  • This video contains the detail estimation of slab culvert along with the 3d model for the clear visualization.Most of the students feel difficulty for the visualization of the sectional views and half sectional views so here we have made an attempt to explain the object with the 3d view so it will give you the clear concept.Here we have done the estimation of :
    1.Earthwork in excavation
    2.Cement concrete in foundation
    3.1st class brickwork in cement mortar\
    4.RCC work
    5.Steel bars in RCC work
    6.Cement concrete 1:2:4 wearing coat
    7.Cement pointing
    Detailed explanation for bar bending schedule of slab culvert along with 3d: • BAR BENDING SCHEDULE (...
    You can watch the estimation of a single roomed building with verandah from this link: • ESTIMATION OF A SINGLE...
    You can watch ESTIMATION OF TWO ROOMED BUILDING WITH 3D BY LONG WALL SHORT WALL METHOD ||M.CHAKRABORTI||IOE||TU|| from this link :
    • ESTIMATION OF TWO ROOM...
    You can watch Estimation Of Two Roomed Building With Verandah (M.Chakraborti ) from this link :
    • Estimation Of Two Room...
    AND IF YOU LIKE THIS VIDEO PLEASE SUBSCRIBE FOR MORE INSPIRATION TO MAKE SUCH VIDEOS.
    Also join in our facebook page : / adv-learning-107385177...

Комментарии • 77

  • @ADVLEARNING
    @ADVLEARNING  3 года назад +9

    If you are considering the traingular earth slope portion only on one side then deduct 2*area of triangles .But if we consider side slope on left and right side of slab culvert like in the 3d above ,then deduct 4 *area of triangle. i.e In my case, quantity will be 4*1/2*1.3*1.3 m^3 because these portions will be covered by the earth .

    • @banglamathworld4209
      @banglamathworld4209 3 года назад

      You are great madam

    • @aslshining1
      @aslshining1 Год назад

      hello, why do we deduct the triangular area? in the first place we only do pointing for face wall parapet and coping ? Thank you.

  • @ADVLEARNING
    @ADVLEARNING  4 года назад +5

    Link for Detail explanation of bar bending schedule ( calculating the number of bars and their length) along with 3d is given in description box do check it out.

  • @rameshyadav-bl5hj
    @rameshyadav-bl5hj 2 года назад +1

    missing last part and also in calculation of main bar c/c spacing is 30 cm must be used ( in question it is given 15 cm spacing which is spacing of one main bar then bent bar ,again main bar and then bent up bar.. )

  • @razdeu8468
    @razdeu8468 3 года назад

    Mam rcc box culvert ka b please 3d drawing ke sath explain video bonao.. Bht knowledge sikaaa aapke video dek ke. Awsome mam

  • @nikeshwaiba2254
    @nikeshwaiba2254 4 года назад +2

    Aich kada
    Keep it up 😄

  • @sunilmandal5991
    @sunilmandal5991 2 года назад +2

    Your teaching style is unique on youtube...nobody can explain like you in the world thakyou very much madam👍️👍️👍️

  • @pradiptakumarsahoo5315
    @pradiptakumarsahoo5315 Год назад

    Kindly upload video on estimate of Hume pipe culvert plzz....

  • @pbdr4828
    @pbdr4828 5 месяцев назад +1

    😂😂

  • @साहित्यिकसन्सार

    THANKS ALOT

  • @bishnudhakal7745
    @bishnudhakal7745 2 года назад +1

    Your teaching style is superb 👌 I am feom Nepal. I watch your video regularly... Keep going.. I am clear now on the estimate of slab culvert

  • @happydev4499
    @happydev4499 Год назад

    Sir please make video on estimates of canal fall

  • @jeetkumarpresents5456
    @jeetkumarpresents5456 10 месяцев назад

    Very very wondeful video with 3 D modelling ,, thank you very much for this beautiful video , very very informative 😍

  • @rushabhsamrit4795
    @rushabhsamrit4795 3 года назад +1

    Hello it's too much awesome learning from you👍👍🔥
    Can u do a video on sluice tank, and culvert from Chakraborty....if you make a video on it it's too much beneficial....!

  • @shineiko6900
    @shineiko6900 Месяц назад

    please upload about Arch culvert also

  • @laxmanshahraja3471
    @laxmanshahraja3471 4 года назад

    Wow great🙏💚

  • @harshilbhuva
    @harshilbhuva 3 года назад

    Nice tutorials... Mam can u share the 3d. Models pls

  • @er.tulsirampokhrel805
    @er.tulsirampokhrel805 3 года назад

    wow 💓
    Great diju

  • @miteshkamat3275
    @miteshkamat3275 5 месяцев назад

    Nepali ma chai boldinu paryo.

  • @maheyshh66
    @maheyshh66 2 года назад

    Very confusing in reinforcement.
    In main bar and bent up bar, the reinforcement used in both are same or not (i.e. Diameter and C/C distance)

  • @mohammadzaheenkhan7451
    @mohammadzaheenkhan7451 2 года назад

    Great .

  • @ebinnakarmicrn0613
    @ebinnakarmicrn0613 4 года назад +2

    Had a torrid time visualizing slab culvert in 3d and coudlnt solve it at the first time, and then saw this video with complete 3d and could solve it easily now, thank u for providing wonderful tutorial

    • @ADVLEARNING
      @ADVLEARNING  4 года назад +1

      Thanks .Its good to see that these videos are helping some engineering friends

    • @keshabsubedi3680
      @keshabsubedi3680 3 года назад

      End coping repeated

  • @namsu8853
    @namsu8853 2 года назад

    16:00 ma side cover assume garnuvako ho????
    Please reply

  • @Sam-je4yh
    @Sam-je4yh 2 года назад

    Can you provide images and Excel for this estimate plz reply asap

  • @hellosuti
    @hellosuti Месяц назад

    Thank you so much. 🥰
    It helps me a lot. ❤

  • @aashishsys
    @aashishsys 10 месяцев назад

    NEC ma padhauna aunu paryo hajur

  • @bobanand4893
    @bobanand4893 3 года назад

    Plz add vedio of 60 cm fall bed width360 cm depth of water 90 cm

  • @sabindahal9730
    @sabindahal9730 3 года назад +2

    Very helpful one di!!

  • @naturefeelings5665
    @naturefeelings5665 Год назад

    Providing of fall estimation

  • @palak6513
    @palak6513 3 года назад +1

    Mam I have a question ⁉️ for u ....I am not understand why are u assume wait of steel ..... please explain mam ....... 😭

    • @ADVLEARNING
      @ADVLEARNING  3 года назад

      weight of steel is usually constant value so you can assume that value.

    • @palak6513
      @palak6513 3 года назад +1

      @@ADVLEARNING mam can we leave this valve I don't want to be assume 🤔

    • @ADVLEARNING
      @ADVLEARNING  3 года назад

      No u can't leave that .You need to do detail estimate of steel bars also.

    • @palak6513
      @palak6513 3 года назад +1

      @@ADVLEARNING ok mam 🙏🙏🙏🙏

    • @dipakdas1830
      @dipakdas1830 3 года назад

      You can calculate mass of 1m of steel bar by using formula: Mass = Density * volume. Assume 1 m length of any size (eg. 20 mm) of bar and then calculate its volume, and then multiply it by density of steel (7850 kg/m^3). You will get the mass of steel per metre of its length.

  • @srv2989
    @srv2989 3 года назад

    Can you share this 3d model link and estimated value copy

  • @ROYALENGINEERSBHARAT
    @ROYALENGINEERSBHARAT 6 месяцев назад

    Awesome

  • @palak6513
    @palak6513 3 года назад +1

    Mam top distribution bar : 4 how to find mam ..... 🥺🥺 ...???

    • @ADVLEARNING
      @ADVLEARNING  3 года назад

      We assume the value of top distribution bar as 4 according to the length of span.

    • @palak6513
      @palak6513 3 года назад +1

      @@ADVLEARNING but Mam why are u assume only 4..? mam I am very confused about this 😔😔😔

  • @samduplachungpa8923
    @samduplachungpa8923 2 года назад

    Helo maam. May I know which software u used for making 3D diagram of this slab

  • @hukumbohara8324
    @hukumbohara8324 2 года назад

    Very very thank uhh mem👐👐👐

  • @vijaytharu8829
    @vijaytharu8829 3 года назад

    Can you make video of detail estimate of fall ..

  • @bhupendrayadav5246
    @bhupendrayadav5246 3 года назад

    please make video on estimation of manhole and hume pipe

  • @opmajhi724
    @opmajhi724 2 года назад

    Thank you mam

  • @siripalli140
    @siripalli140 3 года назад

    So brilliant superb explanation thank you so much

  • @birendrasingh6361
    @birendrasingh6361 2 года назад

    Mam manholes ka estimate karo nw plz,

  • @themahfujalam6410
    @themahfujalam6410 2 года назад

    thank u so much....u saved my exam

  • @rkmmovie874
    @rkmmovie874 2 года назад

    Thank you mam

  • @xevilrabbit12
    @xevilrabbit12 2 года назад

    awesome

  • @CourseforcivilEngineering
    @CourseforcivilEngineering 3 года назад

    Good explanation

  • @ramsaud2546
    @ramsaud2546 3 года назад

    How we can calculate top distribution bar

    • @ADVLEARNING
      @ADVLEARNING  3 года назад

      We assume the value of top distribution bar as 4 according to the length of span.

  • @himagiri1770
    @himagiri1770 3 года назад

    awesome

  • @me-rina9819
    @me-rina9819 3 года назад

    Thank you so much❤️❤️

  • @bharathreddy1169
    @bharathreddy1169 3 года назад

    Mam what is the dotted lines indicates in drawing..pls give answer mam

  • @ajc4138
    @ajc4138 2 года назад

    Great job 👍

  • @rkmmovie874
    @rkmmovie874 2 года назад

    Plzz Send me the Excel spreadsheet

  • @BlissyBeing
    @BlissyBeing 4 года назад

    Very useful..

  • @bishanbhandari2818
    @bishanbhandari2818 3 года назад

    i think slope of ground given is for waterway outside...

    • @itsmehawa768
      @itsmehawa768 3 года назад

      Top distribution bar number 4 vaneko kasari

    • @ADVLEARNING
      @ADVLEARNING  3 года назад

      Top distribution bar lai 4 assume gareko ho.slab ko span ko adhar ma.

  • @Manfitness3
    @Manfitness3 8 месяцев назад

    Manhole numerical 6 semester civil engineering plz❤

  • @theteddychannel2770
    @theteddychannel2770 4 года назад

    lastai kada dd