#flexiblepavement

Поделиться
HTML-код
  • Опубликовано: 18 янв 2025

Комментарии • 51

  • @kushkaushik3318
    @kushkaushik3318 3 месяца назад

    A lot of thanks Respected Sir , Just because of you I learnt this much about CTB.

    • @SatishIITR
      @SatishIITR  3 месяца назад +1

      Really happy to see that it was helpful. Keep watching

  • @AllinOne-kg5hf
    @AllinOne-kg5hf Год назад

    Most beautiful explanation

    • @SatishIITR
      @SatishIITR  Год назад +1

      Thanks a lot 😊 Keep watching

  • @civillaboratorytest
    @civillaboratorytest Год назад

    Your explanation is very good sir I always saw your video

  • @SatishIITR
    @SatishIITR  Год назад

    one correction at 1.47, the laboraroty strength should at least be 1.5 times the minimum field UCS stipulated in the contract.

  • @peshawargoats3411
    @peshawargoats3411 5 месяцев назад

    Super explanation

  • @yasawantsinghyadav2406
    @yasawantsinghyadav2406 Год назад

    Sir bhut acha teaching krate hi ap 🔥🔥

  • @surajpudke5686
    @surajpudke5686 11 месяцев назад

    Good explanation sir.

    • @SatishIITR
      @SatishIITR  11 месяцев назад

      Thanks for liking. Keep watching

  • @TarifKhan-fx7ng
    @TarifKhan-fx7ng 5 месяцев назад

    Sir pls CTSB PR EK VIDEO JARUR. BNA DIJIYE HINDI ME

  • @mscivilconstruction2338
    @mscivilconstruction2338 Год назад

    sir thanks for in hindi well done sir

    • @SatishIITR
      @SatishIITR  Год назад

      So nice of you. Keep watching

  • @enricoshira7013
    @enricoshira7013 4 месяца назад

    Sir can you please explain which quality control checks are to be conducted for CTB layer at field and how those QC tests at field are carried out?

    • @SatishIITR
      @SatishIITR  4 месяца назад

      watch this video.
      ruclips.net/video/SKmL_XXqCEc/видео.html
      I have uploaded three more videos on quality controls

  • @sujitdhital2284
    @sujitdhital2284 Год назад

    Sir is it 1.1 time or1.5 time the field strength.

    • @SatishIITR
      @SatishIITR  Год назад

      Thanks Sujit ji, it is 1.5 times.

  • @daksheshwar9108
    @daksheshwar9108 11 месяцев назад

    Respected Sir,
    Just like you have explained CTB to us so well, why don't you make a video for CTSB also and explain it to us better.

    • @SatishIITR
      @SatishIITR  11 месяцев назад

      Ok, will do

    • @daksheshwar9108
      @daksheshwar9108 11 месяцев назад

      Dear Sir,
      I'm a big follower of yours. You had designed the bituminous, base & sub base of our pwd project for the last 10 years ego. During that time, I'm in CEC Company. From your videos, we have got a lot of deep knowledge, and a lot of concepts have become clear.

    • @SatishIITR
      @SatishIITR  11 месяцев назад

      Thank you so much. Ab aap kis company ke saath hai? I had gone to CRRI as Director for 6 years, now back in Roorkee. Come to IIT whenever you happen to be this side.@@daksheshwar9108

    • @daksheshwar9108
      @daksheshwar9108 11 месяцев назад

      Dear Sir,
      Right now, I am in Dinesh Chandra R.Agrawal Infracon Company, and my project is Delhi-Mumbai Expressway. It will be my good fortune to get a chance to meet you.

  • @gvarun2192
    @gvarun2192 10 месяцев назад

    Sir,
    Thanks for the video and share the procedure for casting of Cubes for CTSB.
    If possible Pls make a video of difference between compressive strength and UCS...

    • @SatishIITR
      @SatishIITR  10 месяцев назад +1

      Will prepare a video on CTSB soon.

  • @civillaboratorytest
    @civillaboratorytest Год назад

    Respected sir I request you that please make video for testing because many engineers no information that what porpuse of test

  • @parasmanisindhia4493
    @parasmanisindhia4493 Год назад

    Sir,
    is there any video in IRC SP 59 2018

    • @SatishIITR
      @SatishIITR  Год назад

      No, I have not uploaded yet.

  • @daksheshwar9108
    @daksheshwar9108 11 месяцев назад

    Dear Sir,
    If the strength can be anything between 4.5 Mpa to 7 Mpa, the contractor will always take 4.5 Mpa, then when and under what condition will we take the strength of 7 Mpa ?

    • @SatishIITR
      @SatishIITR  11 месяцев назад

      I have faced this question earlier also and I do not have straightforward answer here. In any case the mix is to be designed in the laboratory and the lab strength should be 1.5 time the required minimum field stregth. Therefore nothing to worry.
      In case you want more strength than 4.5 MPa, make it part of your contract document. In case of stabilized material, the strength keeps on increasing with time.

    • @daksheshwar9108
      @daksheshwar9108 11 месяцев назад

      Dear Sir,
      There can be a question of some error/miss concept, because after multiplying the strength of 4.5 Mpa by the design factor it comes to nearly 7 Mpa (4.5 x 1.5 = 6.75 Mpa) . What can be said that field strength is 4.5 Mpa and design strength is 7 Mpa ?

    • @daksheshwar9108
      @daksheshwar9108 11 месяцев назад

      Dear Sir,
      It is quite possible that I am wrong according to the IRC standard, but this is how I understood it and I have implemented it on the project in such a way that 4.5 Mpa will be the field strength and 7 Mpa will be the design strength. Because technically this is not wrong, I feel like this in Confusion in CTSB too, that's why I requested you to make a video on this topic too.

    • @SatishIITR
      @SatishIITR  11 месяцев назад

      Incidently your answer is correct, but pocedure is not.@@daksheshwar9108

  • @civillaboratorytest
    @civillaboratorytest Год назад

    Make a video for concrete mix design

    • @SatishIITR
      @SatishIITR  Год назад +1

      It was uploaded last Sunday only. watch it and give your feedback.

  • @Dhananjaykumer
    @Dhananjaykumer Год назад

    Sir CTSB mix design

    • @SatishIITR
      @SatishIITR  Год назад

      CTSB ka as such koi design nahi hai.

    • @Dhananjaykumer
      @Dhananjaykumer Год назад

      @@SatishIITR CTSB mix design

    • @SatishIITR
      @SatishIITR  Год назад +1

      CTSB ka mix design bhi bilkul aise hi kiya jata hai. sirf UCS ki requirement change ho jati hai.@@Dhananjaykumer

  • @mscivilconstruction2338
    @mscivilconstruction2338 Год назад

    sir dlc design in hindi

    • @SatishIITR
      @SatishIITR  Год назад

      Already uploaded. watch here
      7. Dry Lean Concrete: ruclips.net/video/e66Q8wmJGlU/видео.html

  • @kunalpandey6221
    @kunalpandey6221 Год назад