In my three years career in Diploma(power option).I wasn't taught this, theory with zero practical.Oooh at the right time,things become beautiful says the Lord. You have made me built confidence in myself.
since i graduate from university i did not get good wiring like this and thanks you so much for your effort to make this to be known in the whole world
Am biomedical engineer by professional... This kinda wiring is the best one can offer to the students who are doing electrical engineering and Biomedical engineering...
I have seen some people asking for these cut out fuses. You can get a separated earth neutral model or a combined earth neutral model so if you don’t wanna come by them, you don’t have to but obviously obviously it has to fit with the electrical systems design. On the right hand side in the orientation is here you can see there are three smaller bolts on the cutout. If you use that side to punch out holes then neutral and earth can be put individually and very are a much secure Fitt I thought I’d let you know these things just cause I’ve worked on these before. There hasn’t been a budget limit on the distribution network in the UK soI know a lot of the tips and tricks to do with these
❤❤❤ you are the best. I struggled with power electrical some years ago but now I have more knowledge. Keep it up bro. God bless you. I love the way you teach ❤❤❤❤❤
Wow I had forgotten your username en tried to recall afterwards I got you back. Thanks for your better service you provide to us. We love you so much 💯👈
that Lesson was good, i always encourage the use of cable lugs for the meter dressing and the Earth Connection, it give a very strong torgue and grasp by the screws
Hello thanks for the technical lessons, can u do for us back up system with an automatic change of over ,Le 🏠 using both electricity and solar power, iam in Uganda
Hello sir, I'm new here, and I'm watching from Sierra Leone, My names are Alpha Amadu Bah, I really enjoy your practical lecture. I want to ask, what is the meaning 6 way or 12 way consumer unit? Please help me boss.
Hello Alpha. Thanks for joining my community here. A 6-way consumer unit means it can accommodate 6 mcbs and a 12-way means it can hold 12 mcbs or 12 different circuits.
Thanks very mush sir , but I want to ask you a question, you tired neutral and earth wired together in the same pole, so am confused about that or if earth wired and neutral wires tired together there will be know problems right?
Is that on the cut out fuse? If that is the case it’s meant to just give you an option where to put it as if we’re fitting it somewhere where where another rent was used you have to make it work.
In my three years career in Diploma(power option).I wasn't taught this, theory with zero practical.Oooh at the right time,things become beautiful says the Lord.
You have made me built confidence in myself.
same!
Same
I'm so impressed by your feedback Denis!
since i graduate from university i did not get good wiring like this and thanks you so much for your effort to make this to be known in the whole world
The good connection i ever seen and its also easy to understand
I really appreciate your comment Mayian!
@@elishaowuorongoro3843 thank you so much.
Am biomedical engineer by professional... This kinda wiring is the best one can offer to the students who are doing electrical engineering and Biomedical engineering...
Hello Engineer Francis! I appreciate your comment.
Thanks a lot. I have watched a lot of RUclips videos.. you are the best. Sound English,high quality videos and clarity of explanation ❤
What a great feedback Wiseman Lutomia! I'm really humbled.
Sir this video is very good for us
Thank you so much Top Boss Anwar for your feedback.
I have seen some people asking for these cut out fuses. You can get a separated earth neutral model or a combined earth neutral model so if you don’t wanna come by them, you don’t have to but obviously obviously it has to fit with the electrical systems design. On the right hand side in the orientation is here you can see there are three smaller bolts on the cutout. If you use that side to punch out holes then neutral and earth can be put individually and very are a much secure Fitt I thought I’d let you know these things just cause I’ve worked on these before. There hasn’t been a budget limit on the distribution network in the UK soI know a lot of the tips and tricks to do with these
I am learning very clear explanation thanks keep up brother
❤❤❤ you are the best. I struggled with power electrical some years ago but now I have more knowledge. Keep it up bro. God bless you. I love the way you teach ❤❤❤❤❤
I really appreciate your feedback @@GoldenKamwendo-ib6si
Where are you following me from?
Am very happy for everything that you are given me I am from smailng cost of west Africa the Gambia
You are very virtuoso in you electrical works ,God bless you for teaching me new installation
Glad to hear that Isaac! Thanks 🙏🏽
Good evening sir thank you so very much for bringing this idea's of teaching. This coming from sierra leone 🇸🇱
Today's lesson well understood thanks a lot👷
Thank you so much for your feedback Jomo 🙏🙏
Good topic engineer well under stood
Thank you so much Eric!
The explanation is well under stood
I am glad you do Yusif.
Wow thank u for coaching members u did great job let almighty God bless u🎉🎉🎉
Thank you so much Moses for your kind words and feedback.🙏🙏
This is great bro, continue with that spirit
Ooh,this what i wanted,God bless engineer😊
Good work my teacher of electrical installation
your videos are top-notch Sir thank you
Really! Thanks for your feedback as usual 🙏🙏
What if we put the supply cable that is coming from the meter to the main breaker on it's outlet, what would happen in case of over load can it trip
Am am great full ❤am loving electrical engineering
I'm glad you do Ogwang.
This video was so educative, please keep up the good work.
Thanks so much brother.Junior engineer here
Wonderful teaching i believe i will learn more from you sir and am looking forward to learn to connect a geyser
You are in the right place Clement!
Wow I had forgotten your username en tried to recall afterwards I got you back. Thanks for your better service you provide to us. We love you so much 💯👈
Thank you for your kind words Kepler!
Great job well done watching from Ghana
Thank you so much Michael. I'm happy to have you here.
that Lesson was good, i always encourage the use of cable lugs for the meter dressing and the Earth Connection, it give a very strong torgue and grasp by the screws
Amazing Explanation... Thank you
You are welcome
Hi everyone of the that are watching this lesson , thank you very much can you continue teaching us I like the link 😊😅
Hello Obvious, I am grateful to have you here. I will for sure!
Thanks for the lessons
I appreciate you taking your time here Jonathan, it means a lot to me.
Been waiting for this thank you sir
I’m so honored to be the one sharing it with you Evans. Thanks for your patience.
I have Learnt about it now. Thank you very much.🎉
I really appreciate your feedback Sakala.
You deserve my subscription and like
I really appreciate Jackson
Thanks for the knowledge
I am new here but l aso like the way you are really teaching👍
You are welcome Henry!
May the Lord give you long life for us sir🙏, we thank you so much 🙏🙏🙏
Thank you Ansenaa 🙏🏿🙏🏿
I salute you , your work is so nice
Thanks a lot Danston, it means the world to me.
❤ nice good information
Thank you Sameer!
Very understandable teaching skills
Thank you so much for this feedback.
Nice lesson Mr John ❤
Thanks Ronald.
interesting thanks for this video
You are welcome! Glad you found it helpful.
What institutions would you recommend for Electrical Technician course?
Great content
Top boss i thank,oh my goodness
Hello thanks for the technical lessons, can u do for us back up system with an automatic change of over ,Le 🏠 using both electricity and solar power, iam in Uganda
Hello Webbo, I am working on it. I will release it soon. How is Uganda?
Yes thanks, I have client who wants it's in two months time.when I come over to Kenya I hv to see you
🎉Daniel watching from Vera technical Nakuru Bahati
I can't tell you how grateful I am to have you on the platform Daniel, thank you so much. Say hello to your comrades.
Thank you sir for your lesson, watching from Tanzania.
Wow! I am so grateful Ben. I hope to visit Tanzania soon!
@@topheightselectricians welcome feel at home
👏👏👏 keep up well done 👍👍
Absolutely Victor. Thanks!
Have you done a video for a 3-phase connection?This one is for single phase.
How can I reach you engineer
Good teacher goat of electricity ❤
Great job, Boss. Please throw more light, why you connected earth wire to the neutral cut out out put,sir.
Why do you always use a C100/C36/C6 circuit breaker
thanks so much for this totorial
Thank ubso educative at campass I didn't learn anything but here I did
Your response has lightened up my heart! Thanks.
Thank you for learning ours
You are welcome Abdi.
I'm Electrical thank you
Glad to know you Bartholomew.
Great job
Thanks Maina
I love your simplicity well done😊
Thanks man
Best of best ❤❤❤❤❤❤❤
Thank you sir for your lesson
Thanks for watching David.
I appreciate your efforts, sir can you make three phase energy meter if it is possible. Thanks
Hello Muhammad, sure!
You earth connection and neutral connection can be connected together?
Before the energy meter yes. It also depends on the rules of your region.
What are the disadvantages of bonding earth and neutral?
Well taught. Can we use a dp in place of a cutout?
Wonderful.I use a 500 watts inverter,do I need earthing?
Good question. What is the purpose of earthing Erick?
Quite beneficial, keep it up Engineer
Thanks Mohammed, I will 💪
Good job 💪 like the lessons.
Thanks Ali.
Thank you sir
I do that every day good and smart
But that are private meter please
Good teaching skills
Thank you so much Patrick!
Is the earth and neutral coming from the place
Top looking forward to learn more from you
Hi Ravi, it's my pleasure.
What's the reason as to why you naile earthing wires on the metalic meterbox
Great question Micah, the meter box is metallic. Anything metallic in an electrical installation should be earthed.
Dpmcb ni amp ngapi ya metre box and do we use the same mm za wire drop kwa metre box
It's good physical we are Best people thank you God be with we
I am so grateful for you!
Hello sir, I'm new here, and I'm watching from Sierra Leone, My names are Alpha Amadu Bah, I really enjoy your practical lecture.
I want to ask, what is the meaning 6 way or 12 way consumer unit? Please help me boss.
Hello Alpha. Thanks for joining my community here. A 6-way consumer unit means it can accommodate 6 mcbs and a 12-way means it can hold 12 mcbs or 12 different circuits.
When doing this i hope power from main pole is off yeah?cause I can see you are touching it without cloves
Class on topsir💓💓💓
Thank you Kelvin
Thanks very mush sir , but I want to ask you a question, you tired neutral and earth wired together in the same pole, so am confused about that or if earth wired and neutral wires tired together there will be know problems right?
Great question Vepor! If wired before the energy meter it's OK but after it it's not correct.
@ Good afternoon sir I didn’t understand your answers sir
I
Iiked
the
video
Thanks for the rich professionalism guidence you are great and very humble
I appreciate it! That’s very kind of you to say.
Learning alot from you,,,, could you please explain how we connect token meters
Thanks a lot Moses. Yeah sure! I will collect several token meters and demonstrate.
Hello how to connect a junction box
Thx soo much bro.
You are welcome!
So where will grounding pole behind my house in the ground be connected to
So the earthwire goes in with the neutral wire in the cutout upto the consumer unit?
No, the earth wire connects to the neutral at the meter board but at the consumer unit they're separate. TNC-S system.
Great question Tumasalim.
Correct Peter, thanks for sharing your genius.
Is the neutral and earth connected in one hole?
In this case, this is a complaint neutral earth cartel you can get separated neutral earth cut out as well
does the neutral and earth wire meet?
Wondering that also
Can the double pole switch be pleased after energy meter
Good question Turb. Yes it can.
Kindly do 3-phase meter box connection
Noted Nela.
Hello, I'd like to enquire if you are familiar to this statement "hanging neutral"..if so what does it mean?
Hello too Atieno and great question that you have asked. Did you mean a floating neutral?
@@topheightselectricians yes
I saw 2 inlets of the phase side but am seeing only one connection
Is that on the cut out fuse? If that is the case it’s meant to just give you an option where to put it as if we’re fitting it somewhere where where another rent was used you have to make it work.
How to connect a junction box sir
Pls make a video on how to wire prepaid meters. Thanks in advance
Well noted and working on it Atieno, I will notify you once I drop it.
Hello...is it still in plan?
What about of three phase connection
I will cover it too, thanks.
Earth rod distance yake ya ground
holy moses... you're amazing
😂😂 it's because you are Action!
good work
Thank you, I've seen your channel, great work too!
😮 more videos
Please for a video on how to choose circuit breakers
Absolutely Tanyi, I already covered it.
@@topheightselectricians please for the link
@@tanyiemma4680 here you go: ruclips.net/video/b_nOZsSigPY/видео.htmlsi=6aKUNZYoXgBLx5Y3