Paisley Model Railway Show 2023 - Part 5

Поделиться
HTML-код

Комментарии • 10

  • @AllensTrains
    @AllensTrains 9 месяцев назад

    "Dudley Road" with the Motive Power Depot which had the automatic shutters and wheel changing facility intrigued me! The was definitely a good selection of layouts at this show with a wide variety of themes tackled. Good camera work. Thanks for uploading.

    • @modelrailwayinaction
      @modelrailwayinaction  9 месяцев назад

      Thanks so much for your great comment. Yes, I agree, automated features such as doors and gates add a lot to a layout. This was the first time I had encountered such a wheel changing shed and it was great to see such an innovation. The people running the layout told me they thought it was the only one in existance!

  • @edgein7892
    @edgein7892 8 месяцев назад

    Great video, thanks for sharing.

    • @modelrailwayinaction
      @modelrailwayinaction  8 месяцев назад +1

      Really glad you enjoyed it.

    • @edgein7892
      @edgein7892 8 месяцев назад +1

      @@modelrailwayinaction Well, what's not to enjoy about them?

  • @HumberFlyer
    @HumberFlyer 8 месяцев назад

    Great stuff.... enjoyed that vid'

  • @Railwayrob
    @Railwayrob 9 месяцев назад

    Thanks for sharing this video. I would love to see the first layout in action ‘canal works’. What an amazing layout

    • @modelrailwayinaction
      @modelrailwayinaction  9 месяцев назад

      Yes, that's a good one. Love all the machines in the background turning while the little trains scuttle back and forward.

    • @modelrailwayinaction
      @modelrailwayinaction  9 месяцев назад

      You may also enjoy the similar layout, Chop-It-Up Lumber Company, in the Falkirk Part 4 video - ruclips.net/video/3GZDTFoosVM/видео.html