A303 Dualling • February 2024 • Westbound, Sparkford to Podimore, Somerset, ENGLAND.

Поделиться
HTML-код
  • Опубликовано: 5 янв 2025

Комментарии • 9

  • @timstradling7764
    @timstradling7764 11 месяцев назад +1

    They seem to be getting on quite well now. Wish they’d do something about Stonehenge.

  • @aalan4296
    @aalan4296 11 месяцев назад +2

    It will be fantastic when its done, now all they have to do is sort out the Ilchester By-Pass and make it a proper dual carriageway, put some flyovers on the various A303 roundabouts and finally sort out Stonehenge. Should be done by the end of the century.

    • @roadsandthings
      @roadsandthings  10 месяцев назад

      It needs simple grade separated junctions, Ilchester bypass would work without the bottleneck roundabouts...I do hope it won't be that long but I fear you may be right!

  • @hazelltree
    @hazelltree 11 месяцев назад

    about time it was completed

    • @roadsandthings
      @roadsandthings  10 месяцев назад

      It seems to me over the last couple of years that they have had only a skeleton workforce ....... I'm sure it could have completed much sooner if the same manpower thats being used on the A465 dualling was used.

  • @redjackdeer5154
    @redjackdeer5154 10 месяцев назад +1

    One ☝️ day ALL roads will be like this, Oh I’ve just seen a pig 🐖 fly over.

  • @paguk2000
    @paguk2000 10 месяцев назад +1

    Why is this 12 months late why are we so bad at building infrastructure

    • @roadsandthings
      @roadsandthings  10 месяцев назад

      Each drive-through the size of the workforce is seems small for such a project.

    • @Jabber-ig3iw
      @Jabber-ig3iw 8 месяцев назад

      @@roadsandthingsthe fine for finishing late is less money than employing the workers you need to finish on time, same for any road project anywhere in the country, none ever finish on time.