7

      Asif well done very good your answer is correct✅ keep learning keep sharing😊

    • @faizansk298
      @faizansk298 2 года назад

      @@user-me5iz8ge1c 24 kaise hoga

    • @aftabalamansari8722
      @aftabalamansari8722 2 года назад

      Cutting length of bar along A direction=1.552 m
      Cutting length of bar along B direction=1.528m
      Total weight of steet=219kg
      cost of total steel @50rs/kg=10950 Rs
      Binding wire=2.19 kg

    • @Sanjaykumar-zf8ip
      @Sanjaykumar-zf8ip 2 года назад

      Total wt. Of steel in 8 footing=197.14kg hoga

    • @pk-fk5zj
      @pk-fk5zj 2 года назад +3

      Total weight of steel = 224 kg

  • @MustakimKhan-hu9du
    @MustakimKhan-hu9du 2 года назад

    Bahot achchha jankari di sir aap ney Sukriya

  • @alrazshakil
    @alrazshakil 2 года назад +1

    Excellent work..
    Very helpful video..
    Keep going

  • @samiullhasami4077
    @samiullhasami4077 2 месяца назад

    Sir g main na footings part b ki quantity nekale hain app check kera ka ok hain yah nehi

  • @ashiglop2737
    @ashiglop2737 2 года назад +1

    MOST VALUABE INFORMATION ABOUT BBS
    No one provide us such type of knowledge.
    CIVIL GURUJI is the best platform to gain those skills.
    THANKS YOU SO MUCH SIR AND YOUR TEAM.
    LOVE YOU FROM ODISA SIR.❣

  • @kishanthakur6054
    @kishanthakur6054 Год назад +1

    Thanku so mch sir....itne easily apne ache se smjha Dia..

    • @Civil_Guruji
      @Civil_Guruji  Год назад

      Welcome
      Kishan Thakur
      Hame bohat khusi hai ki aapko hamari mehnat pasand aai , Civilguruji isi tarah civil engineers ko aage badane ke liye mehnat karte rahega aur aap bhi knowledge dusro ko share karte rahe.
      KEEP LEARING, KEEP SHARING.

  • @thengbon84
    @thengbon84 2 года назад

    Interesting information sir. Luff it.

  • @girishsgowda5457
    @girishsgowda5457 2 года назад

    Plz make video about..BBS of different types of stirups in column

  • @prasantkumarbhoi8207
    @prasantkumarbhoi8207 3 месяца назад +1

    Bahut mast hai ❤❤❤ badhiya hai 👍👌👌👌👌❤❤❤

    • @Civil_Guruji
      @Civil_Guruji  3 месяца назад

      Thank you! 😊❤️ Itni acchi feedback milke sach mein khushi hui! Aise hi support karte raho, aur hum aur bhi zyada mast content lekar aayenge. Stay tuned! 🙌🎉

  • @angshumandebnath1035
    @angshumandebnath1035 2 года назад +4

    Sir mera ek question hay
    What is the importance of Bill of steel and how much Percentage it should be of the total amount of building??

  • @So77nu
    @So77nu 2 года назад +2

    No of bars for A =10 for B =10
    Cutting length for A=1.56, for B= 1.53
    Total steel =(8×27.47)=219.76kg

  • @mathavanseenivasan2085
    @mathavanseenivasan2085 2 года назад

    Good explanation Sir.....thank you.

  • @bimalkumar7589
    @bimalkumar7589 10 месяцев назад +1

    Thanks Sir god bless you from Nepal

    • @Civil_Guruji
      @Civil_Guruji  10 месяцев назад

      Thank you so much for your good wishes. I greatly appreciate your love and support.

  • @shoabkhan2569
    @shoabkhan2569 3 месяца назад

    Achha bataya sir ji🎉

  • @nikhilpatil.1181
    @nikhilpatil.1181 2 года назад +1

    Really awesome lecture sir......

  • @FactsTezNilesh
    @FactsTezNilesh 2 года назад +5

    Cutting Length = 1.55 &1.52m
    Total weight = 224 kg
    Total amount = 11,200 Rs
    Binding wire = 2.24 kg
    ☺Thank you Sir.।।।।

  • @ketanrathod5130
    @ketanrathod5130 Год назад +1

    Sir column ke upar aisi hi interesting video leke aaiye 🙏please

    • @Civil_Guruji
      @Civil_Guruji  Год назад

      Sure 😈 Demon
      Humne apke request ko apne expert trainer ke sath share karenge aur bahut jald iss topic par hum video lnayenge.

  • @nazamjafri9653
    @nazamjafri9653 2 года назад +9

    Nos of bar in both direction =10, 10
    C. L of RA=1.55
    C. L of RB=1.52
    Wt of steel in A direction=13.77
    Wt of steel in B direction=13.51
    Total Wt of one Footing=28 Kg
    Total Wt of F2 Footing=28*8=224 Kg
    Unit rate of steel=60 Rs/kg
    Total amount of steel=13440
    Contingency of binding wire=2.24kg
    Please check and mention correct Or not

  • @dharmendersoni7891
    @dharmendersoni7891 2 года назад

    Or sab aapne bhut ache se samjaaya thanks

  • @bimalkumar7589
    @bimalkumar7589 5 месяцев назад +1

    God bless you sir 🙏🙏🙏

    • @Civil_Guruji
      @Civil_Guruji  5 месяцев назад

      Thank you very much for your Love and Support . I appreciate your expression of support and goodwill. Let us continue to learn and share knowledge together.

  • @nitingaikwad5866
    @nitingaikwad5866 Год назад +1

    Sirji bahot badiya video

    • @Civil_Guruji
      @Civil_Guruji  Год назад

      Thank you
      Nitin Gaikwad
      Hame bohat khusi hai ki aapko hamari mehnat pasand aai , Civilguruji isi tarah civil engineers ko aage badane ke liye mehnat karte rahega aur aap bhi knowledge dusro ko share karte rahe.
      KEEP LEARING, KEEP SHARING.

  • @arjunprasad1640
    @arjunprasad1640 9 месяцев назад

    Very nice knowledge sir.

  • @ergaurav99
    @ergaurav99 9 месяцев назад +1

    Estimation and valuation ke free lecture leke aao Bo bhi practical data ke ...

  • @singh_good.mainassociate6500
    @singh_good.mainassociate6500 5 месяцев назад +1

    You are best techar

    • @Civil_Guruji
      @Civil_Guruji  5 месяцев назад

      Thank you very much for your Love and Support . I appreciate your expression of support and goodwill. Let us continue to learn and share knowledge together.

  • @Arjun8090
    @Arjun8090 Год назад +1

    Acche se samaj aaya

  • @brmakwana5533
    @brmakwana5533 2 года назад +1

    Extra ordinary video hai sir...

  • @Babychill924
    @Babychill924 2 года назад +1

    Thank you so much sir vry nice teaching

  • @mohammedqasim5923
    @mohammedqasim5923 2 года назад

    Thanks sir helpfully video

  • @sakshiconstruction
    @sakshiconstruction Год назад +1

    बहुत बढ़िया

    • @Civil_Guruji
      @Civil_Guruji  Год назад +1

      Dear Sakshi construction
      Thank you for your kind wishes. Your support is greatly appreciated. We will continue to strive for excellence and share our knowledge with others. Thank you again for your encouragement. Keep Learning, Keep Sharing.

  • @AliHaider-db6eb
    @AliHaider-db6eb Месяц назад

    Footing 2
    10 No. Of bars on both directions
    Cutting length on the main bar is 1.55m
    Cutting length on the distribution bar is 1.53m