    This specialized process can be broken down into 6 distinct steps:
    1. Site Preparation & Pouring the Foundation Slab
    All required materials and equipment are gathered for the job. Next, the concrete floor slab is poured.
    2. Forming of Tilt-Up Wall Panels and Adding Formliners
    The crew assembles the panel forms on the floor slab. The panel forms serve as molds for the concrete. Each form provides the panel’s exact shape and size as well as openings for doors and windows
    3. Panel Reinforcement and Installation of Lifting Inserts & Embeds
    Up next, workers tie in the steel grid to reinforce bars into each form. This part of the process gives the panels additional structural integrity. Workers also install inserts and embeds, which will be used to lift the panels later
    4. Pouring Concrete Tilt-Up Panels & Adding Insulation
    Concrete is poured into the prepared forms to create the panels. Sandwich Insulation is also encased into each building panel. To give tilt-up structures true edge-to-edge insulation.
    5. Lifting Concrete Panels in Place
    The concrete panels are given time to solidify; The crew then connects the panels to a crane.
    The crane then lifts the panels from the floor slab into position. From here, the workers will connect the panel’s braces to the slab. The crew moves to the next panel and repeats this process until all panels are tilted up and secure.
    6. Panel Finishings & Caulking Joints
    During the last step of the process, the building begins to look like a finished product. Exterior wall finishes, take place, and the joints are also caulked to prevent water penetration
    To learn more about Tilt Wall’s process
    Facebook: / tiltwallontario
    Twitter: / tiltwallontario
    Instagram: / tiltwallont. .
    LinkedIn: / tilt. .
    Learn more at tiltwall.ca/
    Tel: 519-602-2990
    info@tiltwall.ca
    #tiltup
    #concrete
    #thinkconcrete
    #didyouknow
    #precast
    #readymix

Комментарии • 17

  • @2jay_451
    @2jay_451 18 дней назад

    Didn't even know about this process till now during my course in building. Super efficient, effective, easy and slightly futuristic lol.

  • @D.N.R.911
    @D.N.R.911 2 года назад +1

    Oh yeah, so glad that I help design these buildings.

  • @alameenabdulrahman6752
    @alameenabdulrahman6752 3 года назад +3

    Beautiful process, stayed interested all through

  • @RealG.Washington
    @RealG.Washington Год назад +1

    Jist finished lifting panels today baby! No incidents to report lol

  • @DIERKONSTRUKSICHANNEL
    @DIERKONSTRUKSICHANNEL Год назад

    Nice beautiful process gaes👍👍

  • @user-mv4nt9xk4i
    @user-mv4nt9xk4i Месяц назад

    What inspections are needed in the process?

  • @Polyfamily123
    @Polyfamily123 3 месяца назад

    I can build a house this way 😊

  • @martinnzomo9465
    @martinnzomo9465 2 года назад +1

    Where can I get the forming agent in Kenya

  • @josuemorel422
    @josuemorel422 2 года назад +2

    Do you guys use dowel subs to connect the panel to the interior slab on grade?

  • @nateellis5939
    @nateellis5939 Год назад +1

    How do they hold up to earthquakes?

    • @xemmyQ
      @xemmyQ Год назад

      probably not well since they fail against even an EF1 tornado

  • @AuroraBilqiez
    @AuroraBilqiez 5 месяцев назад

    Lemang france

  • @Minuteman_Expeditions-wo2cp
    @Minuteman_Expeditions-wo2cp 2 года назад +1

    ICF concrete is better. No crane needed