Excavation depth is wrng. In TB it's given 2.9.It's 0.1+0.7+1+0.9+0.20.1- road level to manhole cover btm.0.7- manhol btm to slab top1 and 0.9 right side it's given0.2 pcc
Nice ❤️
Thanks
Very good
tq sir
can u slove problem of aqueduct
sorry , I haven't studied that yet
Why did u take 1 number in earthwork in excavation
For any excavation work no will be 1 Because we exacavate at any place only once
How 2.90 in height2.80 is right ... excavation
From Gl to top of slab 0.7 Slab thickness .12+1.5 +.4+.2 Overall 2.92 mSo approx 2.9m taken
How are you getting quantity
Please go through the whole videoYou will understand
Or refer This question from bn Dutta estimating and costing
Aqueduct ko solve
Sorry I haven't studied that
Excavation depth is wrng. In TB it's given 2.9.
It's 0.1+0.7+1+0.9+0.2
0.1- road level to manhole cover btm.
0.7- manhol btm to slab top
1 and 0.9 right side it's given
0.2 pcc
Nice ❤️
Thanks
Very good
tq sir
can u slove problem of aqueduct
sorry , I haven't studied that yet
Why did u take 1 number in earthwork in excavation
For any excavation work no will be 1
Because we exacavate at any place only once
How 2.90 in height
2.80 is right ... excavation
From Gl to top of slab 0.7
Slab thickness .12
+1.5
+.4
+.2
Overall 2.92 m
So approx 2.9m taken
How are you getting quantity
Please go through the whole video
You will understand
Or refer This question from bn Dutta estimating and costing
Aqueduct ko solve
Sorry I haven't studied that