First impression had me asking "Is that really going to fit?" Well, just barely. A really tight fit. My dad worked in a traditional shipyard in the 1950s and 60s. Long before modular construction. Seeing a bow section and the bridge at the same time would send him loopy. His experience was the whole hull built, then the launch and finally the superstructure installed in what was termed 'the fitting out basin'.
Thanks For The Great Update ! Stay Safe 2 all Crew ! ( From a Sunny North Kent )😊
First impression had me asking "Is that really going to fit?" Well, just barely. A really tight fit.
My dad worked in a traditional shipyard in the 1950s and 60s. Long before modular construction. Seeing a bow section and the bridge at the same time would send him loopy. His experience was the whole hull built, then the launch and finally the superstructure installed in what was termed 'the fitting out basin'.